Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹7.3 CrAdmitted-Finance HARITA M P PIN CODE 461331 | HARITA | HARDA | MADHYA PRADESH | 461331 | ₹7.3 Cr | H1 | Admitted-Finance |
| 2 | H2₹6.7 CrAdmitted-Finance KHARGONE | MADHYA PRADESH | 450551 | ₹6.7 Cr | H2 | Admitted-Finance |
| 3 | H3₹5.8 CrAdmitted-Finance NAGAR NIGAM MARKET 19 MAHU NAKA INDORE M P | INDORE | INDORE | MADHYA PRADESH | ₹5.8 Cr | H3 | Admitted-Finance |
| 4 | H4₹5.2 CrAdmitted-Finance | ₹5.2 Cr | H4 | Admitted-Finance |
| 5 | H5₹5.2 CrAdmitted-Finance | ₹5.2 Cr | H5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DILIP PATIDAR THEKEDAR H2 | AJAY SHARMA H3 | VEDIKA ENTERPRISES H1 | VANSH INDUSTRIES H4 | RELIABLE INDUSTRIAL SOLUTION H5 |
|---|---|---|---|---|---|---|---|---|
| 1.01 | 1.Design and build sewage treatment plant of installed capacity 1.00 MLD and all appurtenant structures and allied works.
2.Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about DI-K-7 class pipe of 200 mm diameter having total length of 425 m from pumping Station to STP. And Construction of 1no pumping stations.
3.Construction of 1 no Interception &Diversion Structure is being proposed at the major Drain formed by the merger of 4 nallahs of Satwas Town.
4.Construction of 2.0 Nos Sand Gravel Filter.
5.Construction of 1 no Pumping Station near by I&D.
6.Reuse plan: - Construction Of 1no Sump capacity 15 KL, 2 Nos Pumps and 150mm Dia DI-K7 Pipe Length – 400 m with 1 no Hydrant.
7.Providing and laying of 0.5 KM Length HT Feeder Line and 1.0 No Electrical Substation.
8.Establishment of Online Control Monitoring System OCMS.
9.Plantation work both side of Nalla & STP Campus and allied works. | 1 | nos | 3,34,15,200 ₹3.3 Cr | 3,39,90,000 ₹3.4 Cr | 3,41,94,888 ₹3.4 Cr | 3,29,90,304 ₹3.3 Cr | 3,18,78,100.18 ₹3.2 Cr |
| 1.02 | Operation and Maintenance Cost next 10 Years | 1 | nos | - | - | - | - | - |
| 1.03 | 1st Year | 1 | nos | 9,11,680 ₹9.1 L | 3,90,000 ₹3.9 L | 9,54,156 ₹9.5 L | 6,35,050 ₹6.4 L | 7,90,000 ₹7.9 L |
| 1.04 | 2nd Year | 1 | nos | 9,75,000 ₹9.8 L | 5,00,000 ₹5 L | 10,24,700 ₹10.2 L | 6,66,803 ₹6.7 L | 7,90,000 ₹7.9 L |
| 1.05 | 3rd Year | 1 | nos | 10,43,000 ₹10.4 L | 8,00,000 ₹8 L | 11,00,500 ₹11.0 L | 7,00,143 ₹7.0 L | 8,10,000 ₹8.1 L |
| 1.06 | 4th Year | 1 | nos | 11,16,000 ₹11.2 L | 13,00,000 ₹13 L | 11,81,900 ₹11.8 L | 7,35,920 ₹7.4 L | 8,10,000 ₹8.1 L |
| 1.07 | 5th Year | 1 | nos | 11,65,000 ₹11.7 L | 17,20,000 ₹17.2 L | 12,69,300 ₹12.7 L | 7,71,908 ₹7.7 L | 8,15,000 ₹8.2 L |
| 1.08 | 6th Year | 1 | nos | 12,78,000 ₹12.8 L | 19,30,000 ₹19.3 L | 13,31,000 ₹13.3 L | 8,10,504 ₹8.1 L | 8,16,000 ₹8.2 L |
| 1.09 | 7th Year | 1 | nos | 13,68,000 ₹13.7 L | 19,80,000 ₹19.8 L | 14,29,400 ₹14.3 L | 8,51,030 ₹8.5 L | 8,17,000 ₹8.2 L |
| 1.10 | 8th Year | 1 | nos | 14,63,000 ₹14.6 L | 19,80,000 ₹19.8 L | 15,35,100 ₹15.4 L | 8,93,582 ₹8.9 L | 9,15,000 ₹9.2 L |
Tender Value
₹3.7 Cr
EMD Value
₹1.9 L
Closing Date
18 Apr 2026, 5:30 pmClosed
CMO NAGAR PARISAD SATWAS
CMO NAGAR PARISAD SATWAS
Interception and Diversion of Nallahs with STP works Project of Satwas Town under SBM 2.0
2026_UAD_489281_1
329
Open Tender
Civil Works - Others
365 days
SATWAS
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹1.9 L
4 May 2026
18 Mar 2026
20 Apr 2026
18 Mar 2026
18 Apr 2026
18 Mar 2026
1.Design and build sewage treatment plant of installed capacity 1.00 MLD and all appurtenant structures and allied works. 2.Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about DI-K-7 class pipe of 200 mm diameter having total length of 425 m from pumping Station to STP. And Construction of 1no pumping stations. 3.Construction of 1 no Interception &Diversion Structure is being proposed at the major Drain formed by the merger of 4 nallahs of Satwas Town. 4.Construction of 2.0 Nos Sand Gravel Filter. 5.Construction of 1 no Pumping Station near by I&D. 6.Reuse plan: - Construction Of 1no Sump capacity 15 KL, 2 Nos Pumps and 150mm Dia DI-K7 Pipe Length – 400 m with 1 no Hydrant. 7.Providing and laying of 0.5 KM Length HT Feeder Line and 1.0 No Electrical Substation. 8.Establishment of Online Control Monitoring System OCMS. 9.Plantation work both side of Nalla & STP Campus and allied works.
Operation and Maintenance Cost next 10 Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B)
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
Power Consuption @ 6.5 Rs per unit
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) ©
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
tenderdoc.pdf
Tender Documents • 2.10 MB
annexure.pdf
Other Document • 3.12 MB
BOQ_576992.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid