Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹12.6 L+₹61,179 (5.12%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Alamu Associates L1 | D RAJENDRAN L2 |
|---|---|---|---|---|---|
| 1.00 | Cut open B.T road Water Supply pipe Line Work Etc., Complete. | 87 | M3 | 750 ₹65,250 Lowest | 995 ₹86,565 |
| 2.00 | Earth work Excavation in all soils for Water Supply pipe Line work Including Refilling the Excavated Earth etc., complete | 675 | M3 | 350 ₹2,36,250 Lowest | 375 ₹2,53,125 |
| 2.01Supply of HDPE Pipes and Specials | |||||
| 2.02 | 140mm Dia HDPE Pipe | 420 | M | 735 ₹3,08,700 Lowest | 735 ₹3,08,700 Lowest |
| 2.03 | 140mm Dia HDPE Bend | 8 | Nos | 1,200 ₹9,600 Lowest | 1,260 ₹10,080 |
| 2.04 | 140mm Dia HDPE Equal Tee | 8 | Nos | 1,300 ₹10,400 Lowest | 1,360 ₹10,880 |
| 2.05 | 140mm Dia HDPE Fusion Coupler | 52 | Nos | 800 ₹41,600 Lowest | 875 ₹45,500 |
| 2.06 | 110mm Dia HDPE Pipe | 516 | M | 455 ₹2,34,780 Lowest | 455 ₹2,34,780 Lowest |
| 2.07 | 110mm Dia HDPE Ben | 5 | Nos | 550 ₹2,750 Lowest | 600 ₹3,000 |
| 2.08 | 110mm Dia HDPE Equal Tee | 5 | Nos | 750 ₹3,750 Lowest | 815 ₹4,075 |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
1 Sept 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Laying of Drinking Water Pipeline from Udayampalayam OHT to Tirumalai Nagar, DTP Street in Ward No.13, North Zone.
2026_MAWS_694689_10
e55/2026-NZ Single
Open Tender
Civil Works
Works
120 days
Coimbatore corporation
As per tender documents
5 documents required · 5 mandatory
₹0
₹15,000
2 Sept 2026
17 Aug 2026
2 Sept 2026
17 Aug 2026
1 Sept 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cut open B.T road Water Supply pipe Line Work Etc., Complete. | 87 | M3 | - | - |
| 2 | Earth work Excavation in all soils for Water Supply pipe Line work Including Refilling the Excavated Earth etc., complete | 675 | M3 | - | - |
| 2.01 | Supply of HDPE Pipes and Specials | - | - | - | - |
| 2.02 | 140mm Dia HDPE Pipe | 420 | M | - | - |
| 2.03 | 140mm Dia HDPE Bend | 8 | Nos | - | - |
| 2.04 | 140mm Dia HDPE Equal Tee | 8 | Nos | - | - |
| 2.05 | 140mm Dia HDPE Fusion Coupler | 52 | Nos | - | - |
| 2.06 | 110mm Dia HDPE Pipe | 516 | M | - | - |
| 2.07 | 110mm Dia HDPE Ben | 5 | Nos | - | - |
| 2.08 | 110mm Dia HDPE Equal Tee | 5 | Nos | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
ITB.pdf
Additional Documents • 0.19 MB
BOQ_835267.xls
BOQ • 0.25 MB
SingleDocument.pdf
Tender Documents • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .