| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAccepted-AOC | ₹13.0 L Quoted ₹13.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.4 LRejected-Finance | ₹13.4 L | L2 | Rejected-Finance REJECTED BEING HIGHER RATES |
| 3 | L3₹14.2 LRejected-Finance | ₹14.2 L | L3 | Rejected-Finance REJECTED BEING HIGHER RATES |
Tender Value
₹16.2 L
EMD Value
₹1.6 L
Closing Date
17 Apr 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF EE PD PWD HARDOI
Construction of Fatka Road to Devrai Link Road Missing Link Road
2026_CEUCZ_1134477_1
1048/M-11/E-TENDER/2026 DT- 01.04.2026
Open Tender
Civil Works - Roads
90 days
HARDOI
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹1.6 L
Yes
4 Jun 2026
10 Apr 2026
17 Apr 2026
10 Apr 2026
17 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 (SOR-253) (Rates are Including Labour Cess but Excluding GST) | - | Cum | - | - |
| 2 | Providing ,Laying and spreading material on a prepared subgrade ,adding cement @ 2 % by weight to the spread material manually,mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub base. (Rates are Including Labour Cess but Excluding GST) | - | Cum | - | - |
| 3 | Providing ,Laying and spreading material on a prepared subbase ,cement @ 4 % by weight to the spread material manually,mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. (Rates are Including Labour Cess but Excluding GST) | - | Cum | - | - |
| 4 | Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits availble land with all lifts and leads, spreading, grading to required slope and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specitaion Clause 303.1 (Rates are Including Labour Cess but Excluding GST) | - | Cum | - | - |
| 5 | Providing and applying tack coat with Bitumen (VG-10) using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (Rates are Including Labour Cess but Excluding GST) | - | Sqm | - | - |
| 6 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508. (Rates are Including Labour Cess but Excluding GST) | - | Sqm | - | - |
| 7 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510 (Rates are Including Labour Cess but Excluding GST) | - | Sqm | - | - |
| 8 | Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 1 st Year & 2nd Year after the Actual Date of Completion Maintenance @ 0.75 % | - | Km | - | - |
| 9 | Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 3rd Year after the Actual Date of Completion Maintenance @ 1.50 % | - | Km | - | - |
| 10 | Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 4th Year after the Actual Date of Completion Maintenance @ 2.25 % | - | Km | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_2117931.xls
BOQ • 0.30 MB
T1.pdf
Tender Documents • 0.60 MB
Download all tender documents and submit your bid