Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC | ₹13.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.2 L+₹527.60 (0.04%)Rejected-Finance | ₹13.2 L+₹527.60 (0.04%) | L2 | Rejected-Finance L2 |
Tender Value
₹13.2 L
EMD Value
₹27,000
Closing Date
25 May 2026, 12:00 pmClosed
EXECUTIVE ENGINEER RURAL ENGINEERING DEPARTMENT
EXECUTIVE ENGINEER RURAL ENGINEERING DEPARTMENT VIKAS BHAWAN 3rd FLOOR MUZAFFARNAGAR
CHC Baghra me timardaro hetu Rainbasera ka nirman karya
2026_REDUP_1150357_4
1961/RED/Tender 19/25-26 Dt 30.03.2026
Open Tender
Civil Works
Percentage
90 days
MUZAFFARNAGAR
CHC Baghra me timardaro hetu Rainbasera ka nirman karya
3 documents required · 3 mandatory
₹766
₹27,000
Yes
MUZAFFARNAGAR
25 Jun 2026
19 May 2026
26 May 2026
20 May 2026
25 May 2026
20 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M and lead upto 30 M.as per Sl. No. DSR 2.8.1 | 51.29 | Cum | 180.05 | ₹9,234.76 |
| 2 | Cement Concrete with 4 cm Brick Ballast, Fine Sand & Cement in the proportion of 1:4:8 including supply of all materials, labour,all as per S.No. DSR 4.1.8 | 14.71 | Cum | 4,712.03 | ₹69,313.96 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level in 1153 (1 cement 1.5 coarse sand 3 graded stone aggregate 20 mm nominal size) As per DSR No-5.1.2 | 30.89 | Cum | 6,257.17 | ₹1,93,283.98 |
| 4 | M.S. or tor steel in plain such as RCC work i/c its cutting, bending & binding complete as SI.504 | 32.01 | Qtl. | 6,893.03 | ₹2,20,645.89 |
| 5 | M-150 class B/W in 1.6 cement & C-sand.infoundation i/c all. as per Sl No DSR 6.12 | 23.01 | Cum | 4,933.55 | ₹1,13,520.99 |
| 6 | M-150 class B/W in 1.6 cement & C-sand in super structure i/c all as per SI No DSR 6.4.2 | 27.99 | Cum | 6,298.8 | ₹1,76,303.41 |
| 7 | Sand filling in plinth SI No. 255 | 12 | Cum | 262.86 | ₹3,154.32 |
| 8 | Earth filling by local earth ic cartage upto 3 km distance | 17.5 | Cum | 140.76 | ₹2,463.3 |
| 9 | Plastering with cement mortar (16), 12 mm thick on brickwork in substructure as per technical specification as per SN. DSR 13.4.2 | 299.83 | sqm | 237.71 | ₹71,272.59 |
| 10 | 15mm thick cement plaster in 1.6 on rough side of singal or half brick wall ic all DSR 13.5.2 | 149.92 | sqm | 273.48 | ₹40,998.75 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
Tendernotice_2.pdf
PDF • 1.41 MB
BOQ_2153978.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .