| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹25.0 LAccepted-AOC | ₹25.0 L | 1 | Accepted-AOC Awarded |
| 2 | 2₹25.0 LRejected-AOC | ₹25.0 L | 2 | Rejected-AOC Not Awarded |
| 3 | 3₹25.4 LRejected-AOC | ₹25.4 L | 3 | Rejected-AOC Not Awarded |
| 4 | 4₹25.3 LRejected-AOC | ₹25.3 L | 4 | Rejected-AOC Not Awarded |
Tender Value
₹25.1 L
EMD Value
₹26,000
Closing Date
25 Jan 2020, 5:00 pmClosed
S.E., E.T.C., Bareilly
Superintending Engineer Hydel Campus, Near L.I.C. Office Rampur Garden, Bareilly
Operation, Preventive, Routine and General/Normal Breakdown , General Cleaning, Maintenance of Lawns and Cutting of Grass at 132KV S.A.S. S/S Bilsi, Budaun under ETD, Budaun during the Period of 1 Year w.e.f. 01.02.2020 to 28.02.2021
2020_UPTCL_420982_1
E-Tender No. 72 / W / ETC(B) / 2019 - 20
Open Tender
Electrical Works
365 days
Budaun
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
A/c No 10897666087 IFSC SBIN0000615 S.B.I. Bly
₹26,000
16 Sept 2020
7 Jan 2020
27 Jan 2020
7 Jan 2020
25 Jan 2020
7 Jan 2020
7 Jan 2020 - 25 Jan 2020
Amount
Operation; Preventive, Routine & General / Normal Breakdown Maintenance; General Cleaning; Regular Maintenance of Lawns and 4 Times Cutting of Grass & Jungle Clearance including 4 Times Up-Rooting of small Wild Trees / Plants alongwith other associated Works at 132/33KV S.A.S. Sub Station Bilsi, Budaun, during the Period of 1 Year w.e.f. 01.02.2020 to 31.01.2021, as per Details below : (1) Operation of 132/33KV S.A.S. Sub Station Bilsi, Round the Clock in 3 Shift of 8 Hours each Per Day by Deploying a Team Consisting of the Technical Personnel (1 No. TG - II / S.S.O. with I.T.I. in Electrical Trade and having Knowledge of Computer Application and 1 No. Skilled Helper to Assist the T.G. - II on Duty in Shift) in each Shift (Total 4 No. Shifts; 1 No. Shift being on Rest per Day) by due Operation of the Sub Station Equipments, Transformers including DG Set etc. as per Standard Practices of UPPTCL and Instructions of S.D.O. / J.E. & CLDS / ALDS alongwith Recording of Operational Activites, System Information / Data, Messages etc., as per Details in Annexure - A, during the Period of 1 Year w.e.f. 01.02.2020 to 31.01.2021, with all Cost of Men Required for the Job. (1 Job for each Month)
(2) Preventive, Routine and General / Normal Breakdown Maintenance of the Transformers, Outdoor / Indoor Equipments, Control & Relay Panels, RTCC Panels, ACDBs, Battery Chargers, DCDBs, Battery Sets etc., D.G. Set, Split / Window ACs, Indoor & Outdoor Lighting Arrangement etc. at 132/33KV S.A.S. Sub Station Bilsi, as per Details in Annexure - B, Round the Clock and / or as and when Required by a Team Consisting of the Following Technical Personnel as per Standard Practices of UPPTCL and Instructions of S.D.O. / J.E., during the Period of 1 Year w.e.f. 01.02.2020 to 31.01.2021, with all Cost of Men, Misc. Consumables etc. Required for the Job except the Spares / Items / Materials / Equipments, that shall be Provided by the Department. (1 Job for each Month) : (a) T.G. - II (Experienced I.T.I. in Electrical Trade) : 1 No. (b) Line Man / Fitter / Technician (Experienced) : 1 No. (c) Skilled Helper (Experienced) : 2 No.
(3) Daily General Cleaning and Maintenance / Upkeep of Control Room, associated Offices, Carrier Room, Battery Room, Control Room Building, etc. by Brooming & Mopping alongwith Cleaning of associated Toilets including Brooming of C.C. Roads / Floors, Trench Covers & Scraping of Unwanted Growths in between Joints of C.C. Roads at 132/33KV S.A.S. Sub Station Bilsi and associated Colony Premises, as per Details in Annexure - C by Deploying Required Man Power & 1 No. Sweeper, during the Period of 1 Year w.e.f. 01.02.2020 to 31.01.2021, with all Cost of Men, Toiletries, Misc. Consumables, T&Ps etc. Required for the Job. (1 Job for each Month)
(4) Regular Maintenance of Lawns / Garden, Flower Bed, Hedges, Flower Vases etc. including Proper Cutting / Trimming of Grass, Hedges, Ornamental Plants / Trees, Seasonal Flowers etc. including Watering, Making Loose Soil around the Plants / Trees, Flower Beds etc. at 132/33KV S.A.S. Sub Station Bilsi, as per Details in Annexure - D by Deploying 1 No. Experienced Gardener to Keep them Healthy & Green including Replacement of Aired Plants, Grass, Seasonal Flowers etc. with Fresh Plants, Grass, Seasonal Flowers etc. of same variety and Providing of well Decomposed Organic Manure, during the Period of 1 Year w.e.f. 01.02.2020 to 31.01.2021, with all Cost of Men, Materials, Misc. Consumables, T&Ps etc. Required for the Job. (1 Job for each Month)
(5) Clearance of Dense Jungle and Cutting of Grass, Kusha & Kansa including Uprooting of the Rank Vegetation, Grass, Bushes, Shrubs etc. by Scrapping of Grass, Bush, Bush Wood, Shrubs & Plants etc. above 2" over the Ground Level; Weeding out the wild Growth Roots, Seeds etc. and Collection of the Foreign Materials like Kankar, Ballast, Pebbles, Waste Papers etc. in Switchyard Area between Pale Fencing & Chain Link Fencing / Security Fencing / Wall, Area around Control Room / Committee Room, Area around Store Shed, Open Store Yard, Colony Area etc. at the Sub Station and Finaly, Disposal of all the Removed Vegetation, Rubbish & Garbage etc. by Throwing it Outside the Periphery of the Sub Station Premises during the Period of 1 Year w.e.f. 01.02.2020 to 31.01.2021, with all Cost of Men, Misc. Consumables, T&Ps etc. Required for Satisfactory Completion of the Work, as per Details below : (a) 1st Cutting between 1st February 2020 to 29th February 2020
(b) 2nd Cutting between 1st May 2020 to 31st May 2020
(c) 3rd Cutting between 1st August 2020 to 31st August 2020
(d) 4th Cutting between 1st November 2020 to 30th November 2020
(6) Up-Rooting of small Trees in Switchyard Area, Area Pale Fencing & Chain Link Fencing / Security Fencing / Wall, Area around Control Room / Committee Room, Area around Store Shed, Open Store Yard, Colony Area etc. at the Sub Station by Digging and Taking out the complete Root, then Leveling the Ground, so Excavated and Finally, Disposal of all the Removed Vegetation, Rubbish & Garbage etc. by Throwing it outside the Periphery of the Sub Station Premises during the Period of 1 Year w.e.f. 01.02.2020 to 31.01.2021, with all Cost of Men, Misc. Consumables, T&Ps etc. Required for Satisfactory Completion of the Work, as per Details below : (a) 1st Up-Rooting between 1st February 2020 to 29th February 2020
(b) 2nd Up-Rooting between 1st May 2020 to 31st May 2020
(c) 3rd Up-Rooting between 1st August 2020 to 31st August 2020
(d) 4th Up-Rooting between 1st November 2020 to 30th November 2020
M/s S.S. Refregeration
Reliance Enterprises
M/S SATKAR TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf