| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹33.2 L+₹6.4 L (23.8%)Admitted-Fee/PreQual/Technical/Finance SONU TALAB WARD NO 4 RAMPUR GHAT ROAD MORADABAD UTTAR PRADESH | MORADABAD | UTTAR PRADESH | 244001 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹33.3 L+₹6.5 L (24.4%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹33.3 L
EMD Value
₹66,700
Closing Date
24 Sept 2026, 5:00 pmClosed
E.E.NREP, LATEHAR
E.E.NREP OFFICE LATEHAR
Construction of PCC Road Up to Upgraded Primary School Chainpur in Village Chainpur GP Chainpur Block Mahuadanr, District- Latehar
2026_LNREP_118460_1
NREP/LATEHAR/54/2026-27
Open Tender
Civil Works - Roads
Percentage
135 days
CHAINPUR MAHUADANR
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹66,700
26 Sept 2026
9 Sept 2026
26 Sept 2026
9 Sept 2026
24 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 30 meters outside the periohery of the area as per Technical Specification clause 201 . | 0.02 | Hac | 19,760.3 | ₹395.21 |
| 2 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m | 87.75 | M3 | 62.4 | ₹5,475.6 |
| 3 | Compacting Original ground Supporting Subgrade
(Loosening of the ground a level of 500 mm below the sub-grade level , watered, graded and compacted in layers to meet requirement of Table 300-2 for subgrade construction) | 87.75 | M3 | 52.6 | ₹4,615.65 |
| 4 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. | 47.25 | M3 | 131.3 | ₹6,203.93 |
| 5 | Construction of Granular Sub- base ( for grading -I Material) by providing close graded material, spreading in uniform layers with motor graded on prepared surface , mixing in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density . complete as per Technical Specicification . | 87.75 | M3 | 1,437.6 | ₹1,26,149.4 |
| 6 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing . | 108 | M3 | 5,360.4 | ₹5,78,923.2 |
| 7 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 281.75 | M3 | 316.2 | ₹89,089.35 |
| 8 | Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3 | 8.3 | M3 | 1,544.4 | ₹12,818.52 |
| 9 | Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15) | 41.02 | M3 | 3,754.4 | ₹1,54,005.49 |
| 10 | Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203
Square Rubble Coursed Rubble Masonry (1st sort) in C.M. (1:3) | 179.26 | M3 | 3,458.6 | ₹6,19,988.64 |
stage.html
html • 0.02 MB
finance_160164.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Group_54.pdf
Tender Documents • 0.95 MB
BOQ_160164.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .