Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹60.3 L+₹1.3 L (2.27%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹75.8 L+₹16.8 L (28.5%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | BABLU PARAMANIK L2 | METHU BHUSAN KOLEY L3 | TAPAS PARAMANIK L1 |
|---|---|---|---|---|---|---|
| 1.00Single slope strong bamboo (3" to 4") frame work shed with Tarpaulin cover height 8'-6" to 9'-0" at the end and the post of strong bamboo (4"dia) @ 6'-0" C/C and embedded sufficiently in the ground supplied fited fixed with coir rope eith refits runners, ties, stiffeners and crossing etc, of full bamboos runner to be fixed with pillar or posts at protection of work Nylon/Coir rope and half split or full bamboo to be fixed on the roof of the shed to above the wind blow. The covering must sun/rain water tight, leakage of rain water will not be allowed in any circumstances. The ground to be labeled and dressed before starting the work, to be completed as per directions of the authority. | ||||||
| 1.01 | i) Without side covering for 3(Three) days. | 360 | Sq.m | 351 ₹1,26,360 | 570 ₹2,05,200 | 321 ₹1,15,560 Lowest |
| 1.02 | ii) One side covering for 3(Three) days. | 360 | Sq.m | 351 ₹1,26,360 | 360 ₹1,29,600 | 321 ₹1,15,560 Lowest |
| 1.03 | iv) Three sive covering for 3(Three) days. | 1,480 | Sq.m | 461 ₹6,82,280 | 689 ₹10,19,720 | 421 ₹6,23,080 Lowest |
| 2.00Double slope bamboo frame work shed including alternative UC bullah post ( 6")with Tarpaulin cover & other fittings same as item no. 1 above | ||||||
| 2.01 | i) Without side covering for 3(Three) days. | 1,500 | Sq.m | 341 ₹5,11,500 | 572 ₹8,58,000 | 331 ₹4,96,500 Lowest |
| 3.00Flat roof shed covered with Hessian as will be required as per direction of the authority, fitting same as item no. 1. | ||||||
| 3.01 | i) Hessian Covering-3(Three) days. | 760 | Sq.m | 321 ₹2,43,960 Lowest | 443 ₹3,36,680 | 321 ₹2,43,960 Lowest |
| 4.00Tarpaulin/Hessian Sheet/Cloth partition strongly fixed on the bamboo frame (high 8'-0" to 9'-0") completed as per direction of the authority. | ||||||
| 4.01 | i) Tarpaulin Covering-3(Three) days. | 725 | Sq.m | 311 ₹2,25,475 | 432 ₹3,13,200 | 301 ₹2,18,225 Lowest |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
4 Apr 2026, 12:00 pmClosed
BDO Onda
Onda Development Block
Infrastructure of DC/RC venue in hire basis and Temporary Electrification works at Onda High School and Onda Stadium i.c.w. WBLA-2026 Election . (Details in Schedule)
2026_ZPHD_1023337_1
NIeT No 01/ WBLA 2026/BDO / 2025-26
Open Tender
CIVIL WORKS
Item Wise
15 days
ONDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹60,000
30 Sept 2026
21 Mar 2026
6 Apr 2026
21 Mar 2026
4 Apr 2026
21 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Single slope strong bamboo (3" to 4") frame work shed with Tarpaulin cover height 8'-6" to 9'-0" at the end and the post of strong bamboo (4"dia) @ 6'-0" C/C and embedded sufficiently in the ground supplied fited fixed with coir rope eith refits runners, ties, stiffeners and crossing etc, of full bamboos runner to be fixed with pillar or posts at protection of work Nylon/Coir rope and half split or full bamboo to be fixed on the roof of the shed to above the wind blow. The covering must sun/rain water tight, leakage of rain water will not be allowed in any circumstances. The ground to be labeled and dressed before starting the work, to be completed as per directions of the authority. | |||||
| 1.01 | i) Without side covering for 3(Three) days. | - | Sq.m | - | - |
| 1.02 | ii) One side covering for 3(Three) days. | - | Sq.m | - | - |
| 1.03 | iv) Three sive covering for 3(Three) days. | - | Sq.m | - | - |
| 2Double slope bamboo frame work shed including alternative UC bullah post ( 6")with Tarpaulin cover & other fittings same as item no. 1 above | |||||
| 2.01 | i) Without side covering for 3(Three) days. | - | Sq.m | - | - |
| 3Flat roof shed covered with Hessian as will be required as per direction of the authority, fitting same as item no. 1. | |||||
| 3.01 | i) Hessian Covering-3(Three) days. | - | Sq.m | - | - |
| 4Tarpaulin/Hessian Sheet/Cloth partition strongly fixed on the bamboo frame (high 8'-0" to 9'-0") completed as per direction of the authority. | |||||
| 4.01 | i) Tarpaulin Covering-3(Three) days. | - | Sq.m | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
niet01.pdf
Tender Documents • 0.26 MB
OID.pdf
Tender Documents • 0.24 MB
tobereceived.pdf
Additional Documents • 0.01 MB
BOQ_2515198.xls
BOQ • 0.49 MB
Forms.pdf
Additional Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .