| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.3 LAccepted-AOC C O C CLASS CONTRACTOR GORUMAHISANI | EAST SINGHBUM | JHARKHAND | 831001 | ₹20.3 L | L1 | Accepted-AOC Lottery Winner L1 |
| 2 | L1₹20.3 LRejected-AOC AT MUNDATHAKURA P O DAMUDIGODA DIST MAYURBHANJ | MUNDATHAKURA | MAYURBHANJ | ODISHA | ₹20.3 L | L1 | Rejected-AOC L1 |
| 3 | L1₹20.3 LRejected-AOC | ₹20.3 L | L1 | Rejected-AOC L1 |
| 4 | L1₹20.3 LRejected-AOC | ₹20.3 L | L1 | Rejected-AOC L1 |
| 5 | L1₹20.3 LRejected-AOC RURAL WORKS DIVISION RAIRANGPUR | KORAPUT | ODISHA | 763001 | ₹20.3 L | L1 | Rejected-AOC L1 |
Tender Value
₹23.9 L
EMD Value
₹23,875
Closing Date
26 Nov 2025, 5:30 pmClosed
PA, ITDA, Rairangpur
At-Ward No-03, Mandir Sahi, PO/PS-Rairangpur, Dist-Mayurbhanj
Construction of Additional Class Room at Manbir Ashram School under Jamda Block.
2025_STSCD_121112_29
TCN032025-26
Open Tender
Civil Works - Buildings
Percentage
120 days
Manbir Ashram School
As per tender documents.
2 documents required · 2 mandatory
₹6,000
₹23,875
Yes
20 Jan 2026
12 Nov 2025
27 Nov 2025
12 Nov 2025
26 Nov 2025
12 Nov 2025
Earth work in Excavation of Foundation in all kind of Soil in Foundation with 50 Mtr. Initially lead and 1.5 Mtr. Initially lift including rough dressing…… cte completed.
Providing and laying Sand in Foundation and Plinth filling with 9'' thick layers of approved quality free from dust, dirt and other materials to proper line and grade, watering and ramming….etc completed.
C.C. (1:4:8) in foundation and floor using 40 mm size Hard black crusher broken granite metal of approved quality from approved quarry including hosting lowering and laying in layers not exceeding 150 mm thick to required level, ramming watering and curing....etc completed.
R.C.C. work of M-20 grade with 20 mm and down grade black hard granite stone chips including watering and curing ….etc completed. Ground Floor (A) Col. Footing
R.C.C. work of M-20 grade with 20 mm and down grade black hard granite stone chips including watering and curing ….etc completed. Ground Floor (B) Columns
R.C.C. work of M-20 grade with 20 mm and down grade black hard granite stone chips including watering and curing ….etc completed. Ground Floor (C) Plinth
R.C.C. work of M-20 grade with 20 mm and down grade black hard granite stone chips including watering and curing ….etc completed. Ground Floor (D) Lintel
R.C.C. work of M-20 grade with 20 mm and down grade black hard granite stone chips including watering and curing ….etc completed. Ground Floor (E) Chajja
R.C.C. work of M-20 grade with 20 mm and down grade black hard granite stone chips including watering and curing ….etc completed. Ground Floor (F) Stair Case
R.C.C. work of M-20 grade with 20 mm and down grade black hard granite stone chips including watering and curing ….etc completed. Ground Floor (G) Beams
R.C.C. work of M-20 grade with 20 mm and down grade black hard granite stone chips including watering and curing ….etc completed. Ground Floor (H) Slab
First Floor (A) Columns
First Floor (B) Lintel
First Floor (C) Chajja
First Floor (D) Beams
First Floor (E) Slab
Supplying, fitting & placing uncoated TMT bar rainforcement complete as per Drowing and Technical specification…etc completed. Ground Floor
Supplying, fitting & placing uncoated TMT bar rainforcement complete as per Drowing and Technical specification…etc completed. First Floor
Brick masonry in C.M. (1:6) using Brick of approved quality including cost of conveyance, royalty curing of all materials and labours ….etc completed. Below Plinth
Brick masonry in C.M. (1:6) using Brick of approved quality including cost of conveyance, royalty curing of all materials and labours ….etc completed. Ground Floor
Brick masonry in C.M. (1:6) using Brick of approved quality including cost of conveyance, royalty curing of all materials and labours ….etc completed. First Floor
Fixing Ceramic Tils in floor, Trads or Steps and landing on 25 mm thick bed of cement mortar (1:1) joint with neatcement slurry mixed with pigment of match the shades of Tiles including rubbing and polishing…..etc completed. Ground Floor
12mm thick cement plaster in (1:6) for Brick work including cost of conveyance, royalty ,curing and all cost of materials and labours….etc completed. Ground Floor
12mm thick cement plaster in (1:6) for Brick work including cost of conveyance, royalty ,curing and all cost of materials and labours….etc completed. First Floor
16 mm thick cement plaster in (1:6) for Brick work including cost of conveyance, royalty ,curing and all cost of materials and labours….etc completed. Ground Floor
16 mm thick cement plaster in (1:6) for Brick work including cost of conveyance, royalty ,curing and all cost of materials and labours….etc completed. First Floor
Finishing wall surface of wall with Acrylic wall putty of approved make and finishing amooth and even surface to painting including all cost. Ground Floor
Finishing wall surface of wall with Acrylic wall putty of approved make and finishing amooth and even surface to painting including all cost. First Floor
Wall painting 2 coat with weather coat Paint of approved shade on new work to given including cost of paint….etc completed. Ground Floor
Wall painting 2 coat with weather coat Paint of approved shade on new work to given including cost of paint….etc completed. First Floor
Distempering Two coat to wall with distemper of approved shed on new work to given on shed. Ground Floor
Distempering Two coat to wall with distemper of approved shed on new work to given on shed. First Floor
Supply,fitting & fixing of MS Grill Gate, Doors, Windowsout of STEEL flat confirming to IS-1977/1996 asper the design approved .
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_563633.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
DTCN.pdf
Tender Documents • 3.60 MB
BOQ_563633.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .