| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC SHOP NO 5 WARD NO 12 132041 | KARNAL | KARNAL | HARYANA | 132041 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹10.2 L+₹1.7 L (20.4%)Rejected-Finance 29 RAILWAY ROAD WARD NO 9 TARAORI 132116 | TARAORI | KARNAL | HARYANA | 132116 | L2 | Rejected-Finance Reject |
Tender Value
₹9.5 L
EMD Value
₹18,000
Closing Date
14 May 2026, 5:00 pmClosed
BHANWAR SINGH
Municipal Committee Taraori
Cleaning of various nala in MC Taraori
2026_HRY_520676_1
2026E0E32D63 AE16 442B AA9E 9EF868567DE1310ULB
Open Tender
Civil Works
Works
140 days
Taraori
Cleaning of various nala in MC Taraori
2 documents required · 2 mandatory
₹1,000
₹18,000
Yes
21 May 2026
9 May 2026
15 May 2026
9 May 2026
14 May 2026
9 May 2026
9 May 2026 - 11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 1,665 | Kg. | 83 | ₹1,38,195 |
| 2 | [14.51.3]Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 3. Hire Charges for excavator with over 0.75 cum bucket capacity [Through rate] | 5 | Per day | 9,276 | ₹46,380 |
| 3 | [3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [2km] | 36.02 | cum | 48 | ₹1,728.96 |
| 4 | [3.1.3]By Mechanical Transport including loading, unloading and stacking 3. Manure or sludge [3km] | 1,796.34 | cum | 88 | ₹1,58,077.92 |
| 5 | [4.41]Earth work of silt-clearance of channels and drains. Kassi work undressed involving an average horizontal through upto 2 metres and average vertical lift upto 0.5 metre. [Through Rate] | 4,167.94 | cum | 70 | ₹2,91,755.8 |
| 6 | [5.25]Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. [Through Rate] | 22.36 | cum | 1,562 | ₹34,926.32 |
| 7 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 22.36 | cum | 4,374 | ₹97,802.64 |
| 8 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate] | 149.06 | Sqm | 208 | ₹31,004.48 |
| 9 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate] | 2,240 | Kg. | 66 | ₹1,47,840 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_599572.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .