Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 CrAccepted-AOC 1897 TS NO 6 5 VELLIANGKATTU RAMASAMY GOWNDER LAY OUT 60 FEET ROAD TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | ₹7.6 Cr | L1 | Accepted-AOC LOA Approved |
| 2 | L2₹7.9 Cr+₹34.0 L (4.49%)Rejected-Finance 1 367 SIVAN KOVIL STREET THONDAMATHURAI POST VEPPANTHATTAI TALUK PERAMBALUR DISTRICT | PERAMBALUR | TAMIL NADU | 621101 | ₹7.9 Cr+₹34.0 L (4.49%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Senthilkumar L1 | V.JANARTHANAN L2 |
|---|---|---|---|---|---|
| 1.00Construction High Level Bridge at Navalur to Sathanatham Road acroass Wellington river at Manglore Block | |||||
| 2.00 | Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL. | 364.96 | Cu.m | 140 ₹51,094.4 Lowest | 150 ₹54,744 |
| 3.00 | Earthwork excavation in soft disintegrated rock not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for (OPEN FOUNDATION, CUT OFF WALL)UNDER ABUTMENTS & PIERS BELOW SILL LEVEL. | 425.34 | Cu.m | 490 ₹2,08,416.6 Lowest | 500 ₹2,12,670 |
| 4.00 | Earthwork excavation in soft disintegrated rock not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for (OPEN FOUNDATION, CUT OFF WALL)UNDER ABUTMENTS & PIERS BELOW SILL LEVEL. | 453.7 | Cu.m | 630 ₹2,85,831 Lowest | 650 ₹2,94,905 |
| 5.00 | Vibrated Cement Concrete of grade M 15 Nominal mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for below ABUTMENT, WNGS and PIERS. | 28.36 | Cu.m | 5,400 ₹1,53,144 Lowest | 5,500 ₹1,55,980 |
| 6.00 | Vibrated reinforced Cement Concrete of grade M 30 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for footing under ABUTMENT, WNGS and PIERS | 361.78 | Cu.m | 10,400 ₹37,62,512 Lowest | 10,500 ₹37,98,690 |
| 7.00 | Vibrated reinforced cement concrete M 30 grade using 20 & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications , for SUBSTRUCTURE OF ABUTMENTS and WINGS BELOW SILL LEVEL | 58.15 | Cu.m | 10,800 ₹6,28,020 Lowest | 11,000 ₹6,39,650 |
| 8.00 | Vibrated reinforced cement concrete M 30 grade using 20 & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications , for SUBSTRUCTURE OF ABUTMENTS and WINGS ABOVE SILL LEVEL | 132.86 | Cu.m | 11,400 ₹15,14,604 Lowest | 12,000 ₹15,94,320 |
| 9.00 | Vibrated reinforced Cement Concrete of grade M 30 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Circular Column Pier Below SILL LEVEL | 8.48 | Cu.m | 10,900 ₹92,432 Lowest | 11,000 ₹93,280 |
| 10.00 | Vibrated reinforced Cement Concrete of grade M 30 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Circular Column Pier Above SILL LEVEL | 13.25 | Cu.m | 12,800 ₹1,69,600 Lowest | 13,000 ₹1,72,250 |
Tender Value
₹7.5 Cr
EMD Value
₹7.5 L
Closing Date
19 Aug 2025, 3:00 pmClosed
Additional Collector(D)
DRDA, Cuddalor
Construction of high level bridge at Navalur to Sathanatham road across Wellington river in Mangalore Block under State Special Assistance (SSA) Phase-I 2025-26
2025_RDTN_587290_2
A10/3061/2025 State Special Assistance (Bridge work)
Open Tender
Civil Works - Bridges
Item Wise
365 days
DRDA
As per tender document
2 documents required · 2 mandatory
₹0
₹7.5 L
DRDA, Cuddalor
24 Oct 2025
30 Jul 2025
19 Aug 2025
30 Jul 2025
19 Aug 2025
1 Aug 2025
5 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 0.69 MB
BOQ.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .