Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAdmitted-Finance | ₹13.8 L | L1 | Admitted-Finance |
| 2 | L2₹16.2 LAdmitted-Finance JHARIA BENIGANJ HARDOI | BENIGANJ | HARDOI | UTTAR PRADESH | ₹16.2 L | L2 | Admitted-Finance |
| 3 | L3₹17.3 LAdmitted-Finance | ₹17.3 L | L3 | Admitted-Finance |
Updated dates
Tender Value
Refer Docs
EMD Value
₹7,000
Closing Date
16 Feb 2026, 4:00 pmClosed
SUPERINTENDING ENGINEER
SE EDC II GORAKHPUR
For the work of Line Shifting of Schools to be carried out under the deposit scheme in the financial year 2025-26 under Electricity Distribution Division, Sahjanwa, Gorakhpur
2026_PVVNV_1107139_1
36/EDC-II(G)/2025-26
Open Tender
Electrical Works
30 days
GORAKHPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC II GORAKHPUR
₹7,000
26 Feb 2026
17 Jan 2026
17 Feb 2026
17 Jan 2026
16 Feb 2026
17 Jan 2026
The proposed Line relocation at Parisadiya Schools involves the safe transportation, loading, and unloading of related equipment from the electrical store center to the work site.
PCC POLE 8.5 MTR
PCC POLE 9 MTR
LT ABC CABLE(3*50+1*16)
3*120 MM2 XLPE CABLE
3*120 MM2 XLPE CABLE JOINTING KIT
GI PIPE 6 DIA
ARIAL BUNCH CABLE (XLPE 3*95+1*70+1*16) SQMM
ACSR DOG CONDUCTOR
ACSR WEASEL CONDUCTOR
DIFFERENT SIZE OF GI WIRE
STAY WIRE
OTHER LINE MATERIAL (0-80 Kms.)
SUPPLY OF FOLLOWING MATERIALS
STAY CLAMP
NUT & BOLT
PG CLAMP
6" DIA GI PIPE
E- BRACKET
F- BRACKET WITH NUT BOLTS
GAURDING CLAMP Decentrailsed
GAURDING ANGLE Decentrilised
CLAMP FOR T-OFF CHANNEL
LT SHACKLE INSULATOR Decentrilised
STAY INSULATOR
DISTRIBUTION BOX HOLDING CLAMP
SUSPENSION CLAMP WITH EYE HOOK
HOLDING CLAMP FOR CROSS ARM
DEAD END CLAMP WITH I Hook
STONE PAD
TF HOLDING CLAMP
GUARDING ANGLE WITH CLAMP
EARTHING CLAMP
LT CLAMP
GAURDING OF CROSS ARM
CLAMP FOR T/F(75*8MM)
GUARDING OF POLE
F- BRACKET
DEAD END CLAMP
I HOOK
J HOOK
EYE HOOK CLAMP FOR PCC POLE WITH NUT AND BOLTS
LT SHACKLE INSULATOR
ERECTION WORK OF SINGLE 8.5 MTR PCC POLE WITH ALL FITTING AS PER ESTIMATE
ERECTION WORK OF DOUBLE POLE STRUCTURE (8.5 MTR PCC POLE) WITH ALL FITTING AS PER ESTIMATE.
GROUTING OF POLE
CONCRETING OF STAY
EARTHING OF POLE
Erection of HT line 3-phase 3-wire conductors, mounting on insulators, sagging and tightening, and binding at each pole.
Spreading the aerial bundled conductor, mounting it on insulators, sagging and tightening it, and binding it at each pole.
Mounting of Distribution Box
Refitting of Crass Arm
Digging & laying of 11 KV Cable in trench with sand & brick and back filling mtr
Installation of Jointing kit
GST extra on above rate
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
TenderForm.rar
Tender Documents • 0.12 MB
BOQ_2042967.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid