| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 CrAccepted-AOC | ₹6.6 Cr Quoted ₹5.8 Cr | L1 | Accepted-AOC Lowest Rate Quoted by L1 than L2 |
| 2 | L2₹6.1 Cr+₹22.4 L (3.84%)Rejected-AOC | ₹6.1 Cr+₹22.4 L (3.84%) | L2 | Rejected-AOC Highest Rate Quoted by L2 than L1 |
| Sl No | Description | Qty | Unit | Sri Siva Sakthi Associates L2 | JP CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing Lime Concrete and clearing away from the site etc., complete as directed by the Officer in charge | 21 | Cum | 386 ₹8,106 | 372 ₹7,812 Lowest |
| 2.00 | Dismantling brick/stone masondry work in lime mortar including all labour charges requirred and all tools and plants requirred etc.,complete | 462 | Cum | 309 ₹1,42,758 | 298 ₹1,37,676 Lowest |
| 3.00 | Providing strutting arrangements to pavukkal for dismantling weathering coarse and pavukkal using casiourina posts and runners etc., including cost of all materials and all labour charges and materials requirred etc.,complete (Rate for without strutting) | 67 | Sqm | 1,079 ₹72,293 | 1,039 ₹69,613 Lowest |
| 4.00Dismantling and removing the existing cutstone masonry wall including numbering the cut stone members such as Pavukal, Uthiram, Pillar, Pothiyal etc.,and stacking the same at the place as directed by the officers in charge within the temple campus without hinderence for execution of work including all labour charges and hire charges for tools and plants involved to do the work etc complete, as per department instructions. For Outer Vari | |||||
| 4.01 | Uba peedam,Adhistanam | 4,578.24 | Sqm | 1,888 ₹86,43,717.12 | 1,819 ₹83,27,818.56 Lowest |
| 4.02 | Prastharam ( Uthiram, Kabothagam & Vyalam ) | 33 | Sqm | 1,888 ₹62,304 | 1,819 ₹60,027 Lowest |
| 4.03 | Pillar,Bothial,Uthiram | 17 | Sqm | 6,197 ₹1,05,349 | 5,970 ₹1,01,490 Lowest |
| 4.04 | Pavukal | 56 | Sqm | 1,888 ₹1,05,728 | 1,819 ₹1,01,864 Lowest |
| 4.05 | cut stone flooring unsized | 44 | Sqm | 560 ₹24,640 | 539 ₹23,716 Lowest |
| 5.00 | Earth work open excavation for foundation in all classes of soils and sub soils and todepth as may be directed except in hard rock, requiring blasting, including infinal leads and lifts and re-filling the sides of foundation, with excavated earth in 150mm layers well watered rammed and consolidated, including depositing surplus earth clearing and levelling the site, shoring shuttering baling out water wherever necessary etc., complete complying with standard specification. | 20 | Cum | 113 ₹2,260 | 109 ₹2,180 Lowest |
Tender Value
Refer Docs
EMD Value
₹3.4 L
Closing Date
31 Jan 2025, 4:00 pmClosed
Deputy Commissioner/Executive officer
Deputy Commissioner / Executive Officer Arulmigu kallalagar Thirukovil Alagarkovil
Dismantling and Reconstruction of Poigaikaraippati Theepam with Maiya mandapam and North side of pavithra Pushkarani theppam belongs to Arulmigu Kallalagar Thirukovil, Alagarkovil, Madurai
2025_HRCE_518805_1
2200/2022/B2
Open Tender
Civil Works
Item Rate
90 days
Arulmigu Kallalagar Temple, Alagarkoil, Melur Talu
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹3.4 L
4 Sept 2025
14 Jan 2025
31 Jan 2025
14 Jan 2025
31 Jan 2025
14 Jan 2025
Amount
Dismantling the existing Lime Concrete and clearing away from the site etc., complete as directed by the Officer in charge
Dismantling brick/stone masondry work in lime mortar including all labour charges requirred and all tools and plants requirred etc.,complete
Providing strutting arrangements to pavukkal for dismantling weathering coarse and pavukkal using casiourina posts and runners etc., including cost of all materials and all labour charges and materials requirred etc.,complete (Rate for without strutting)
Dismantling and removing the existing cutstone masonry wall including numbering the cut stone members such as Pavukal, Uthiram, Pillar, Pothiyal etc.,and stacking the same at the place as directed by the officers in charge within the temple campus without hinderence for execution of work including all labour charges and hire charges for tools and plants involved to do the work etc complete, as per department instructions. For Outer Vari
Uba peedam,Adhistanam
Prastharam ( Uthiram, Kabothagam & Vyalam )
Pillar,Bothial,Uthiram
Pavukal
cut stone flooring unsized
Earth work open excavation for foundation in all classes of soils and sub soils and todepth as may be directed except in hard rock, requiring blasting, including infinal leads and lifts and re-filling the sides of foundation, with excavated earth in 150mm layers well watered rammed and consolidated, including depositing surplus earth clearing and levelling the site, shoring shuttering baling out water wherever necessary etc., complete complying with standard specification.
Earth work excavation for foundation in all classes of soils and sub soils and todepth as may be directed except in hard rock, requiring blasting, including infinal leads and lifts and re-filling the sides of foundation, with excavated earth in 150mm layers well watered rammed and consolidated, including depositing surplus earth clearing and levelling the site, shoring shuttering baling out water wherever necessary etc., complete complying with standard specification.
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting
Cement Concrete 1:5:10 (one cement five sand ten aggregate) using 40mm gauge hard granite broken stone jelly for foundation including cost and conveyance of all materials labour for mixing,l aying, compacting, curing, dewatering, side shuttering, wherever necessary including curing etc.,complete complying with standard specification and as directed.
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and filling in foundation, basement, etc with convayed earth in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Random Rubble Masonry in Lime mortar 1:5 ( one of slaked lime and five of sand) using new rough stone and bond stone for foundation and basement including simultaneous flush pointing, curing etc complete complying with standard specifications.The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.
Foundation & Basement
G.F Super Structure
Brick work in Cement mortar 1:5 (One cement and Five sand)using best quality Country bricksof size 8"3/4 x 41/4" x 23/4" for walls incluing cost and convetance of all labour andmaterials including scaffolding curing finishingetc., complete complying with standard specification and as directed.etc., complete
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supply of New Cut stone for Pavukal, Uthiram, etc including cost and conveyance of Cut stone, labour charges for loading , unloading and all other incidental charges etc complete
Refixing the dismantled cutstone wall, Pavukal, Uthiram, Pillar and Pothiyal in correct position as directed and pointing with combination mortar including all labour charges and hire charges for tools and plants imvoived to do the work wct complete as per department instructions.For Outer Vari
Uba peedam,Adhistanam
Prastharam ( Uthiram, Kabothagam ,Vyalam & Kodungai )
Pillar,Bothial,Uthiram
Pavukkal
Dressing and fixing of new pavukal, Uthiram,Kodungai etc as directed and fixing the same in position with Lime mortar including all labour charges for dressing and fixing in posision as directed etc complete.
New stones for Kodungai
For Uthiram inner
New stones for pavukkal
Laying cutstone Flooring using cutstone slab of size 60x60x10cm 3 line dressed as directed and pointing with cement mortar including all labour charges and hire charges for tools and plants imvoived to do the work wct complete as per department instructions.
Inner (Three Line Dressing)
Outer (Single Line Dressing)
Weathering Course Concrete using best quality broken brick jelly of size 20mm uniform gauge in pure Slaked Lime, the proportion of brick jelly to lime being 32(Thirty Two Brick jelly) to 12.5( Tweleve Point Five lime) ( No sand is to be added ) by volume and laid over the R.C.C.roof slab in a single layer and consolidated to the finished thickness by beating the concrete with wooden beaters of approved pattern keeping the surface constantly wet by sprinkling lime jaggery water etc., complete. complying with standard specification.
Finishing the Top of Roof with One course of machine Pressed Tiles of size 230 x 230 x 20mm of approved quality laid in Lime mortar.1 : 3 - 12mm thick mixed with Water Proofing Compound, Red oxide and pointing with Lime mortar 1:3 ( One of Slaked Lime and Three of sand)same mortar mixed with water proof compound and red oxide etc.,etc.,complete as directed by the departmental officers complying with standard specification.
Brick masonary L.M1:2 (One Lime and Three sand)using Stock bricks including all varivargams, mould sthambams mokopathrams, koodu, Nasi and all ornamental brick work complete, all pancharams Agarais, Karanakoodu, etc., forming core walls of Rajagopuram / Vimanam complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for Kalkaram
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with L.M. 1:3 ( One Lime and Three plastering Sand) complete including shapping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embdding broken bricks of shaped/chiselled bricks, rough-plastering with C.M. 1:4 ( One Lime and Four plastering Sand) and finishing withfinal ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete inculding all axtra for folding and inculuding clearing from the vimanams/gopurams 100sft superficial area. for kalkaram
Painting with multicolour (Panchavarnam) good emuision paints complete for the Vinamans/Gopurams, inculding cost and conveyence of all materials, lobour charges inculdinf Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.
Providing new sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in CM 1:3 finishing the same with CM 1:3 (One cement and Five Plastering sand) bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder) Size -2'6" to 3'6"
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work 1 sq,ft. 15 feet height.
Sub total
Sri Siva Sakthi Associates (BID ID -1241808)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .