Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹14.5 L
EMD Value
₹29,080
Closing Date
3 Feb 2022, 6:00 pmClosed
Er. Surinder Kumar
Tawi Canal Const Division Jammu
Re-construction of canal section of D-10 of MTC from RD 1800-1950M, RD 2350-4000M raising/ parapet wall and pitching/ grouting from RD 6250-6550M at spots
2022_IFC_158174_6
e-NIT No 23 of 2021-22 dated 25.01.2022
Open Tender
Civil Works
Item Wise
45 days
Re-construction of canal section of D-10 of MTC fr
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer TCC Division Jammu
₹29,080
24 Feb 2022
25 Jan 2022
4 Feb 2022
26 Jan 2022
3 Feb 2022
26 Jan 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc ( not exceeding 1.5 in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, including dressing of sites and ramming of bottoms lift upto 1.5M, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge
P/L in position cement conc. of specified grade excluding the cost of centering and shuttering. All work upto plinth level.
1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size ) crushed 30% boulder
1:4: 8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40MM nominal size) crushed.
Dry stone ptitiching (any thickness) excluding cost of stone
On Slopes
On Horizontal
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 3.65 cum per 100 sq m on horizontal/side slopes; complete including curing.
Centering and shuttering including strutting propping etc and removal of form for :
Walls any thickness including attached pilasters buttrersses,plinth and string courses etc.
12mm cement plaster of mix 1:4 ( 1 cement : 4 coarse sand )
Filling available excavated earth ( excluding rock in trenches plinth sides of foundations etc layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 50 M and lift upto 1.5 m .
Supply of stones Supply of stone boulder (nallah) nominal size 225MM (stack measurement reduced by 15%)
Dumping stones excluding cost of stones on Horizontal.
Carriage of material by Mechanical transport from source to site of work including loading unloading and stacking
Sand average distance 10 Km
Soling stone average distance 15 Km
agg 20mm nominal sizeaverage distance 13 Km
SANDEEP KUMAR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .