Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 612 DIWAN ESTATE AMBEDKAR GALI HARSH VIHAR EAST DELHI DELHI 110093 | NORTH EAST DELHI | DELHI | 110093 | Admitted-Finance |
| 2 | Admitted-Finance PLOT NO DSS 170 HUDA SHOPPING COMPLEX SECTOR 31 FARIDABAD FARIDABAD HARYANA FARIDABAD HARYANA 121003 | FARIDABAD | HARYANA | 121003 | Admitted-Finance |
| 3 | Not Admitted-Fee | Not Admitted-Fee Fee not received |
| 4 | Not Admitted-Fee | Not Admitted-Fee Fee not received |
| 5 | Not Admitted-Fee B 71 ASHISH ROW HOUSE 395009 RANDER SURAT GUJARAT 395009 | SURAT | GUJARAT | 395009 | Not Admitted-Fee Fee not received |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
2 Nov 2022, 10:30 amClosed
RK KUMAWAT
TECHNICAL BUILDING NFL BATHINDA
Service and Maintenance of HVAC System, Central Air Conditioning system, Package units, Portable ACs, Water coolers, Refrigerators and Desert Coolers etc at NFL Bathinda
2022_NFL_127806_1
NFB/E-333/AC/2022-23
Open Tender
Electrical Works
Works
365 days
NFL BATHINDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹750
Yes
Payable To NFL
₹50,000
Yes
1 Dec 2022
3 Sept 2022
3 Nov 2022
3 Sept 2022
2 Nov 2022
3 Sept 2022
Amount
PART A - (CENTRAL AIR CONDITIONING PLANT): Service, running/ periodic maintenance of Central Air Conditioning Plants and Package Units etc. of Following capacities and specifications.
Central AC Plants for CPP C/R (One set consisting of 2x60 T & 1x30T capacity AC unit per month for 12 months). (The Operational Period of Months for this Item shall be measured on actual as and when required basis).
Package AC System for GTG Plant (One set consisting of 12x11 T & 2x3T capacity AC unit per month for 12 months)
Central HVAC Units in New Ammonia Plant (One set consisting of 129.5T X 3 capacity HVAC unit per month for 12 months)
Package Units for SG Plant C/R (One set consisting of 3 x 11 T capacity AC unit per month for 12 months)
.-do- for Urea Plant C/R (One set consisting of 2x11 T capacity AC unit per month for 12 months)
.-do- for ESP C/R in CPP (One set consisting of 2x11 T capacity AC unit per month for 12 months)
.-do- for VFD room in SGP (One set consisting of 3x11 T capacity AC unit per month for 12 months)
.-do- for VFD room in Ammonia (One set consisting of 2x11T capacity AC unit per month for 12 months)
.-do- for ESP C/R in SGP (One set consisting of 1x11T capacity AC unit per month for 12 months)
Water cooled Air Pressurization unit in CPP (One set consisting of 21000 CFM capacity Air Pressurization unit per month for 08 months)
.-do-, Capacity 35000 CFM
Flame Proof Package AC Units (One set consisting of 2x3T + 1x5T capacity Shelter AC unit per month for 12 months)
Part B-1: Running and periodic maintenance of Portable AC Units, Water Cooler, Desert Cooler etc. of following Capacities and specification. (The Quantities for Part-B shall be measured on actual basis).
Window type AC of capacity 0.75T (3 Numbers per month for 8 Months)
Window type AC of capacity 1.5T (157 Nos. X 8 Months)
Split AC of capacity 1.0 T/1.5 T /2.0 T (142 Numbers per month for 8 Months)
Split AC of capacity 3.0 T (6 Numbers per month for 8 Months)
Split AC of capacity 1.5T/2.0T (10 Numbers per month for 12 Months)
Water cooler of capacity 150 Ltr. (39 Numbers per month for 8 Months)
Water Cooler of capacity 380 Ltr (3 Numbers per month for 8 Months)
Desert cooler with one exhaust fan and one pump (262 Numbers per month for 8 Months)
Refrigerator of capacity 100/165 Ltr. (22 Numbers per month for 12 Months)
Refrigerator of capacity 240/265 Ltr. (3 Numbers per month for 12 Months)
Refrigerator of capacity 300/400 Ltr. (7 Numbers per month for 12 Months)
Biological Oxygen Demand Incubator (2 Numbers per month for 12 Months)
Bottle cooler/Deep Freezer of capacity 100/150 Ltr. (4 Numbers per month for 12 Months)
Part B-2: Shifting of Portable AC Units, Water Coolers/ Refrigerators/ Bottle coolers/ BOD incubators/ Desert Coolers etc. of following capacities and specification. (The Quantities for Part-B-2 shall be measured on actual basis).
Shifting for new installation of AC/ Water coolers/ Refrigerators/ BOD Incubators, Desert cooler with in Factory & Township:
a) Different size of Portable AC of capacity up to 2 T/ Water coolers/ Bottle coolers/ BOD Incubators & Refrigerators.
b) Different size of Desert coolers
Strengthening of frame/stand/ply etc.for old installed AC and desert coolers in Factory and Township
a) Different sizes of portable AC upto 2 T
b) Different sizes of desert coolers
Shifting for new installation of AC, Desert cooler, Water cooler, Refrigerator from Factory to Township & vice versa
a) Different capacity of portable AC up to 2 T
b)Different capacity of water cooler up to 150 Ltr.
c)Different capacity of Refrigerator up to 400 Ltr.
d) Different capacity of Desert Coolers of all sizes
e)Bottle cooler/ Deep freezer/ BOD Incubators of all sizes
Providing & Fixing/ Replacement of Float Valve Assembly complete in all respects,15 mm nominal bore of Desert Coolers installed in factory & township.
Providing fixing/ Replacement of Flexible water line connections pipe 15 mm nominal bore& 30 cm long from the existing water lines to the Desert Coolers/ water coolers of factory & township.
Part B-3: REPAIR JOBS & SUPPLY OF REFRIGERANT GAS/CAC PLANT SPARES
Repair of Crank Shaft of FRICK Make 606 compressor by grinding of connecting rod segments, re-metalling of Big End Bearings with white metal matching to connecting rod segments size, Re-metalling of Main Body Bush with white metal and shaft by spray welding process as per actual size given & cleaning of oil ports.
Repair of Crank Shaft of FRICK Make 303 compressor by grinding of connecting rod segments, re-metalling of Big End Bearings with white metal matching to connecting rod segments size, Re-metalling of Main Body Bush with white metal and shaft by spray welding process as per actual size given & cleaning of oil ports.
Supply of Refrigerant Gas R-12
Supply of Refrigerant Gas R-22
Supply of Refrigerant Gas 134a
Supply of different types of V-belts (A-28/31/32/39/40 etc.)
Supply of Filter Drier of Reputated Make
Supply of Expansion Valve of Reputated Make
Supply of 3/5 TR Compressor of reputated make for AC Package unit
NOTES TO ANNEXURE 1) For Part B-1 & B-2, the rates are inclusive of all material required for completion of job and no additional payment shall be made to the contractor. 2) Gas filling includes checking & repair of leaking points in gas circuit and shall be carried out by the contractor at no additional cost. 3) For any clarification regarding job execution, refer to the Job Specifications & Scope of work.
S G TECHNOFAB PVT LTD
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .