| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹2.4 Cr+₹0.90 (<0.01%)Accepted-AOC VILL GARBHANGA BIKASH NAGAR P O BASISTHA P S BASISTHA DIST KAMRUP M ASSAM | KAMRUP | ASSAM | 781030 | ₹2.4 Cr+₹0.90 (<0.01%) | L2 | Accepted-AOC Awarded |
| 2 | L1₹2.4 CrRejected-Finance HOUSE NO 20 BAGHARBARI VIDYANAGAR 2 PANJABARI GUWAHATI ASSAM 781037 | KAMRUP METRO | ASSAM | 781037 | ₹2.4 Cr | L1 | Rejected-Finance Not admitted |
| 3 | L2₹2.4 Cr+₹0.90 (<0.01%)Rejected-Finance 3RD FLOOR KRISHNA RICE MILL BUILDING PAGLASTHAN BONGAIGAON 783380 | BONGAIGAON | ASSAM | 783380 | ₹2.4 Cr+₹0.90 (<0.01%) | L2 | Rejected-Finance Not admitted |
| 4 | L2₹2.4 Cr+₹0.90 (<0.01%)Rejected-Finance VILL BANDUGURI P O P S SIDLI DIST CHIRANG BTC ASSAM PIN 783394 | CHIRANG | ASSAM | 783394 | ₹2.4 Cr+₹0.90 (<0.01%) | L2 | Rejected-Finance Not admitted |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not admitted |
| Sl No | Description | Qty | Unit | PADMAVATI CONSTRUCTION L2 | TEKLO BORO BASUMATARY L2 | LIZA KALITA L2 | Dhaneswar Kalita L1 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of Head works | |||||||
| 1.01 | Cutting jungles and trees upto50 cmgirth including uprooting root sand stumps and removing themfrom site of work etc, complete as directed. | 894.7 | Sqm | 15 ₹13,420.5 Lowest | 16.89 ₹15,111.48 | 16.89 ₹15,111.48 | 16 ₹14,315.2 |
| 1.02 | Earthwork in excavation in foundation of head work in all types of soil as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). | 3,133.42 | Cum | 280 ₹8,77,357.6 Lowest | 343.65 ₹10,76,799.78 | 343.65 ₹10,76,799.78 | 340 ₹10,65,362.8 |
| 1.03 | Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed by the department (Including paying of forest royalty and sales tax etc.) Distance of work site from quarry @ 50 Km | 56.03 | Cum | 2,200 ₹1,23,266 | 2,206.98 ₹1,23,657.09 | 2,206.98 ₹1,23,657.09 | 1,800 ₹1,00,854 Lowest |
| 1.04 | Cost of dewatering in excavation of earthwork by running required no. of pumps including the cost of POL, hire charge, labour charge etc. and handling for a depth of maximum 3.2 M, complete as directed. | 9,180 | H.P Hr | 15 ₹1,37,700 Lowest | 24.42 ₹2,24,175.6 | 24.42 ₹2,24,175.6 | 24 ₹2,20,320 |
| 1.05 | CC work in proportion 1:4:8 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). | 42.03 | Cum | 6,500 ₹2,73,195 Lowest | 6,968.16 ₹2,92,871.76 | 6,968.16 ₹2,92,871.76 | 7,700 ₹3,23,631 |
| 1.06 | CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). | 22.5 | Cum | 7,500 ₹1,68,750 | 7,441.23 ₹1,67,427.68 Lowest | 7,441.23 ₹1,67,427.68 Lowest | 8,150 ₹1,83,375 |
| 1.07 | CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). | 407.77 | Cum | 8,500 ₹34,66,045 | 8,254.18 ₹33,65,806.98 Lowest | 8,254.18 ₹33,65,806.98 Lowest | 9,100 ₹37,10,707 |
| 1.08 | RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid
separately). | 541.02 | Cum | 10,500 ₹56,80,710 | 9,803.74 ₹53,04,019.41 Lowest | 9,803.74 ₹53,04,019.41 Lowest | 10,700 ₹57,88,914 |
| 1.09 | Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed. | 305.08 | qtl. | 13,500 ₹41,18,580 | 12,295.76 ₹37,51,190.46 | 12,295.76 ₹37,51,190.46 | 12,000 ₹36,60,960 Lowest |
Tender Value
₹2.6 Cr
EMD Value
₹5.3 L
Closing Date
23 Jul 2025, 2:00 pmClosed
Chief Engineer Minor Irrigation Assam
o-o the Chief Engineer Irrigation Assam Chandmari Guwahati-03
Construction of Nimagaon FIS under RIDF-XXX (NABARD) for the year 2024-25 under Sidli Division (I) Sidli
2025_ID_45236_1
06 (RIDF-XXX) 2025-26 Date_27/06/2025
Open Tender
Civil Works
Item Rate
270 days
Sidli
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,500
₹5.3 L
Yes
o-o the Chief Engineer Irrigation Assam Chandmari
28 Nov 2025
30 Jun 2025
23 Jul 2025
30 Jun 2025
23 Jul 2025
10 Jul 2025
10 Jul 2025
Amount
Construction of Head works
Cutting jungles and trees upto50 cmgirth including uprooting root sand stumps and removing themfrom site of work etc, complete as directed.
Earthwork in excavation in foundation of head work in all types of soil as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).
Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed by the department (Including paying of forest royalty and sales tax etc.) Distance of work site from quarry @ 50 Km
Cost of dewatering in excavation of earthwork by running required no. of pumps including the cost of POL, hire charge, labour charge etc. and handling for a depth of maximum 3.2 M, complete as directed.
CC work in proportion 1:4:8 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Providing scaffolding work with rows of Bholuka bamboo and Jati bamboo horizontal one row jati bamboo cross and placing second class planks of 0.025 m thick in between the rows tying with coir strings lacing two nos. vertical jati bamboo at both end including dismantling the scaffolding etc. complete as directed.
Collection and supply of one man size 23cm to 30cm collected manually from quarry rocks; stacking at quarry site including payment and forest royalties etc. complete as directed.
Collection & supply of sand free from dust, dirt & other foreign materials from the approved quarry including screening, stacking and payment of necessary forest royalty including carrying to the work site etc. Complete as directed. Distance of work site from quarry @ 25 Km Below Protection Block
Carriage of boulder, gravels, metals, screening sand etc. by truck including loading, unloading and stacking in measurable stacks at site as directed complete. (for subsequent Km.) Below Protection Block
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete as directed.
Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc.
Dewatering of CC works considering 1 no. 10 HP and 1 no. of 5 HP pump including POL, carriage and operator's pay etc.
Supplying and mixing rapidite in concrete works below ground water level where necessary etc. complete as directed.
Providing 75 mm dia. Weep Holes including supplying and fixing 75 mm dia PVC pipe in weep holes, complete as directed.
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Providing and driving 'Z' type steel sheet pile of 0.69 M : effective width, 8 mm thick and average weight 68.30 kg/M to specified level and lines including cutting to proper size, making holes including painting sheet piles with two coats of anticorrosive bitumen paint and dewatering including necessary tools and plants and all : other accessories, complete as directed. (Portion of sheet pile are to be embedded in concrete shall not be painted)
Driving 'Z' type steel sheet pile of 0.69 M effective : width, 8 mm thick and average weight 68.30 kg/M to specified level and lines including cutting to proper size, making holes including painting sheet piles with two coats of anticorrosive bitumen paint and dewatering including necessary tools and plants and all other : accessories, complete as directed. (Portion of sheet pile are to be embedded in concrete shall not be painted).
Supply, Fabrication, Installation and Commissioning at site including painting of Shutter Assembly of Cross Regulator/ Head Regulator gates of different size made of 6 mm thick M.S. skin plate, with 10 mm dia. hole to be drilled at an interval of 150 mm apart on both the vertical sides and one horizontal side at the bottom at a fixed distance from the edge, and MS channel of size 100mm x 50mm x 4.7mm or 125mm x 65mm x 5mm for shutter frame, Horizontal girders and vertical stiffeners, fitting fixing of C.I. Guide Roller of size 75 mm x 67mm x 100mm x 20mm having 25 mm dia hole with pin Guide roller M.S. bracket of size 90mm x 90 mm x 250mm made of 12 mm thick and 90 mm wide M.S. Flat with guide roller pin fitted on the shutter frame, having required slots and holes and supply, fitting and fixing of 'J' type rubber seal, of size 125 mm, 'J' type rubber seal corner of size 125 mm with fabricated M.S. fastener of 50 mm width x 8 mm thick having 10 mm dia. hole at an interval of 150 mm apart for Regulator Gates complete as per design & drawing & as directed. B] C/Regulator & H/Regulator GATES OF SIZE less than 5.0 м²
Construction of Closing bund
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
Construction of whole bamboo single pallasiding with matured bhaluka bamboo post 7.5 cm to 10 cm dia 5 cm apart 1.5 M to 1.8 M above ground and 1 M to 1.2 M below ground with jati bamboo struts placed 1.2 M to 1.5 M apart tied with galvanized wire with 16 G to 18 G complete with 3 rows of horizontal half jati bamboo kamies, complete as directed
Supply and laying of cement bags filled with sand/ earth (as locally available) including stitching the mouth, laying, fixing in position as directed complete with supply of bags, sutlies etc, all complete as directed.
Construction of Diversion Channel
Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 30 M and lift upto 1.50 M. (A)In ordinary Soil
Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of Afflux bundh
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed. (A) Ordinary soil
Construction of 1.00 M x 1.00 M rectangular boulder sausage including supplying of materials with 25 cm to 30 cm size boulders collecting from a lead of 25 KM encased in 15 cm mesh of 8G hexagonal wire netting and filling the voids between the boulders with stone not exceeding 18 cm in size tied with 8G galvanized tying wire at 30 cm apart, laid in position as directed including necessary local carriage of materials, paying necessary forest royalty including providing 1 (one) no. of jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.20 M apart driven at least 0.60 M below ground and tying with sausage etc, all complete as directed. (ii) With river boulder
Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and complete as directed.
Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed.(A) For Normal Road upto 25.00 KM. (ii) With Contractor's Profit & GST
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete as directed
Construction of R.C.C. Main Canal & Branch
Earth work in excavation in foundation of canal structure in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation etc. complete as directed. (Including bailing out stagnant rain water where necessary). All types of soils except soil mixed with gravel and boulders. (For normal lead of 30 m and lift of 1.5 m)
Labour for preparation of subgrade of lined canal section as per design drawing and grade by ramming and rolled to level and according to the required cross section of the typical lined canal including cutting, filling the existing canal section where necessary compacting the earth in layers in not more than 15 cm thick to form a firm compacted bed & side for lining including watering to obtain required moisture content where necessary etc, complete as directed. (A) In ordinary Soil
Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed by the department (Including paying of forest royalty and sales tax etc.) Distance of work site from quarry @ 50 Km
Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc.
Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A River Singles (ii) With Shuttering with out dewatering
Cement Concrete work in proportion 1: 1 ½: 3 with aggregate of size 6 mmto 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed.(Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A River Singles (ii)With shuttering & without Dewatering
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
Earth work in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 Km. including paying compensation of earth obtained from private land if any, loading, unloading and stacking in measurable stacks not more than 1m height, spreading the same in 15 cm thick including clearing light jungles, removing trees up to 15cm dia uprooting roots and stumps etc. from the seat of embankment, profiling with all lift complete as directed. (Payment will be made after 12.5% shrinkage allowances from the gross quantity.)
Construction of Sign Board
Supply of sign board made of 1.60mm thick MS iron sheet fitted with steel frame of size 1.05 m x 0.75m fixed with 2 Nos. 50mm dia GI (medium) pipes 2.10m above and 0.60m below ground fitted with C.C. work in proportion 1:3:6 and size 0.45m x 0.45m x 0.60m below ground including painting with approved paint including writing letters complete as directed.
PADMAVATI CONSTRUCTION (BID ID -271980)
TEKLO BORO BASUMATARY (BID ID -272126)
LIZA KALITA (BID ID -272721)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .