Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.7 L+₹1.8 L (63.2%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹4.8 L
EMD Value
₹9,580
Closing Date
28 Jan 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MCD-III Jammu
Executive Engineer MCD-III Jammu
Upgradation of Drain nr H/O Ms Deepika Gupta and others in Lane no 1 Ambedkar Nagar in W.no 59
2026_HAUDD_300432_17
e-NITno.JMC/D-III/18 of 2025-26
Open Tender
Civil Works
Percentage
60 days
Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer MCD-III Jammu
₹9,580
20 Feb 2026
12 Jan 2026
29 Jan 2026
12 Jan 2026
28 Jan 2026
12 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Executive Engineer Division III, JMC Jammu.
Name of work:-Upgradation of Drain nr H/O Ms Deepika Gupta & others in Lane no 1 Ambedkar Nagar in W.no 59 Amount : 4.79 lacs
eNIT NO JMC/Div-III/ 18 of 2025-26
Name of the Bidder/ Bidding Firm / Company :
Sl. No. s Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) Cum 1725.2 Excess(+) Full Conversion INR INR Thirty Thousand One Hundred & Ninety One Only
2 Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. Cum 2516.85 Excess(+) Full Conversion INR INR Three Thousand Five Hundred & Twenty Three and Paise Fifty Nine Only
3 Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : Cum 479.3 Excess(+) Full Conversion INR INR Thirteen Thousand Four Hundred & Twenty and Paise Forty Only
4 Removal of Excavated mulba, dismantled unserviceable material from the site of work by MT/Animal transport or other wise including loading /unloading complete job. Cum Excess(+) Full Conversion INR INR Five Thousand Four Hundred & Eighty Six Only
5 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) Cum Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
6 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: . All works upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) Cum Excess(+) Full Conversion INR INR One Lakh Seventy Two Thousand &Eight Only
7 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) cum Excess(+) Full Conversion INR INR Eleven Thousand Nine Hundred & Thirty and Paise Sixteen Only
8 Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) cum Excess(+) Full Conversion INR INR Thirty Three Thousand One Hundred and Paise Seventy Only
9 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars. Thermo-Mechanically Treated bars of grade Fe-500D or more. Kg Excess(+) Full Conversion INR INR Forty Seven Thousand &Sixty Two and Paise Forty Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
10 Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns Sqm 286.35 Excess(+) Full Conversion INR INR Forty Five Thousand Two Hundred & Forty Three and Paise Thirty Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
11 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) Sqm 266.2 Excess(+) Full Conversion INR INR Twenty Five Thousand One Hundred & Twenty Nine and Paise Twenty Eight Only
12 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. kg Excess(+) Full Conversion INR INR Thirty Two Thousand Six Hundred & Eighty Eight Only
13 Carriage of sand and Stone Agg. by Mech. Transport from source to site of work Including loading unloading and stacking 10 km Avg. Sand and Bajree. Cum Excess(+) Full Conversion INR INR Seventeen Thousand Two Hundred & Sixteen and Paise Seventy Seven Only
Total in Figures INR Four Lakh Seventy Eight Thousand Nine Hundred & Ninety Six and Paise Fifteen Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_974725.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .