| 1 | L1₹1.4 CrAccepted-AOC 47 EZHIL NAGAR PUDUKKOTTAI 622 005 | PUDUKKOTTAI | TAMIL NADU | 622005 | ₹1.4 Cr | L1 | Accepted-AOC The L1 tender of M/s. JPS CONSTRUCTION after 3rd Negotiation is accepted. |
| 2 | L2₹1.5 Cr+₹4.9 L (3.45%)Rejected-AOC | ₹1.5 Cr+₹4.9 L (3.45%) | L2 | Rejected-AOC Quoted excess percentage than L1 tender |
| 3 | L3₹1.5 Cr+₹6.2 L (4.42%)Rejected-AOC 11C BHARATHI COLONY MADUKKARAI MARKET COIMBATORE TAMIL NADU 641105 UDYAM TN 03 0003766 | COIMBATORE | TAMIL NADU | 641105 | ₹1.5 Cr+₹6.2 L (4.42%) | L3 | Rejected-AOC Quoted excess percentage than L1 tender |
| 4 | L4₹1.5 Cr+₹7.6 L (5.40%)Rejected-AOC 28 1 16 | ₹1.5 Cr+₹7.6 L (5.40%) | L4 | Rejected-AOC Quoted excess percentage than L1 tender |
| 5 | L5₹1.5 Cr+₹9.0 L (6.37%)Rejected-AOC NO 7 153 VINAYAGAPURAM ATHANUR POST RASIPURAM TK NAMAKKAL | ₹1.5 Cr+₹9.0 L (6.37%) | L5 | Rejected-AOC Quoted excess percentage than L1 tender |
| Sl No | Description | Qty | Unit | JPS CONSTRUCTION L1 | Raja and company L3 | PRR CONSTRUCTION L2 | G ILANGUMARAN L4 | Sri Velmurugan Construction L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Cold Milling to a depth of 40mm using milling machine including hire and running charges for the machine cleaning the milled surface as to avoid slippery including all other incidental charges and other unforeseen charges etc., complete. (As per TNBP No. 85) | 902 | Sqm | 125 ₹1,33,045 Lowest | 130.22 ₹1,38,600.96 | 129 ₹1,37,302.44 | 131.44 ₹1,39,899.48 | 132.65 ₹1,41,187.35 |
| 2.00 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10m within the compound in places shown by the TANSIDCO Engineers and clearing and levelling the site etc., complete complying with standard specification and as directed by the TANSIDCO Engineers. (As per TNBP No. 20A) | 1,476 | Cum | 125 ₹2,17,710 Lowest | 131.89 ₹2,29,710.18 | 130.66 ₹2,27,567.91 | 133.12 ₹2,31,852.44 | 134.35 ₹2,33,994.71 |
| 3.00 | Providing and laying of Gravel including cost and conveyance of the same to work site from approved quarry including stacking the same to departemental gauge for premeasurement including all labour charges for laying, spreading, all hire and fuel charges for power roller for compaction etc., complete and as directed by the TANSIDCO Engineers for making up of low berms. (Payment will be made for consolidated thickness of gravel only). (As per MORTH Specification 111, 112, 401 & 900) | 152 | Cum | 1,380 ₹2,47,516.8 Lowest | 1,436.15 ₹2,57,587.86 | 1,422.73 ₹2,55,180.85 | 1,449.58 ₹2,59,996.67 | 1,463 ₹2,62,403.68 |
| 4.00 | Providing and laying Granular Sub-Base (GSB) layer of 200mm compacted thickness on the prepared sub grade with approved graded material of minimum CBR value of 30 grading conforming to Table 400 - 1 of MORTH including screening, spreading in uniform layer with motor grader, watering and premixing in a mechanical Mix plant at optimum moisture content, compacting with power roller of 8 to 10 T static weight to not less than 98% of the maximum laboratory dry density as per IS : 2720 (Part b) and fine dressing to the required grade and cross slope as shown in the drawing or as directed by the Engineer, including obtaining and transporting all materials from approved quarry site to work site with all lifts and lead by mechanical transport, head load or any other mode of transportation, including labour, tools, equipment, safety measures, testing and incidentals necessary to complete the work and as directed by SIDCO Engineers. (As per MORTH Specification 111, 112, 401 & 900) | 648 | Cum | 3,200 ₹24,46,848 Lowest | 3,303.09 ₹25,25,674.74 | 3,272.22 ₹25,02,070.3 | 3,333.96 ₹25,49,279.17 | 3,364.83 ₹25,72,883.61 |
| 5.00 | Plain Cement Concrete 1:5:10 (One cement, five crushed stone sand and ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc., complete complying with standard specification and as directed by the TANSIDCO Engineers. (As per TNBP No. 28) | 208 | Cum | 6,400 ₹15,70,816 Lowest | 6,641.81 ₹16,30,165.85 | 6,579.74 ₹16,14,931.39 | 6,703.88 ₹16,45,400.31 | 6,765.96 ₹16,60,637.22 |
| 6.00 | Reinforced Cement Concrete of M30 Grade Design Mix using M Sand, 20mm and 40mm gauge HB stone jelly for all RCC items of works excluding centering, shuttering & also cost of reinforcement grill in position but including the cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing and curing etc., complete and as directed by the SIDCO Engineers. (As per TNBP No. 30) | 395 | Cum | 10,000 ₹46,61,000 Lowest | 10,562.61 ₹49,23,232.52 | 10,463.9 ₹48,77,223.79 | 10,661.33 ₹49,69,245.91 | 10,760.04 ₹50,15,254.64 |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel Reinforcement Grills of all variety like HYSD/CTD/TMT and all grade like Fe 500, Fe550D, Fe 500D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the TANSIDCO Engineers. (Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire). (As per TNBP No. 30 & 86) | 9.5 | MT | 95,000 ₹10,64,950 Lowest | 97,373.75 ₹10,91,559.74 | 96,463.71 ₹10,81,358.19 | 98,283.78 ₹11,01,761.17 | 99,193.82 ₹11,11,962.72 |
| 8.00 | Supplying and erecting Shuttering with necessary supports such as RCC Column boxing, top & bottom slabs, sill slabs, sunshade with all cross bracings including strutting using silver oak (country wood) joists of size 10cm x 6.5cm spaced at about 90cm centre to centre etc., complete. (As per TNBP No. 86 & 86A) | - | - | - | - | - | - | - |
| 8.10 | For Plane Surfaces | 299 | Sqm | 1,000 ₹3,52,820 Lowest | 1,010.62 ₹3,56,566.95 | 1,001.17 ₹3,53,232.8 | 1,020.06 ₹3,59,897.57 | 1,029.51 ₹3,63,231.72 |
| 8.20 | For Square or Rectangular Column | 88 | Sqm | 1,300 ₹1,34,992 Lowest | 1,345.42 ₹1,39,708.41 | 1,332.84 ₹1,38,402.11 | 1,357.99 ₹1,41,013.68 | 1,370 ₹1,42,260.8 |
Tender Value
₹1.4 Cr
EMD Value
₹67,000
Closing Date
22 Jul 2025, 3:00 pmClosed
Superintending Engineer
8th Floor, TANSIDCO Corporate Office Building, Thiru.Vi.Ka Industrial Estate, Guindy, Chennai - 32
Upgradation of Infrastructure Facilities at TANSIDCO Industrial Estate, Nagapattinam in Nagapattinam District
2025_TANSI_581546_1
7011(TN-2)/SE/DB/2025 - 15
Open Tender
Civil Works
Lump-sum
Nagapattinam in Nagapattinam District
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹67,000
Yes
2 Sept 2025
14 Jul 2025
23 Jul 2025
14 Jul 2025
22 Jul 2025
14 Jul 2025
Amount
Cold Milling to a depth of 40mm using milling machine including hire and running charges for the machine cleaning the milled surface as to avoid slippery including all other incidental charges and other unforeseen charges etc., complete. (As per TNBP No. 85)
Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10m within the compound in places shown by the TANSIDCO Engineers and clearing and levelling the site etc., complete complying with standard specification and as directed by the TANSIDCO Engineers. (As per TNBP No. 20A)
Providing and laying of Gravel including cost and conveyance of the same to work site from approved quarry including stacking the same to departemental gauge for premeasurement including all labour charges for laying, spreading, all hire and fuel charges for power roller for compaction etc., complete and as directed by the TANSIDCO Engineers for making up of low berms. (Payment will be made for consolidated thickness of gravel only). (As per MORTH Specification 111, 112, 401 & 900)
Providing and laying Granular Sub-Base (GSB) layer of 200mm compacted thickness on the prepared sub grade with approved graded material of minimum CBR value of 30 grading conforming to Table 400 - 1 of MORTH including screening, spreading in uniform layer with motor grader, watering and premixing in a mechanical Mix plant at optimum moisture content, compacting with power roller of 8 to 10 T static weight to not less than 98% of the maximum laboratory dry density as per IS : 2720 (Part b) and fine dressing to the required grade and cross slope as shown in the drawing or as directed by the Engineer, including obtaining and transporting all materials from approved quarry site to work site with all lifts and lead by mechanical transport, head load or any other mode of transportation, including labour, tools, equipment, safety measures, testing and incidentals necessary to complete the work and as directed by SIDCO Engineers. (As per MORTH Specification 111, 112, 401 & 900)
Plain Cement Concrete 1:5:10 (One cement, five crushed stone sand and ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc., complete complying with standard specification and as directed by the TANSIDCO Engineers. (As per TNBP No. 28)
Reinforced Cement Concrete of M30 Grade Design Mix using M Sand, 20mm and 40mm gauge HB stone jelly for all RCC items of works excluding centering, shuttering & also cost of reinforcement grill in position but including the cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing and curing etc., complete and as directed by the SIDCO Engineers. (As per TNBP No. 30)
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel Reinforcement Grills of all variety like HYSD/CTD/TMT and all grade like Fe 500, Fe550D, Fe 500D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the TANSIDCO Engineers. (Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire). (As per TNBP No. 30 & 86)
Supplying and erecting Shuttering with necessary supports such as RCC Column boxing, top & bottom slabs, sill slabs, sunshade with all cross bracings including strutting using silver oak (country wood) joists of size 10cm x 6.5cm spaced at about 90cm centre to centre etc., complete. (As per TNBP No. 86 & 86A)
For Plane Surfaces
For Square or Rectangular Column
Providing Groove Cutting of 5mm width and 60mm average depth in the existing Reinforced Cement Concrete including hire charges for cutting machine, cost of cutting wheel, watering charges for cleaning, cost of bitumen, filling charges and labour charges etc., complete.
Levelling and Compacting the Reinforced Cement Concrete M30 Grade Design Mix including vacuum dewatering finishing the surface with mechanical traveller finishing, fixing and removing the inner channel after finishing the works with proper gradient and alignment including all materials, labours and tools & plants etc., complete and as directed by the TANSIDCO Engineers. (As per TNBP No. 30)
Providing and laying Tack Coat over existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. (As per Clause 503 of MORTH Rev-5).
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm, 0.43 cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, paver finisher, vibratory roller and all other tools and plant required including all other incidental charges etc., complete as per specification using CMP. (As per Clause 504 of MORTH Rev-5)
Providing and laying Bituminous Concrete to 40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36mm and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, paver finisher, vibratory roller and all other tools and plant required including fuel and all other incidental charges etc., complete as per specification using CMP. (As per Clause 507 of MORTH Rev-5)
Providing and laying of Hot Applied Thermoplastic Compound 2.5mm thick including reflectorising glass beads at 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC : 35. The finished surface to be level, uniform and free from streaks and holes. The rate includes cost of thermoplastic and labour charges etc., complete. (As per MORTH Specification 803)
Conveyance charges for Milling materials to the places shown by the Engineer incharge through lorries etc., complete.
Conveyance the Surplus Earth to the places shown by the Engineer incharge including loading into lorries, conveying unloading from lorries and spreading in places indicated as instructed by the Engineer incharge with a lead of 0 to 1 km etc., complete.
Cleaning Scrub Jungle as directed by the TANSIDCO Engineers etc., complete. (As per TNBP No. 16)
Providing and Fixing Precast RCC Post of sizes 125x125mm at bottom and 100x100mm at top and 2100mm height for the Vertical Posts in RCC 1:2:4 (One cement, two crushed stone sand and four hard broken stone jelly) using 20mm broken granite stone including necessary earth work excavation and erection of posts with CC 1:5:10 (One cement, five crushed stone sand and ten hard broken stone jelly) using 40mm hard broken stone, 300x300x600 mm foundation excluding cost of steel and fabricating of reinforcement but including moulding, casting, finishing with the provisions of 6mm dia holes as directed for tying barbed wire, curing and refilling with excavated earth levelling etc., complete.
Providing and Fixing Precast RCC Post of sizes 125x125mm at bottom and 100x100mm at top and 2100mm height for the Strut Posts in RCC 1:2:4 (One cement, two crushed stone sand and four hard broken stone jelly) using 20mm broken granite stone including necessary earth work excavation and erection of posts with CC 1:5:10 (One cement, five crushed stone sand and ten hard broken stone jelly) using 40mm hard broken stone, 450x450x600 mm foundation excluding cost of steel and fabricating of reinforcement but including moulding, casting, finishing with the provisions of 6mm dia holes as directed for tying barbed wire, curing and refilling with excavated earth levelling etc., complete.
Providing Fencing with GI Barbed Wire 10gauge 2 ply and tying the barbed wire above without any sag with first bottom row at 150mm above GL and the other rows at 225mm centre to centre with verticals at 300mm centre to centre continuously without any break as directed and tied with necessary bolts and nuts as required etc., complete. The rates are inclusive of cost of barbed wire and binding wire. (The barbed wire and binding wire should be of good quality).
Earth work excavation for foundation by manual means for RR / brick and other step type footings for load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring, shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the TANSIDCO Engineers with an initial lead of 10m and initial lift of 2m and clearing and levelling the site etc., complete complying with standard specification and as directed by the TANSIDCO Engineers. (As per TNBP No. 23 & 24)
Supplying and filling in foundation, basement with Stone Dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the TANSIDCO Engineers. (As per TNBP No. 24 & 25)
Reinforced Cement Concrete 1:2:4 (One cement, two crushed stone sand and four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill, fabricating charges centering and shuttering but including super plasticiser, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One cement and three M Sand) and kraft paper laid over it without claiming extra etc., complete complying with standard specification and as directed by the TANSIDCO Engineers. (As per TNBP No. 30)
Precast Concrete Block Masonry using Solid Concrete Blocks of size 400x150x200mm of grade C (5.0) conforming to IS 2185 (Part 1) : 2005 with Cement Mortar 1:5 (One cement and five crushed stone sand) in accordance with IS 2572:2005 including mortar plasticizer, curing etc., complete complying with standard specification and as directed by the TANSIDCO Engineers.
Plastering the surface of walls with Cement Mortar 1:3 (One cement and three crushed stone sand), 10mm thick including mortar plasticizer at 200ml per 50Kg of cement used, curing etc., complete complying with standard specification and as directed by the TANSIDCO Engineers. (As per TNBP No. 56 & 57)
Painting the walls with two coats of cement paint over one coat of cement primer including preparation of surface curing etc., complete complying with standard specifications and as directed by the TANSIDCO Engineers. (The colour and shade of the cement paint shall be got approved by the Executive Engineer before use of work) (As per TNBP No. 66A)
White Washing two coats with freshly burnt white shell lime including cost of lime, blue powder, fevicol type gum, brushes, scaffolding charges etc., complete complying with standard specification and as directed by the TANSIDCO Engineers. (As per TNBP No. 63)
Supplying, fabricating and fixing in position of MS Gate of required size using MS Structural Steel including 2 sets of gudget pin, 1 No of latch, 1 No of tower bolt with locking arrangements including two coats of painting over a priming coat and labour charges etc., complete and as directed by the TANSIDCO Engineers. (As per TNBP No. 84A)
Earth work excavation for forming Earthen Drain by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10m within the compound in places shown by the TANSIDCO Engineers and clearing and levelling the site etc., complete complying with standard specification and as directed by the TANSIDCO Engineers. (As per TNBP No. 20A)
Earth work excavation and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth etc., complete complying with standard specification and as directed by the TANSIDCO Engineers. (As per TNBP No. 20A)
Conveyance the Surplus Earth to the places shown by the Engineer incharge including loading into lorries, conveying unloading from lorries and spreading in places indicated as instructed by the Engineer incharge with a lead of 1 to 2 km etc., complete.
Supply and filling of Earth in low lying area of the plots from approved quarry by lorries or tippers. The rate including earth work excavation, cost of earth, loading, conveyance, unloading at site and levelling charges as shown by the TANSIDCO Engineers and other incidental charges for tools & plants engaged etc., complete complying with standard specification. (Payment will be made for consolidated thickness).
PRR CONSTRUCTION (BID ID -1408577)
Raja and company (BID ID -1408535)
G ILANGUMARAN (BID ID -1408885)
Sri Velmurugan Construction (BID ID -1408657)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .