Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.0 LAdmitted-Finance | ₹5.0 L | L2 | Admitted-Finance |
| 3 | L3₹5.9 LAdmitted-Finance | ₹5.9 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SAKET ELECTRONICS L1 | M/s A.P.Enterprises L2 | SUNEEL KUMAR VERMA L3 |
|---|---|---|---|---|---|---|
| 1.00Name of Material | ||||||
| 2.00 | A. Cartage of PCC/ST Pole Long. | 70 | Nos. | 829 ₹58,030 | 860 ₹60,200 | 890 ₹62,300 |
| 3.00 | B. Cartage of Other matching material. | 1 | MT | 3,180 ₹3,180 | 3,300 ₹3,300 | 3,600 ₹3,600 |
| 4.00 | Dragging of PCC Pole from dump site to pit site | 70 | Nos. | 226 ₹15,820 | 200 ₹14,000 | 380 ₹26,600 |
| 5.00 | Repairing, Fabrication & Erection of Single Pole Support on PCC/ST Pole including digging of pit and fixing of all accessories as per RESSPO Norms. | 70 | Nos. | 2,492 ₹1.7 L | 2,450 ₹1.7 L | 2,400 ₹1.7 L |
| 6.00 | Resagging of loose conductor of LT line after opening of binding from LT shackle insulator and opening of jumpring and then after tightening of conductor | 60 | Span | 495 ₹29,700 | 500 ₹30,000 | 700 ₹42,000 |
| 7.00 | Strenthening of tiled pole in LT line after opening of binding from LT shackle insulator and opening of jumpring and then after tightening of conductor | 50 | Nos. | 490 ₹24,500 | 500 ₹25,000 | 1,700 ₹85,000 |
| 8.00 | Providing and Installation of Almunium Lug. as per RESSPO Norms. All the material will be aranged by the contractor. | 360 | Nos. | 248 ₹89,280 | 245 ₹88,200 | 250 ₹90,000 |
| 9.00 | Providing and Installation of Fuse Wire 40 SWG and 39 SWG as per RESSPO Norms. All the material will be aranged by the contractor. | 35 | Kg. | 1,500 ₹52,500 | 1,500 ₹52,500 | 1,600 ₹56,000 |
| 10.00 | Providing and Installation of Fuse Wire 37 SWG and 30 SWG as per RESSPO Norms. All the material will be aranged by the contractor. | 20 | Kg. | 1,500 ₹30,000 | 1,500 ₹30,000 | 1,700 ₹34,000 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
20 May 2026, 12:00 pmClosed
Se EDC Ambedkarnagar
Se EDC Ambedkarnagar
The Work Of Repairing And Maintenance Of Lt Ht Line Devi Aapda Associated Works As Narrated In Schedule Of Quantity Prices In The Jurisdiction OfElectricity Distribution Division Tanda Ambedkarnaga
2026_MVVNL_1148148_1
08-EDC(A)/2026-27
Open Tender
Miscellaneous Works
365 days
EDC Ambedkarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Se EDC Ambedkarnagar
₹5,000
26 May 2026
13 May 2026
20 May 2026
13 May 2026
20 May 2026
13 May 2026
13 May 2026 - 20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Name of Material | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 2 | A. Cartage of PCC/ST Pole Long. | 70 | Nos. | - | - | BI01010001010000000000000515BI0100001113 |
| 3 | B. Cartage of Other matching material. | 1 | MT | - | - | BI01010001010000000000000515BI0100001114 |
| 4 | Dragging of PCC Pole from dump site to pit site | 70 | Nos. | - | - | BI01010001010000000000000515BI0100001115 |
| 5 | Repairing, Fabrication & Erection of Single Pole Support on PCC/ST Pole including digging of pit and fixing of all accessories as per RESSPO Norms. | 70 | Nos. | - | - | BI01010001010000000000000515BI0100001116 |
| 6 | Resagging of loose conductor of LT line after opening of binding from LT shackle insulator and opening of jumpring and then after tightening of conductor | 60 | Span | - | - | BI01010001010000000000000515BI0100001117 |
| 7 | Strenthening of tiled pole in LT line after opening of binding from LT shackle insulator and opening of jumpring and then after tightening of conductor | 50 | Nos. | - | - | BI01010001010000000000000515BI0100001118 |
| 8 | Providing and Installation of Almunium Lug. as per RESSPO Norms. All the material will be aranged by the contractor. | 360 | Nos. | - | - | BI01010001010000000000000515BI0100001119 |
| 9 | Providing and Installation of Fuse Wire 40 SWG and 39 SWG as per RESSPO Norms. All the material will be aranged by the contractor. | 35 | Kg. | - | - | BI01010001010000000000000515BI0100001120 |
| 10 | Providing and Installation of Fuse Wire 37 SWG and 30 SWG as per RESSPO Norms. All the material will be aranged by the contractor. | 20 | Kg. | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tender_08_2026_27.pdf
Tender Documents • 1.32 MB
BOQ_2148873.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid