Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.7 LAdmitted-Finance | -35.50% | ₹18.7 L | L1 | Admitted-Finance |
| 2 | L2₹22.4 LAdmitted-Finance | -22.65% | ₹22.4 L | L2 | Admitted-Finance |
Tender Value
₹29.0 L
EMD Value
₹58,040
Closing Date
16 Apr 2026, 6:00 pmClosed
Er. Raman Kumar (Xen PWD Chenani)
PWD OFFICE CHENANI
Refer to BOQ
2026_PWDJK_307620_2
e-NIT No. 05 of 2026-27 Dated 09-04-2026
Open Tender
Civil Works
90 days
Chenani
Refer to e-NIT/SBD
2 documents required · 2 mandatory
₹600
XEN PWD CHENANI
₹58,040
20 Apr 2026
9 Apr 2026
17 Apr 2026
9 Apr 2026
16 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : @60%, Ordinary Rock @20%, and Hard Rock @20%. | - | cum | 1 | - |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : @70%, Ordinary Rock @20%, and Hard Rock @10%. | - | cum | - | - |
| 3 | Hand packed stones in wiring crates including cost of wire crates and stones. | - | cum | - | - |
| 4 | Dumping stones filling including cost of stones on horizontal level, all complete | - | cum | 1 | - |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | - | cum | - | - |
| 6 | Dismantling old protection work including cutting of crates and stacking of stones. | - | cum | - | - |
| 7 | Hand-packing stones in wire-crates; including cost of crates (stone available) | - | cum | - | - |
| 8 | Slip clearance, In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. | - | cum | 1 | - |
| 9 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 10 | Providing and laying of RBM | - | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_997867.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid