Loading…
Loading…
Tender Value
₹6.2 L
EMD Value
₹61,945
Closing Date
1 Oct 2026, 1:00 pm4d left
EO
Nagar Panchayat Jhalu
Construction of a tin shed at Kanha Gaushala, Nagar Panchayat Jhalu, District Bijnor.
2026_DOLBU_1184726_7
10/E-Tender/2026-27
Open Tender
Civil Works
Percentage
90 days
Nagar Panchayat Jhalu
Please refer Tender documents.
2 documents required · 2 mandatory
₹700
EO
₹61,945
11 Sept 2026
11 Sept 2026
3 Oct 2026
11 Sept 2026
1 Oct 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Tin Shed | |||||
| 1.01 | Earth work in excavation in ordinary soil including lift upto 1.50M and lead upto 30M including supply of all material,labour and T&P etc.required for proper completion of work | 4.05 | Cum | 200 | ₹810 |
| 1.02 | Concrete in 1:4:8 with cement,fine sand and stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work | 2.03 | Cum | 6,850 | ₹13,905.5 |
| 1.03 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in raft foundation i/c supply of all material,labour and T&P etc.including all complete of work | 1.8 | Cum | 7,665 | ₹13,797 |
| 1.04 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in plinth beam,tie beam i/c supply of all material,labour and T&P etc.including all complete of work | 4.56 | Cum | 8,445 | ₹38,509.2 |
| 1.05 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in Column i/c supply of all material,labour and T&P etc.including all complete of work | 2.43 | Cum | 8,460 | ₹20,557.8 |
| 1.06 | Mils steel or iron in plain work such as reinforced concrete or reinforced brick work (when not including in an over all rate)wrought to required shape as necessary including bending for proper compaction of.the work and including supply of all steel. | 6.62 | Qtl | 7,050 | ₹46,671 |
| 1.07 | M-150 brick work in 1:6 with cement,coarse sand mortar in foundation and plinth including supply of all material,labour and T&P etc.required for proper completion of work | 1.3 | Cum | 5,310 | ₹6,903 |
| 1.08 | Cement concrete with 4cm gague approved stone ballast coarse sand and cement in proporation of 4:2:1 but with 2cm gaguge stone gritt instead of 4cm gauge stone ballast inculding supply of all materials labour and T&P etc for proper completion of work. | 1.62 | Cum | 7,600 | ₹12,312 |
| 1.09 | Applying two coat enaimel paint with priming coat on wood or steel and other metal surface including supply of all material,labour and T&P etc required for proper completion of work | 113.53 | Sqm | 78 | ₹8,855.34 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.44 MB
BOQ_2229100.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .