Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC S O LT MANINDRA BASUMATARY VILL P O BANARGAON P S DOTMA DIST KOKRAJHAR BTC ASSAM | BANARGAON | KOKRAJHAR | ASSAM | ₹1.0 Cr | L1 | Accepted-AOC Awarded |
| 2 | L1₹1.0 CrRejected-Finance | ₹1.0 Cr | L1 | Rejected-Finance Rejected. Refer to financial miutes |
| 3 | L1₹1.0 CrRejected-Finance MILIJULI PATH BELTOLA HATIGAON GUWAHATI KAMRUP METRO ASSAM 781028 | GUWAHATI | KAMRUP METRO | ASSAM | 781028 | ₹1.0 Cr | L1 | Rejected-Finance Rejected. Refer to financial miutes |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
6 Nov 2023, 10:00 amClosed
Director
OFFICE OF THE DIRECTOR OF SOIL CONSERVATION, ASSAM BHUMI SHANGRAKHAN BHAWAN, R.G.B. ROAD, GUWAHATI-781005
Gully Control and Water Distribution Project at Bhutankhuti under RIDF- XXVlll during 2022-23
2023_SCD_32955_2
Tender/NIT/Pt/2023-24/6503
Open Tender
Civil Works
Item Rate
90 days
Baksa
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,130
₹2.1 L
Yes
8 Feb 2024
11 Oct 2023
6 Nov 2023
12 Oct 2023
6 Nov 2023
16 Oct 2023
Amount
Baganpur Gully Control Project (Structure - 2)
Earth work in excavation of foundation of structures as per drawing and technical specification. In ordinary soil, Mannual means A) Above GBL
Earth work in excavation of foundation of structures as per drawing and technical specification. In ordinary soil, Mannual means B) Below GBL
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Suppying, fitting and fixing iron pipe for foot bridge railing
Providing Signboard inscribe in Marble/ Tiles
Construction of water distribution brick channel at Bhutankhuti Bangnabari (Structure - III)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
Providing soling in foundation and under floor with stone/best quality picked jhama brick, sand packed and laid to level and in panel after Brick on flat soling as specified.
Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggrete 40 mm nominal size mechanically mixed, place in foundation & compected by vibration including curing etc. complete as directed.
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and technical specifications
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
Cement plastering with cement morter (1:3) on R.C.C. works as per technical specifications.
Cost of R.C.C Signboard including painting, writing, fitting fixing at project site
Construction of water distribution brick channel at No. 1 Dihira (Structure - 4)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
Providing soling in foundation and under floor with stone/best quality picked jhama brick, sand packed and laid to level and in panel after Brick on flat soling as specified.
Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggrete 40 mm nominal size mechanically mixed, place in foundation & compected by vibration including curing etc. complete as directed.
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and technical specifications
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
Cement plastering with cement morter (1:3) on R.C.C. works as per technical specifications.
Cost of R.C.C Signboard including painting, writing, fitting fixing at project site
Ranjan Das
CHIRANJIT CHOUDHURY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .