Loading…
Loading…
Tender Value
₹3.3 L
EMD Value
₹6,540
Closing Date
24 Sept 2026, 5:00 pm
EXECUTIVE ENGINEER PWD (RNB) DIVISION KATRA
EXECUTIVE ENGINEER PWD (RNB) DIVISION KATRA
BOQ
2026_PWDJK_324356_1
e-NIT No. 33 of 2026-27 Dt. 11-09-2026
Open Tender
Civil Works
Percentage
30 days
KATRA
NIT
2 documents required · 2 mandatory
₹600
Yes
EXECUTIVE ENGINEER PWD (RNB) DIVISION KATRA
₹6,540
Yes
11 Sept 2026
11 Sept 2026
25 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix | 7.69 | cum | 1,725.2 | ₹13,266.79 |
| 2Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | |||||
| 2.01 | 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.48 | cum | 4,826.5 | ₹11,969.72 |
| 2.02 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 8.44 | cum | 5,733.6 | ₹48,391.58 |
| 3 | Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement: 3 fine sand) as per standard design. In 75x75 mm deep chase. | 37 | rmt | 241.45 | ₹8,933.65 |
| 4Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 4.01 | Foundations, footings, bases of columns etc. for mass concrete. | 22.2 | sqm | 286.35 | ₹6,356.97 |
| 4.02 | Suspended floors, roofs, landings, balconies and access platforms. | 11.1 | sqm | 718.2 | ₹7,972.02 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.82 | cum | 7,788.4 | ₹45,328.49 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 495.33 | kg | 123.2 | ₹61,024.66 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_1094064.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .