Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹37.4 LAdmitted-Finance MU PO JODGAVHAN TA MALEGAON DIST WASHIM MAHARASHTRA | JODGAVHAN | WASHIM | MAHARASHTRA | L1 | Admitted-Finance | ||
| 2 | L2₹37.8 L+₹37,445.59 (1.00%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹38.6 L+₹1.1 L (3.00%)Admitted-Finance NEW UDYOG COLONY WASHIM DIST WASHIM | WASHIM | WASHIM | MAHARASHTRA | 444505 | L3 | Admitted-Finance |
Tender Value
₹37.4 L
EMD Value
₹37,446
Closing Date
13 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Add CEO Z P Washim
Zilla Parishad Washim
Construction of Ganeshpur to Kawardari Road VR 59 Km 0/800 to 1/600 Tq. Malegaon Dist. Washim Under O.T.S.P. 2026-27
2026_WASHI_1352032_2
ZPWASHIM/WORKS/Tender NIT No.06/2026-2027/1stcall
Open Tender
Civil Works
Percentage
90 days
WASHIM
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,180
₹37,446
Works Division z p Washim
20 Nov 2026
6 Nov 2026
17 Nov 2026
6 Nov 2026
13 Nov 2026
6 Nov 2026
12 Nov 2026
30 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Ganeshpur to Kawardari Road VR 59 Km 0/800 to 1/600 Tq. Malegaon Dist. Washim Under O.T.S.P. 2026-27 | |||||
| 1.1 | Item No. 1 :- Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. [MORTH 201] (S.S.R.I.No. 2.09) | 1,458 | Sqm | 12 | ₹17,496 |
| 2 | Item No. 2 :- Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. [MORTH 309] (S.S.R.I.No. 2.18) | 1,749.6 | Cum | 119 | ₹2,08,202.4 |
| 3 | Item No. 3 :- Excavation for catch / side water gutter in hard murum & boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. [MORTH 309] (S.S.R.I.No. 2.19) | 583.2 | Cum | 139 | ₹81,064.8 |
| 4 | Item No. 4 :- Providing earth work in embankment with approved materials obtained from departmental land upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller to achieve not less than 97 % of standard proctor density etc. complete. (Material obtained from departmental Land) [MORTH 305] (S.S.R.I.No. 2.27) | 874.8 | Cum | 428.3 | ₹3,74,676.84 |
| 5 | Item No. 5 :- Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders/Rubble at the road side breaking them to required gradation including conveying the boulders/Rubble & stacking the broken metal etc complete (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal By breaking Boulders (Hand broken) [As directed by Engineer incharge] (S.S.R.I.No. 50.56) | 534.6 | Cum | 984.4 | ₹5,26,260.24 |
| 6 | Item No. 6 :- Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble & stacking the broken metal etc complete (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal By breaking Boulders (Hand broken) [As directed by Engineer-in-charge] (S.S.R.I.No. 50.57) | 243 | Cum | 1,034.4 | ₹2,51,359.2 |
| 7 | Item No. 7 :- Supplying soft murum at the road site, including conveying and stacking complete. (S.S.R.I.No. 2.29b) | 81 | Cum | 716.4 | ₹58,028.4 |
| 8 | Item No. 8 :- Supplying hard murum/ kankar at the road site, including conveying and stacking complete. [MORTH 408] (S.S.R.I.No. 2.29) | 521.24 | Cum | 719.4 | ₹3,74,980.06 |
| 9 | Item No. 9 :- Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . [As directed by Engineer-in-charge] (S.S.R.I.No. 50.58) | 777.6 | Cum | 85 | ₹66,096 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_2308122.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .