Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.9 LAccepted-AOC M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹5.9 L Quoted ₹5.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹5.9 LRejected-AOC 7 142 THOTILIL PATTY SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | ₹5.9 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SKSCONTRACTOR L2 | THIAGARAJAN ENGINEERING CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | OVERHAULING OF BURNERS: Removing inner and outer panel door, releasing all reach rods from burner tilt mechanism, dismantling of direct and indirect burner tilt mechanism components for inspection | 4 | corner | 14,500 ₹58,000 | 13,880 ₹55,520 |
| 2.00 | Inspection, cleaning, rectification and alignment of burner tilt mechanism components like bell crank clevis and drive lever, reassembling after fixing of coal nozzles, etc., with proper lubricants and connecting all reach rods with burner tilt mechanism including fixing of inner panel, outer panel doors (Asbestos tape gaskets and special lubricants will be supplied by board). | 4 | corner | 16,000 ₹64,000 | 14,900 ₹59,600 |
| 3.00 | Dismantling of old nozzle assembly from its compartment, cleaning and preparing the coal compartment for re-fixing of new coal nozzle | 24 | Nos. | 7,000 ₹1.7 L | 6,600 ₹1.6 L |
| 4.00 | Checking of new coal nozzles and tips for proper aligning of coal nozzles, checking the clearance, rectification if any, fixing of new coal nozzle assembly inside the coal compartment in position and checking the clearance, checking the burner tilt, etc. | 24 | Nos. | 6,500 ₹1.6 L | 6,000 ₹1.4 L |
| 5.00 | Removing the oil nozzle tip with reach rod from furnace side after removing the fixing pins, overhauling of nozzle tip and linkages, checking the holes, lubrication of pins, re-fixing of oil nozzle and checking the clearance with wind box. | 12 | Nos. | 4,300 ₹51,600 | 3,820 ₹45,840 |
| 6.00 | Charges for cutting and removal of worn-out/damaged fasteners in burner corners 1 to 4 in the boiler. | 200 | Nos. | 38 ₹7,600 | 35 ₹7,000 |
| 7.00 | Fixing of 1 No new bolt & nut in inner and outer cover plates of burner corners | 200 | Nos. | 40 ₹8,000 | 36 ₹7,200 |
| 8.00 | Non-metallic Compressed Asbestos Fibre joining sheet – 2000mm x 1500mm x 3 mm Make:- Champion / Klinger / Spitmaan / Ferolite with material/manufacturer test certificateMax. Temp:- 350° C, Max. Pr.:- 25 kg/cm2. Gr.:- W/3, IS No:- IS 2712/1998, Colour- Red | 200 | kgs | 150 ₹30,000 | 132 ₹26,400 |
| 9.00 | Foam seal sealer 30-45 (Dum Dum Paste).Hy seal 30-45 Dum Dum putty with material/manufacturer test certificate | 75 | kgs | 400 ₹30,000 | 320 ₹24,000 |
| 10.00 | Cutting gas | 0.5 | set | 4,300 ₹2,150 | 4,000 ₹2,000 |
Tender Value
Refer Docs
EMD Value
₹4,200
Closing Date
28 Apr 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit III Boiler Pressure parts Maintenance of Burners and replacement of worn out fasteners at cover plates
2025_EB_551492_1
SE / P and A / SE / M-I / MTPS-I / BM / OT. 24 / 2025-26
Open Tender
Power/Energy Projects/Products
7 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹4,200
Yes
26 May 2026
26 Apr 2025
29 Apr 2025
26 Apr 2025
28 Apr 2025
26 Apr 2025
Amount
OVERHAULING OF BURNERS: Removing inner and outer panel door, releasing all reach rods from burner tilt mechanism, dismantling of direct and indirect burner tilt mechanism components for inspection
Inspection, cleaning, rectification and alignment of burner tilt mechanism components like bell crank clevis and drive lever, reassembling after fixing of coal nozzles, etc., with proper lubricants and connecting all reach rods with burner tilt mechanism including fixing of inner panel, outer panel doors (Asbestos tape gaskets and special lubricants will be supplied by board).
Dismantling of old nozzle assembly from its compartment, cleaning and preparing the coal compartment for re-fixing of new coal nozzle
Checking of new coal nozzles and tips for proper aligning of coal nozzles, checking the clearance, rectification if any, fixing of new coal nozzle assembly inside the coal compartment in position and checking the clearance, checking the burner tilt, etc.
Removing the oil nozzle tip with reach rod from furnace side after removing the fixing pins, overhauling of nozzle tip and linkages, checking the holes, lubrication of pins, re-fixing of oil nozzle and checking the clearance with wind box.
Charges for cutting and removal of worn-out/damaged fasteners in burner corners 1 to 4 in the boiler.
Fixing of 1 No new bolt & nut in inner and outer cover plates of burner corners
Non-metallic Compressed Asbestos Fibre joining sheet – 2000mm x 1500mm x 3 mm Make:- Champion / Klinger / Spitmaan / Ferolite with material/manufacturer test certificateMax. Temp:- 350° C, Max. Pr.:- 25 kg/cm2. Gr.:- W/3, IS No:- IS 2712/1998, Colour- Red
Foam seal sealer 30-45 (Dum Dum Paste).Hy seal 30-45 Dum Dum putty with material/manufacturer test certificate
Cutting gas
T & Ps and consumables
SKSCONTRACTOR (BID ID -1322521)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_658312.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid