| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹10.3 CrAccepted-AOC | L-1 | Accepted-AOC Awarded for being L-1 bidder as per approved TC recommendation | |
| 2 | L-2₹10.5 Cr+₹19.0 L (1.84%)Rejected-Finance 2 9 SUNITY CHATTERJEE PATH CITY CENTRE DURGAPUR 713216 | DURGAPUR | BURDWAN | WEST BENGAL | 713216 | L-2 | Rejected-Finance Rejected for not being L-1 bidder as per approved TCR | |
| 3 | L-3₹11.1 Cr+₹79.0 L (7.66%)Rejected-Finance 504 5TH FLOOR SAI PLAZA 89 AJC BOSE ROAD KOLKATA 700014 | KOLKATA | KOLKATA | WEST BENGAL | 700014 | L-3 | Rejected-Finance Rejected for not being L-1 bidder as per approved TCR | |
| 4 | L-4₹11.3 Cr+₹95.2 L (9.23%)Rejected-Finance | L-4 | Rejected-Finance Rejected for not being L-1 bidder as per approved TCR | |
| 5 | L-5₹11.3 Cr+₹1.0 Cr (10.1%)Rejected-Finance | L-5 | Rejected-Finance Rejected for not being L-1 bidder as per approved TCR |
Tender Value
₹13.4 Cr
EMD Value
₹16.7 L
Closing Date
21 Apr 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER CIVIL HOD TAD ECL HQ
OFFICE OF GM CIVIL HOD TAD ECL HQ SANCTORIA PO DISHERGARH DIST PASCHIM BURDWAN PIN 713333
Construction of 48 units Executive Hostel at Dishergarh Club premises in Jhalbagan ECL HQ
2025_ECL_333571_1
ECL/HQ/TAD/e-tENDER/24-25/28 DATED 29.03.2025
Open Tender
Civil Works - Buildings
Percentage
540 days
JHALBAGAN SANCTORIA
Please refer Tender documents.
5 documents required · 5 mandatory
₹16.7 L
21 Aug 2025
29 Mar 2025
23 Apr 2025
29 Mar 2025
21 Apr 2025
30 Mar 2025
29 Mar 2025 - 14 Apr 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART A: Civil Works (Structure, water supply, sanitary fittings etc. ) | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 4,884.3 | cum | 129.5 | ₹6,32,516.85 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 3,807.79 | cum | 1,088.6 | ₹41,45,160.19 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 357.52 | cum | 5,212 | ₹18,63,394.24 |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. | 2,056.22 | cum | 7,713.5 | ₹1,58,60,652.97 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 210.87 | sqm | 294.9 | ₹62,185.56 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 4,381.94 | sqm | 694.45 | ₹30,43,038.23 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Shelves (Cast in situ) | 203.72 | sqm | 694.45 | ₹1,41,473.35 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 3,596.12 | sqm | 550.7 | ₹19,80,383.28 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 2,720.19 | sqm | 720.55 | ₹19,60,032.9 |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
BOQ_345779.xls
BOQ • 0.41 MB
167133757.pdf
Tender Documents • 2.03 MB
167133758.pdf
Tender Documents • 1.15 MB
167133759.pdf
Tender Documents • 0.57 MB
167133761.html
Tender Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .