Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance AT KURPANIA PO SANDAY BAZAR DISTT BOKARO JHARKHAND 829127 | BOKARO | BOKARO | JHARKHAND | 829127 | -45.00% | ₹1.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.4 L+₹6,369.03 (4.69%)Admitted-Fee/PreQual/Technical/Finance | -42.42% | ₹1.4 L+₹6,369.03 (4.69%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.1 L+₹72,700.67 (53.5%)Admitted-Fee/PreQual/Technical/Finance JHARHI BHATGAON PO BHATGAON DIST SURAJPUR C G PIN 497235 | BHATGAON | SURAJPUR | CHHATTISGARH | 497235 | -15.55% | ₹2.1 L+₹72,700.67 (53.5%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹3,700
Closing Date
14 Aug 2026, 4:00 pmClosed
P E (Civil) AKKOCP, BnK Area
P E (Civil) AKKOCP, BnK Area PO. Sunday Bazar, Bokaro Jharkhand PIN -829127
Making of 03 nos. Silt settling tank with two 02 nos. chambers at workshop AKKOCP under AKK OCP, BnK Area
2026_CCL_362801_1
PE(C)/AKKOCP/E -Tender/26-27/03, dt 30.07.2026
Open Tender
Civil Works - Others
Percentage
30 days
AKKOCP
As per NIT
3 documents required · 3 mandatory
₹3,700
17 Aug 2026
30 Jul 2026
15 Aug 2026
31 Jul 2026
14 Aug 2026
31 Jul 2026
31 Jul 2026 - 4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 1 | cum | 1,464.6 | ₹1,463.14 |
| 2 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock | - | cum | 392.85 | - |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | 1,438.1 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | 6,480.4 | ₹6,473.92 |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 5.0 in foundation and plinth in:Cement mortar 1:6(1 cement :6 coarse sand) | - | cum | 6,770.05 | - |
| 6 | 12 mm cement plaster of mix:1:6(1 cement: 6 fine sand) | 1 | sqm | 230.6 | ₹230.37 |
| 7 | Neat cement punning | 1 | sqm | 58.95 | ₹58.89 |
| 8 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 110 mm diameter | - | Meter | 338.5 | - |
| 9 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.02 MB
finance_375709.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.16 MB
BOQ_375709.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .