Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | -8.79% | ₹1.8 L | L1 | Admitted-Finance |
| 2 | L2₹1.9 LAdmitted-Finance | -0.30% | ₹1.9 L | L2 | Admitted-Finance |
| 3 | L3₹1.9 LAdmitted-Finance | -0.10% | ₹1.9 L | L3 | Admitted-Finance |
| 4 | L4₹1.9 LAdmitted-Finance | -0.05% | ₹1.9 L | L4 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
27 Feb 2026, 6:00 pmClosed
Executive Engineer REW Jammu
Executive Engineer REW Jammu
Construction of drain near the house of shri Tarsem Singh Ward No 6 Pyt Dherian Block Khour, Distt Jammu Under the head CAPEX Budget PRI PLAN for the year of 2025-26.Pyt. Level
2026_RDPR_304183_1
e-NIT No. 859- REWJ of 2025-26 dated 21-02-2026
Open Tender
Civil Works
Executive Engineer REW Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
MH 0515
₹3,880
Yes
7 Mar 2026
21 Feb 2026
28 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kind of soil
P/L in position Cement conc. 1 cement:5fine sand:10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level.
P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level.
Reinforced cement concrete including curing but excluding the cost of centering,shuttering and reinforcement withl 1:1.5:3 (1 Cement:1.5 Coarse sand:3 Graded stone aggregate 20mm nominal size)
Steel Reinforcement for RCC Work including straightening,cutting,bending, placing in position and binding all complete above plinth level . Cold twisted bars
Centring & shuttering including strutting, propping etc. and removal of the formwork.
Suspended floor
Edges of slab below 20 cm wide
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20 mm nominal size stone aggregate.
carriage of sand 06 KM by MT
carriage of Aggregate 7 km
ADD COST OF SIGN BOARD=
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_988090.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_988090.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid