| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.9 LAccepted-AOC 1301 3 SHASTRI NAGAR MEERUT U P 250004 | MEERUT | UTTAR PRADESH | 250004 | ₹4.9 L | 1 | Accepted-AOC lowest bidder |
| 2 | 2₹5.1 LRejected-Finance P O PURUWALA TEHSIL PAONTA SAHIB DISTT SIRMOUR 173025 H P | PAONTA SAHIB | SIRMOUR | HIMACHAL PRADESH | 173025 | ₹5.1 L | 2 | Rejected-Finance L2 |
| 3 | 3₹5.9 LRejected-Finance | ₹5.9 L | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Budh Raj Singh L2 | V.L. ELECTRICALS L1 | KUMAR ENGINEERING WORKS L3 |
|---|---|---|---|---|---|---|
| 1.00O&M of Andhra Power House | ||||||
| 1.01 | Restoration of the existing electrical control panel by Supplying 24v system and and 24v SMPS supply for start/stop operation of two OPU motors, each rated 2 HP, 415 VAC, three-phase. The panel shall be equipped with three-phase contactors New Supply with all required NO/NC auxiliary contacts, overload relays (OLR), and pressure switches required at designated pressure of the panel for high and low cut-off to protect the OPU starters. All wiring as required, terminations, and interlocks shall be completed to ensure reliable operation of the motors. | 1 | Job | 1,00,000 ₹1.2 L | 1,49,800 ₹1.8 L | 1,55,000 ₹1.8 L |
| 1.02 | Supply and installation of a 24 VDC Rexroth solenoid valve for opening and closing the 4/2-way valve is included. The valve shall be mounted, wired, and integrated with the electrical panel, ensuring proper operation. All associated components such as gaskets, fittings, and electrical connections shall be provided and installed as required. | 1 | Job | 1,00,000 ₹1.2 L | 79,850 ₹94,223 | 80,000 ₹94,400 |
| 1.03 | Instllation & Supply of recommneded setup and programming processing and controlling the commands, a PLC or remote I/O controller is recommended at each site. Suitable options include Siemens S7‑1200/1500, Allen-Bradley CompactLogix, or Schneider Modicon (M231) with ethernet support or equiavalent. Each PLC should have digital inputs and outputs for push buttons and panel with Suitable Indications , solenoid valves, pressure switches, and motor starters, built-in Ethernet for communication, and support interlocks, timers, and control logic. The PLCs should be powered with 24 V DC and expandable with remote I/O modules if opening and closing commands shall be enabled over the existing fiber optic cable between both sites. Supply Industrial Ethernet switches shall be installed and configured at both ends to ensure reliable communication. A remote push button shall be provided at the remote site at designated and secure place. for manual closing of the valve, while the main control panel allows full operation of the valve for opening and closing commands. | 1 | Job | 1,00,000 ₹1.2 L | 1,19,000 ₹1.4 L | 1,95,000 ₹2.3 L |
| 1.04 | Comprehensive testing and commissioning shall be carried out for the complete system, including verification of OPU motor start/stop operation, solenoid valve actuation, remote control functionality, interlocks, and pressure switch cut-off actions. The system shall be made fully operational in all respects, and all work shall be completed to the satisfaction of the Engineer-in-Charge. | 1 | Job | 53,000 ₹62,540 | 45,700 ₹53,926 | 48,500 ₹57,230 |
| 1.05 | cleaning of the OPU motor and pump, removing all dust, debris, and foreign material to ensure proper operation. After cleaning, the motor and pump shall be reinstalled in their respective positions, including proper alignment and tightening. All electrical and mechanical connections shall be reverified, including wiring, gaskets, fasteners, and any associated fittings. Any damaged or worn gaskets shall be replaced. The work shall be completed fully in all respects, ensuring that the OPU motor and pump are ready for safe and reliable operation to the satisfaction of the Engineer-in-Charge. | 1 | Job | 80,000 ₹94,400 | 24,900 ₹29,382 | 25,000 ₹29,500 |
Updated dates
Tender Value
₹4.2 L
EMD Value
₹4,200
Closing Date
30 Dec 2025, 10:30 amClosed
RE Andhra
RE Andhra
OandM of Andhra Power House Job1
2025_HPSEB_124270_1
APHD/2025-26-01
Open Tender
Power/Energy Projects/Products
Work
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
₹4,200
Yes
12 Jan 2026
23 Dec 2025
30 Dec 2025
23 Dec 2025
30 Dec 2025
23 Dec 2025
Amount
O&M of Andhra Power House
Restoration of the existing electrical control panel by Supplying 24v system and and 24v SMPS supply for start/stop operation of two OPU motors, each rated 2 HP, 415 VAC, three-phase. The panel shall be equipped with three-phase contactors New Supply with all required NO/NC auxiliary contacts, overload relays (OLR), and pressure switches required at designated pressure of the panel for high and low cut-off to protect the OPU starters. All wiring as required, terminations, and interlocks shall be completed to ensure reliable operation of the motors.
Supply and installation of a 24 VDC Rexroth solenoid valve for opening and closing the 4/2-way valve is included. The valve shall be mounted, wired, and integrated with the electrical panel, ensuring proper operation. All associated components such as gaskets, fittings, and electrical connections shall be provided and installed as required.
Instllation & Supply of recommneded setup and programming processing and controlling the commands, a PLC or remote I/O controller is recommended at each site. Suitable options include Siemens S7‑1200/1500, Allen-Bradley CompactLogix, or Schneider Modicon (M231) with ethernet support or equiavalent. Each PLC should have digital inputs and outputs for push buttons and panel with Suitable Indications , solenoid valves, pressure switches, and motor starters, built-in Ethernet for communication, and support interlocks, timers, and control logic. The PLCs should be powered with 24 V DC and expandable with remote I/O modules if opening and closing commands shall be enabled over the existing fiber optic cable between both sites. Supply Industrial Ethernet switches shall be installed and configured at both ends to ensure reliable communication. A remote push button shall be provided at the remote site at designated and secure place. for manual closing of the valve, while the main control panel allows full operation of the valve for opening and closing commands.
Comprehensive testing and commissioning shall be carried out for the complete system, including verification of OPU motor start/stop operation, solenoid valve actuation, remote control functionality, interlocks, and pressure switch cut-off actions. The system shall be made fully operational in all respects, and all work shall be completed to the satisfaction of the Engineer-in-Charge.
cleaning of the OPU motor and pump, removing all dust, debris, and foreign material to ensure proper operation. After cleaning, the motor and pump shall be reinstalled in their respective positions, including proper alignment and tightening. All electrical and mechanical connections shall be reverified, including wiring, gaskets, fasteners, and any associated fittings. Any damaged or worn gaskets shall be replaced. The work shall be completed fully in all respects, ensuring that the OPU motor and pump are ready for safe and reliable operation to the satisfaction of the Engineer-in-Charge.
Budh Raj Singh (BID ID -602491)
KUMAR ENGINEERING WORKS (BID ID -602594)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf