Loading…
Loading…
Tender Value
₹16.7 L
EMD Value
₹1.7 L
Closing Date
23 Jun 2026, 12:00 pmClosed
EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION AGRA
OFFICE OF EE MI AGRA BAROLI AHEER AGRA
GRAM PIPRAITHA BLOCK JAGNER DISTT AGRA MAIN KIVAAD NADI PAR PIRAITHA CHEKDAM KA NIRMAAN KARY
2026_UPMID_1153610_1
E-TENDER NO-02 CHECKDAM
Open Tender
Civil Works - Others
Percentage
90 days
JAGNER
AS PER TENDER NOTICE
2 documents required · 2 mandatory
₹854
EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION AGRA
₹1.7 L
Yes
OFFICE OF EE MI AGRA
9 Jul 2026
28 May 2026
23 Jun 2026
28 May 2026
23 Jun 2026
28 May 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1EARTH WORK IN EXCAVATION IN FOUNDATION OF CHECKDAM | |||||
| 1.01 | EARTH WORK IN EXCAVATION IN FOUNDATION OF CHECKDAM SITE UP TO 1.50 M DEPTH AND LEAD UP TO 200 M | 162.46 | m³ | 105 | ₹17,058.3 |
| 1.02 | EARTH WORK IN EXCAVATION BELOW 1.50M DEPTH | 99.35 | m³ | 105 | ₹10,431.75 |
| 1.03 | REMOVAL OF SLUSH FROM BED OF NALA AND WING WALL WITH 2 LEAD AND 1 LIFT UP TO GROUND HEIGHT FOR EVERY 0.30 M LIFT OR PART THERE OF | 36.39 | m³ | 105 | ₹3,820.95 |
| 1.04 | EARTH WORK IN EXCAVATION IN WET SOIL IN FOUNDATION OF CREST WING WALL CUT OF WALL APRON AND FLOOR IN UP AND DOWN STREAM WITH 2 LEAD AND 5 LIFT OF UP TO GROUND HEIGHT FOR EVERY 0.30 M LIFT OR PART THERE OF | 106.84 | m³ | 105 | ₹11,218.2 |
| 2CONSTRUCTION OF CHECK DAM (PUCCA WORK) | |||||
| 2.01 | PLAIN CEMENT CONCRETE IN 1:3:6 CEMENT COURSE SAND AND 40mm STONE BALLAST IN FOUNDATION OF WING WALL CREST FLOORS CUT OFF WALL ETC. INCLUDING SUPPLY OF MATERIAL AND LABOUR T&P ETC. REQUIRED FOR PROPER COMPLETION OF THE WORK | 68.77 | m³ | 6,203.03 | ₹4,26,582.37 |
| 2.02 | RENDUM RUBBLE / KHANDA MASONARY WITH 1:4 CEMENT COURSE SAND MORTAR UP TO BED LEVEL WITH 20X20X20 SIZE KHANDA IN WING WALLS, CREST WALL, PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL LABOUR AND T&P REQUIRES FOR PROPER COMPLETION OF WORK | 56.58 | m³ | 5,578.56 | ₹3,15,634.92 |
| 2.03 | RENDUM RUBBLE / KHANDA MASONARY IN SUPER STRUCTURE WITH 1:4 CEMENT COURSE SAND MORTAR WITH 20X20X20 TO 25X25X25 SIZE KHANDA IN WING WALLS, CREST WALL, PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL LABOUR AND T&P REQUIRES FOR PROPER COMPLETION OF WORK | 79.06 | m³ | 5,902.32 | ₹4,66,637.42 |
| 2.04 | CEMENT CONCRETE WORK IN 1:2:4 WITH CEMENT COURSE SAND AND 20MM STONE BALLAST OVER SURFACE OF FLOOR WING WALL AND CREST WALL INCLUDING COST OF MATERIAL LABOUR AND T&P ETC | 13.45 | m³ | 6,720.68 | ₹90,393.15 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.26 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.22 MB
BOQ_2161090.xls
BOQ • 0.30 MB
CD_DATE_E.pdf
PDF • 0.33 MB
cd_date.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .