Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically Qualified |
| 2 | Accepted-Technical BHANSHAN CHOLA PUR VARANASI | VARANASI | UTTAR PRADESH | 221001 | Accepted-Technical Technically Qualified |
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
1 Jun 2026, 2:30 pmClosed
E.E (HQ)
JALKAL VIBHAG NAGAR NIGAM
Laying Of Sewer Line Through Trenchless Method From Mukund Gas Godown To Assi Secondary Interceptor Including Desilting Of Assi Secondary Interceptor
2026_NNVAR_1144427_10
125/II/E.E(HQ)/J.K.N.N/26-27 DATE - 30-04-2026
Open Tender
Water Supply
Percentage
120 days
JALKAL VIBHAG VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
GM JALKAL
₹2.4 L
Yes
9 Jun 2026
27 May 2026
1 Jun 2026
27 May 2026
1 Jun 2026
27 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying Of Sewer Line Through Trenchless Method From Mukund Gas Godown To Assi Secondary Interceptor Including Desilting Of Assi Secondary Interceptor. | |||||
| 1.01 | RCC work with cement, coarse sand and 20 mm gauge approved stone ballast in proporation of 1:1:5:3 in columns excluding supply of reinforcement and its bending but including its fixing and binding the same with 0.50 m thick binding wire ( to be supplied by the contractor) including neessary centering and shuttering, supply of all materails, labour t&p etc. required for porper completion of the work.
a) footing | 1 | cum | - | - |
| 1.02 | b) base | - | cum | - | - |
| 1.03 | c) wall | - | cum | - | - |
| 1.04 | d) weir | - | cum | - | - |
| 1.05 | MS WORK
Mild steel of iron work in plain work such as R.C.C when not included in overall rates, brought to required shape, as necessary including supply of steel and wastage, straightening, cutting and bending, all complete for proper connection of work. | - | qtl | - | - |
| 1.06 | FOOTING
Longitudinal bars 16 Q - 200 C/C at top & bottom | 1 | kg | 1 | ₹1 |
| 1.07 | Distribution bars 16 Q - 200 C/C at top & bottom | 1 | kg | 1 | ₹1 |
| 1.08 | BASE
Longitudinal bars 10 Q - 200 C/C | 1 | kg | 1 | ₹1 |
| 1.09 | Distribution bars 10 Q - 200 C/C | 1 | kg | 1 | ₹1 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_2162753.xls
BOQ • 0.29 MB
TC.pdf
Tender Documents • 3.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .