| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.7 Craccepted-aoc | ₹1.7 Cr | accepted-aoc |
Tender Value
₹1.6 Cr
EMD Value
₹2.4 L
Closing Date
23 Jan 2026, 10:30 pmClosed
Public Works Department
IMPROVEMENTS TO NSF COLLAGE SIDE ROAD TO SHEIK ZAKRIYA MASJID IN GOKAK TOWN OF GOKAK TALUKA OF BELAGAVI DISTRICT (SATISH NAGAR ROAD UNDER 5054-04-337-0-01-154 MDR ROAD IMPROVEMENTS FOR 2025-26
252592
PWD/2025-26/RD/WORK_INDENT30501
Open
Roads
PWD Division Office Chikkodi
10 documents required · 10 mandatory
Satisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work such as Improvements of Road of value not less than Rs. 80.52 Lakhs
To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2020-21,2021-22,2022-23,2023-24 & 2024-25 (c) executed in any one year, the following minimum quantities of work 1)Excavation/subgrade/Embakment-1401.00 CUM,2)GSB-412.00CUM,3)Metalling(WMM/WBM)-512.00CUM,4)Asphalting(BM/SDBC/DBM/BC)-256.00 CUM&5)Concrete(PCC/RCC/PQC/DLC)-422.00 CUM.
Tenderers who meet the above specified minimum qualifying criteria will only be qualified,if their available tender capacity is more than the total tender value.The available tender capacity will be calculated as under Assessed available tender capacity is AXNX1.5-B where where A is Maximum value of civil engineering works executed in any one year during the last five years updated to 2025-26 price level taking into account the completed as well as works in progress.N is Number of years prescribed for completion of the works for which tenders are invited is 0.5 Year B is Value at 2025-26 price level, of existing commitments and on-going works to be completed during the next 0.5 year Period of completion of the works for which tenders are invited.
Maximum of Civil Engineering works executed in any one year during the last five years (updated to 2025-26 price level) taking into account the completed as well as works in progress. (Financial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2025-26)
Value at 2025-26 price level, of existing commitments and on-going works to be executed during the next 12 months(Financial commitment of previous years shall be given a weight of 10% per year to bring them to the price level of the 2025-26), (Monthwise commitment shall be furnished)
Each tenderer should demonstrate availability of few key equipments/machinery for execution of the work.However as per Govt circular No.GO FD/AE 263/EXP12-2022 dt 11-05-2022,this clause for owning key equipments for works costing upto Rs.3.00 crores is exempted. However it is obligatory for the contractor to use the following machineries for various activities involved in construction as per MORTH specification 1)Excavator like JCB/Hitachi etc.2)Tippers,3)Road Roller/PRR Roller(Vibrator),4)Hot Mix Plant (minimum capacity40-60 TPH),5)Paver Finisher,6)Vehicle Mounted (tank) Mechanical Sprayer,7)Pug Mill (Suitable Capacity)
To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. 2020-21,2021-22,2022-23,2023-24 & 2024-25 (a) acheived in at least two financial years a minimum financial turnover of Rs. 322.09 lakhs (in all classes of civil engineering construction works only)( Calculated as per Govt circular PWD.60.CRM.2021 Dated.08/11/2021)
Liquid Assets and or availability of credit facilities of no less than Rs. 80.52 Lakhs (Credit Lines or letter of credit or certificates from the banks for meeting the fund requirement etc
Report on the financial standing of the Tenderer, such as profit and loss statements and auditors report for the last five years.
The EMD of Rs.2,42,000.00 shall be paid in full through e payment or in two parts i.e. part (1) Rs.1,00,000.00 br e payment Part (2) Rs.1,42,000.00 EMD shall be in the form Bank Guarantee in the prescribed format obtained from any Nationalised / Scheduled Bank in favour of Executive Engineer, PWD Division, Chikodi payable at Chikodi
Constitutional or Legal Status of the Tenderer
Information on litigation in which the Tenderer is involved:
Name, Address, telephone No., Fax No., and email ID of the Tenderers Bankers
Principal Place of Business
Information on works which are yet to be completed
Information of the works for which Tender acceptance letters are received.
Information of the works for which Tenderer has submitted Tender
Assessed Tender Capacity shall be more than the Tendered Amount
₹4,030
₹2.4 L
23 Jan 2026
7 Jan 2026
27 Jan 2026
21 Jan 2026
19 Jan 2026
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. Ref to MoRT&H : IRC - 3...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Granular Sub-Base - By Mix in Place Method - Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared sur...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Prime Coat over WMM/WBM - Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying ...
Tack coat on Granular surface treated with primer - Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. R...
Bituminous Macadam Grading - II for traffic <20 MSA - Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading prem...
Semi Dense Bituminous Concrete - Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading pre...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Kerb Stones - Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer i...
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface - Providing and laying of hot applied thermoplastic compound 2.5 mm thick including ref...
Supplying and Fixing of Molded Shank Raised Pavement Markers / Cats Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total int...
Direction and Place Identification Signs upto 0.9 m2 Size Board. - Providing and erecting direction and place identification retro- reflectorised sign as per IRC:67:2022 made of high intensity...
Precast Cement Concrete Interlocking Blocks - Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Tra...
Pedestrian Crossings as per IRC 99-2018 - Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of...
Cable Duct Across the Road - Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of sl...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV ret...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV ret...
Providing & fixing Polymer rubberised factory made Black & Yellow coloured Speed retarders/Breakers with width 350mm & Height 50mm as per IRC 99:2018 with load carrying capacity upto 30t in lo...
Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest
amendments and conveying to worksite, rolling and lowering into
trenches, laying true to line and level and perfect linking at joi...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the fu...
ELECTRICAL POLE SHIFTTING ESTIMATE
PART A - SHIFTING of 400SQMM XLPE CableRoute and joint indicating stones, As per-Material cost
---- including cost of all materials, labor ,HOM,l
PART A - SHIFTING of 400SQMM XLPE Cable-R & R Laying of cable in trench,
---- including cost of all materials, labor ,HOM,l
PART A - SHIFTING of 400SQMM XLPE CableLabour charges for horizontal drilling with Normail Soil 5/6" bore size-Cost of Labour charges
---- including cost of all materials, labor ,HOM,l
PART A - SHIFTING of 400SQMM XLPE Cable-Making of cable terminations-Cost of Labour charges
---- including cost of all materials, labor ,HOM,l
PART A - SHIFTING of 400SQMM XLPE Cable-Laying of Route and Joint stones-Cost of Labour charges
---- including cost of all materials, labor ,HOM,l
PART B - SHIFTING of RMU-Foundation with CC 1:2:4 [M-15] Using 20mm Nominal size graded crushed coarse aggregates -Material cost
---- including cost of all materials, labor ,HOM,l
PART B - SHIFTING of RMU- Providing Reinforecement TMT Fe 550/550 D-Material cost
---- including cost of all materials, labor ,HOM,l
PART B - SHIFTING of RMU-Supplying of Frame of MS Channel 100x50 mm and MS angle 40x40x5 mm welding etc., complete.
---- including cost of all materials, labor ,HOM,l
PART B - SHIFTING of RMU-Rod type earthing with 40 mm Dia, 3 Mtr long MS rod as per specification & drawing including digging of pit & fixing
---- including cost of all materials, la...
PART B - SHIFTING of RMU-Lettering the RMU with enamel paint and also writing single line diagram of each panel, caution Board, Danger Board etc., including cost of Paint, Brush etc.,
---- including...
PART B - SHIFTING of RMU-Eath Excavation for R.M.U Foundation depositing of earth on bank up to a lead of 50 mtrs and with a lift up to 1.5 mtrs-Cost of Labour charges ---- including cost of all mater...
PART B - SHIFTING of RMU-Labour charges for fixing Foundation frame of MS channel 100X50 mm and MS angle 40x40x5 mm welding, fixing in concrete, aligning the RMU on foundation bed, assembly of units, ...
PART A - SHIFTING of 95 SQMM XLPE Cable-Cable covering tiles 250X125X40 mm,-Material cost
---- including cost of all materials, labor ,HOM,l
PART A - SHIFTING of 95 SQMM XLPE Cable-Sand-Material cost
---- including cost of all materials, labor ,HOM,l
PART A - SHIFTING of 95 SQMM XLPE Cable-Cable trench excavation, Ordinary soil ,-Cost of Labour charges
---- including cost of all materials, labor ,HOM,l
PART A - SHIFTING of 95 SQMM XLPE Cable-Laying of cable in trench, -Cost of Labour charges
---- including cost of all materials, labor ,HOM,l
PART A - SHIFTING of 95 SQMM XLPE Cable-Refilling and consolidation,-Cost of Labour charges
---- including cost of all materials, labor ,HOM,l
PART A - SHIFTING of 95 SQMM XLPE Cable-Covering the cable with tiles. -Cost of Labour charges
---- including cost of all materials, labor ,HOM,l
PART A - SHIFTING of 95 SQMM XLPE Cable-Spreading and forming with Sand round the cable,-Cost of Labour charges
---- including cost of all materials, labor ,HOM,l
PART C - Erection of Double Pole DTC with 3GOS-Pre - Stressed Tubular Spun Pole 11 Mtr Long - 500Kg
WL (Dwg No. BESCOM/GM/QS&S/45 Dtd 24.11.2018 )as per IS-13158:1991
,(As per HESCOM SR 2023-24. Page ...
PART C - Erection of Double Pole DTC with 3GOS-Pre - Stressed Tubular Spun Pole 11 Mtr Long - 500Kg
WL (Dwg No. BESCOM/GM/QS&S/45 Dtd 24.11.2018 )as per IS-13158:1991
,(As per HESCOM SR 2023-24. Page ...
Concreting materials for 11 Mtrs Spun Pole
a) Base concreting 1:2:4, 1000x1000x150 mm,( Labour Charges RS 963-Labour
---- including cost of all materials, labor ,HOM,l
b) Pole concreting 1:2:4, 1000x1000x2500 mm, ( Labour Charges RS 15608.00-Labour
---- including cost of all materials, labor ,HOM,l
c) Coping 1:2:4 (as per actuals), ( Labour Charges RS 15608.00 -Labour
---- including cost of all materials, labor ,HOM,l
PART C - Erection of Double Pole DTC with 3GOS-Single Pole Transformer Structure Kit with Three H Frames without tranformer seating and seating Angle support cross arm for 63/100/250/500
kVA (UG Cabl...
PART C - Erection of Double Pole DTC with 3GOS-Single Pole Transformer Structure Kit with Three H Frames without tranformer seating and seating Angle support cross arm for 63/100/250/500
kVA (UG Cabl...
PART C - Erection of Double Pole DTC with 3GOS-Releasing and Re-fixing of Existing 100KVA Distribution Transformer, (Labour Charges RS 1590*1.90=3021.00 -Labour
---- including cost of all materials,...
PART C - Erection of Double Pole DTC with 3GOS-11KV Horizontal 'X' arm with HTS, clamps B&N, complete, (As per HESCOM SR 2023-24. Page No 341 Sl No.9, RS 643.00, Labour Charges RS 272-Material ---- in...
PART C - Erection of Double Pole DTC with 3GOS-11KV Horizontal 'X' arm with HTS, clamps B&N, complete, (As per HESCOM SR 2023-24. Page No 341 Sl No.9, RS 643.00, Labour Charges RS 272-Labour
PART C - Erection of Double Pole DTC with 3GOS-HT Single Top Support with bolts nuts & Washers , (As per HESCOM SR 2023-24. Page No 343 Sl No.20, RS 140.00, Labour Charges RS 112
PART C - Erection of Double Pole DTC with 3GOS-HT Single Top Support with bolts nuts & Washers , (As per HESCOM SR 2023-24. Page No 343 Sl No.20, RS 140.00, Labour Charges RS 112-Labour
PART C - Erection of Double Pole DTC with 3GOS-Rabbit ACSR Conductor with 1.5% sag , (As per HESCOM SR 2023-24. Page No 359 Sl No. 59, I No 7.02 RS 58573.00, Labour Charges RS 4361.00-Material
PART C - Erection of Double Pole DTC with 3GOS-Rabbit ACSR Conductor with 1.5% sag , (As per HESCOM SR 2023-24. Page No 359 Sl No. 59, I No 7.02 RS 58573.00, Labour Charges RS 4361.00-Labour
PART C - Erection of Double Pole DTC with 3GOS-11KV Polymer Pin Insulator,-Material
---- including cost of all materials, labor ,HOM,l
PART C - Erection of Double Pole DTC with 3GOS-Earthing materials pipe type for grounding,(As per HESCOM SR 2023-24. Page No 344 Sl No.25(a), RS 1729.00, Labour Charges RS 949-Material
---- includin...
PART C - Erection of Double Pole DTC with 3GOS-Earthing materials pipe type for grounding,(As per HESCOM SR 2023-24. Page No 344 Sl No.25(a), RS 1729.00, Labour Charges RS 949 -Labour
---- includin...
PART C - Erection of Double Pole DTC with 3GOS-Anti Climbing Device (12 Mtr GI Barbed Wire),(As per HESCOM SR 2023-24. Page No 348 Sl No. 29, I No 4.03, RS 89.00, Labour Charges RS 42.00-Material
PART C - Erection of Double Pole DTC with 3GOS-Anti Climbing Device (12 Mtr GI Barbed Wire),(As per HESCOM SR 2023-24. Page No 348 Sl No. 29, I No 4.03, RS 89.00, Labour Charges RS 42.00-Labour
PART C - Erection of Double Pole DTC with 3GOS-iv) Spacer for DTC Wiring ---- including cost of all materials, labor ,HOM,l
PART C - Erection of Double Pole DTC with 3GOS-b) LT Wiring (From DTC to LT Line via Metering Box & LT Protection Kit) DOUBLE CIRCUIT for 100KVA,( Labour Charges RS 949.00 As per HESCOM SR 2023-24-Lab...
i) Al Lead Wire - 120 Sqmm, As per HESCOM SR 2023-24.
---- including cost of all materials, labor ,HOM,l
ii) Heavy Duty Long Barrel Copper Lug - 120 Sqmm, As per HESCOM SR 2023-24. -Material
---- including cost of all materials, labor ,HOM,l
iii) PG Clamp - Rabbit to 120 Sqmm, As per HESCOM SR 2023-24. -Material
---- including cost of all materials, labor ,HOM,l
iv) Spacer for DTC Wiring, As per HESCOM SR 2023-24-Material
---- including cost of all materials, labor ,HOM,l
v) Fish Plate with necessary Clamps, bolts & nuts etc complete (Galvanised)
---- including cost of all materials, labor ,HOM,l
PART C - Erection of Double Pole DTC with 3GOS-d) LT Electronic Tri-Vector Meter 5 Amps, -
0.5/1.0 Accuracy Class,(As per HESCOM SR 2023-24. Page No 367 Sl No. 399, I No 53.05, RS 3396.00, Labour Char...
PART C - Erection of Double Pole DTC with 3GOS-d) LT Electronic Tri-Vector Meter 5 Amps, -
0.5/1.0 Accuracy Class,(As per HESCOM SR 2023-24. Page No 367 Sl No. 399, I No 53.05, RS 3396.00, Labour Char...
PART C - Erection of Double Pole DTC with 3GOS-LT Distribution Box for 25/63/100/250 kVA DTC with MCCB's (Sheet Metal),(As per HESCOM SR 2023-24. Page No 353 Sl No. 134, I No 18.01, RS 22686.00, Labou...
PART C - Erection of Double Pole DTC with 3GOS-LT Distribution Box for 25/63/100/250 kVA DTC with MCCB's (Sheet Metal),(As per HESCOM SR 2023-24. Page No 353 Sl No. 134, I No 18.01, RS 22686.00, Labou...
PART C - Erection of Double Pole DTC with 3GOS-11 kV, Solid Core Type HG Fuse Unit,(As per HESCOM SR 2023-24. Page No 353 Sl No. 139, I No 20.01, RS 1069.00, Labour Charges RS 237.00 As per HESCOM SR ...
PART C - Erection of Double Pole DTC with 3GOS-11 kV, Solid Core Type HG Fuse Unit,(As per HESCOM SR 2023-24. Page No 353 Sl No. 139, I No 20.01, RS 1069.00, Labour Charges RS 237.00 As per HESCOM SR ...
PART C - Erection of Double Pole DTC with 3GOS-11 kV, 200 Amps, Single Break GOS,(As per HESCOM SR 2023-24. Page No 355 Sl No. 166, I No 24.01, RS 9450.00, Labour Charges RS 1104.00 As per HESCOM SR 2...
PART C - Erection of Double Pole DTC with 3GOS-11 kV, 200 Amps, Single Break GOS,(As per HESCOM SR 2023-24. Page No 355 Sl No. 166, I No 24.01, RS 9450.00, Labour Charges RS 1104.00 As per HESCOM SR 2...
PART C - Erection of Double Pole DTC with 3GOS-R & R DP Structure with RCC pole 9Mtr long,(As per HESCOM SR 2023-24. Page No 339 Sl No.4(a), RS 20928.00, Labour Charges RS 5392 As per HESCOM SR 2023-2...
PART C - Erection of Double Pole DTC with 3GOS-R & R GOS 400Amps Single break
---- including cost of all materials, labor ,HOM,l
PART C - Erection of Double Pole DTC with 3GOS-11 kV, 200 Amps, Single Break GOS,(As per HESCOM SR 2023-24. Page No 355 Sl No. 166, I No 24.01, RS 9450.00, Labour Charges RS 1104.00 As per HESCOM SR 2...
PART C - Erection of Double Pole DTC with 3GOS-R R H Frame for mounting GOS
---- including cost of all materials, labor ,HOM,l
PART C - Erection of Double Pole DTC with 3GOS-R R H Frame for mounting GOS
---- including cost of all materials, labor ,HOM,l
PART D - Shifting of LT Line-R & R R.C.C pole 9 mtr long 200Kg WL, ,(As per HESCOM SR 2023-24. Page No 347 Sl No.1 I No.1.01, RS 7076.00, Labour Charges RS 1113+629=1472 As per HESCOM SR 2023-24.-Labo...
PART D - Shifting of LT Line-R & R P.S.C pole 9 mtr long ,(As per HESCOM SR 2023-24. Page No 347 Sl No.6 I No.1.06, RS 4199.00, Labour Charges RS 1113+629=1472 As per HESCOM SR 2023-24. Page No 388 Sl...
PART D - Shifting of LT Line-R & R P.S.C pole 8 mtr long 145 Kg WL for stud, (As per HESCOM SR 2023-24. Page No 347 Sl No.5 I No.1.05, RS 3699.00, Labour Charges RS 922+503=1425 As per HESCOM SR 2023-...
PART D - Shifting of LT Line-R & R P.S.C pole 8 mtr long 145 Kg WL for stud, (As per HESCOM SR 2023-24. Page No 347 Sl No.5 I No.1.05, RS 3699.00, Labour Charges RS 922+503=1425 As per HESCOM SR 2023-...
PART D - Shifting of LT Line-R & R LT. 4 Pin Cross arms, with pole clamps, bolts, nuts and washers for 9 Mtrs. PSC/RCC Poles, (As per HESCOM SR 2023-24. Page No 342 Sl No.13(a), RS 423.00, Labour Char...
PART D - Shifting of LT Line-R & R LT.2 Pin Cross arms, with pole clamps, bolts, nuts and washers for 8 Mtrs. PSC/RCC Poles, (As per HESCOM SR 2023-24. Page No 342 Sl No.14(c), RS 263.00, Labour Charg...
PART D - Shifting of LT Line-R R Rabbit ACSR Conductor with 1.5% sag
---- including cost of all materials, labor ,HOM,l
PART D - Shifting of LT Line-R R Rabbit ACSR Conductor with 1.5% sag
---- including cost of all materials, labor ,HOM,l
PART D - Shifting of LT Line-Guy Sets, (As per HESCOM SR 2023-24. Page No 344 Sl No.24(c), RS 1138.00, Labour Charges RS 593.00 As per HESCOM SR 2023-24. -Material
---- including cost of all materi...
PART D - Shifting of LT Line-Guy Sets, (As per HESCOM SR 2023-24. Page No 344 Sl No.24(c), RS 1138.00, Labour Charges RS 593.00 As per HESCOM SR 2023-24.- ---- including cost of all materials, labor ,...
PART D - Shifting of LT Line-1.1KV LT AB Cable 3x95+1x70+1*35 Sqmm Sreet light (insulated messenger cum Neutral) (As per HESCOM SR 2023-24. Page No 448 Sl No. 294, I No 42.05 RS 528639.00, Labour Char...
PART D - Shifting of LT Line-Spiral Earth Electrodes, (As per HESCOM SR 2023-24. Page No 348 Sl No.26 I No 2.16 Rs 239, Labour Charges RS 93.00 As per HESCOM SR 2023-24. -Material
---- including co...
PART D - Shifting of LT Line-Spiral Earth Electrodes, (As per HESCOM SR 2023-24. Page No 348 Sl No.26 I No 2.16 Rs 239, Labour Charges RS 93.00 As per HESCOM SR 2023-24. -Labour
---- including cost...
PART E - Decommissioning-PSC Pole - 9 Mtrs Long, 200 kg WL, (Labour Charges RS 1113+629=1472*90% As per HESCOM SR 2023-24. Page No 388 Sl No. 30, I No 2.02 &-Labour Cost
---- including cost of all m...
PART E - Decommissioning-Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (Labour Charges RS 272*90% As per HESCOM SR 2023-24. )-Labour Cost
---- including cost of all materi...
PART E - Decommissioning-DP Structure with RCC Pole - 9 Mtr Long, 145 Kg WL for SDP, (Labour Charges RS 539-Labour Cost2*90% As per HESCOM SR 2023-24. -Labour Cost
---- including cost of all mater...
PART E - Decommissioning-Rabbit ACSR Conductor,(Labour Charges RS 4361*90% As per HESCOM SR 2023-24. -Labour Cost
---- including cost of all materials, labor ,HOM,l
PART E - Decommissioning-a) LT Protection Kit for 100/63/25 kVA, ( Labour Charges RS 949*90% As per HESCOM SR 2023-24. -Labour Cost
---- including cost of all materials, labor ,HOM,l
PART E - Decommissioning-11kV Solid Core Type HG Fuse Unit ( Labour Charges RS 237*90% As per HESCOM SR 2023-24. -Labour Cost
---- including cost of all materials, labor ,HOM,l
PART E - Decommissioning-11KV Class 200Amps Single Break GOS, Labour Charges RS 1104*90% As per HESCOM SR 2023-24. ) -Labour Cost
---- including cost of all materials, labor ,HOM,l
PART E - Decommissioning-i) Al Lead Wire - 120 Sqmm, (As per HESCOM SR 2023-24. -Labour Cost
---- including cost of all materials, labor ,HOM,l
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Circular.pdf
Others - Govt Ltr • 2.53 MB
kw4_bid_document_wi_30501.doc
Tender Document • 3.07 MB
loc format.pdf
Others - Format • 1.73 MB
technical specifications.zip
Others - Specification • 0.27 MB
Royalty Order.pdf
Others - Royalty • 4.03 MB
30501-Milestone.xls
Others - Milestone • 0.39 MB