| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.8 CrAccepted-AOC OLYMPIA PLATINA PLOT NO 33B SOUTH PHASE GUINDY CHENNAI 600032 | CHENNAI | CHENNAI | TAMIL NADU | 600032 | ₹3.8 Cr Quoted ₹4.7 Cr | 1 | Accepted-AOC L1 bidder |
| 2 | 2₹6.1 Cr+₹1.4 Cr (29.2%)Rejected-AOC B 52 CORPORATE HOUSE JUDGES BUNGLOW ROAD BODAKDEV AHMEDABAD GUJARAT 380015 | AHMADABAD | GUJARAT | 380015 | ₹6.1 Cr+₹1.4 Cr (29.2%) | 2 | Rejected-AOC Non L1 bidder |
| Sl No | Description | Qty | Unit | Hitachi Hirel Power Electronics Pvt Ltd L1 | VERTIV ENERGY PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | 2 X 200 kVA, 115V AC, 50 Hz, Single phase Parallel Redundant UPS with bypass for feeding DCS and non DCS loads. The UPS shall consist of –
• AC UPS Panel
• Fault diagnostic unit (FDU)
• Voltage stabilizer in bypass
• Battery rack / stand
• Double pole flame proof battery isolator switch / breaker
• AC distribution board (ACDB)
• Cell booster of adequate rating
• All associated power / communication cables
and all other scope as defined in the MR | 1 | Lumpsum | 1,83,66,000 ₹2,16,71,880 | 1,49,18,000 ₹1,76,03,240 Lowest |
| 1.10 | Lumpsum Price for Nickel Cadmium (Ni-Cd) Battery - 2 X 100% , scope as per material requisition ( MR) | 1 | Lumpsum | 1,81,28,000 ₹2,32,03,840 | 1,42,40,000 ₹1,82,27,200 Lowest |
| 1.20 | Lumpsum Price for Mandatory Spares for for BOQ item no 1.0, scope as per material requisition ( MR) | 1 | Lumpsum | 8,18,000 ₹9,65,240 | 3,60,000 ₹4,24,800 Lowest |
| 1.30 | Lumpsum Price for THIRD PARTY INSPECTION CHARGES for BOQ item no 1.0 | 1 | Lumpsum | - | - |
| 1.40 | Site work, detailed scope as per material requisition ( MR)- Lumpsum price for BOQ item no 1.0 | 1 | Lumpsum | 50,000 ₹59,000 Lowest | 1,00,000 ₹1,18,000 |
| 1.50 | Lumpsum Training requirement for two numbers of Owner’s engineer at manufacturing works for three days for the operation and maintenance of AC UPS and Battery. for BOQ item no 1.0 | 1 | Lumpsum | 25,000 ₹29,500 | 10,000 ₹11,800 Lowest |
| 1.60 | Lumpsum Training charges for two numbers of Owner’s engineer at site for one week for the operation and maintenance AC UPS and battery for BOQ item no 1.0 | 1 | Lumpsum | 30,000 ₹35,400 Lowest | 50,000 ₹59,000 |
| 1.70 | TRANSPORTATION:for BOQ item no 1.0
For Indegenious Bidders : Inland transportation charges by road of all supplies from Vendor’s works / shop to Project site, Numaligarh Refinery, Golaghat, Asaam/ Rail Transportation up to NMGS/Numaligarh Refinery Project Siding. | 1 | Lumpsum | 7,73,500 ₹9,12,730 Lowest | - |
| 1.80 | Lumpsum Cost for extended warranty for 24 months after commissioning or 36 months after dispatch whichever is earlier for BOQ item no 1.0 | 1 | Lumpsum | - | - |
| 2.00 | 2 X 20 kVA, 115V AC, 50 Hz, Single phase Parallel Redundant UPS with bypass for feeding DCS and non DCS loads. The UPS shall consist of –
• AC UPS Panel
• Fault diagnostic unit (FDU)
• Voltage stabilizer in bypass
• Battery rack / stand
• Double pole flame proof battery isolator switch / breaker
• AC distribution board (ACDB)
• Cell booster of adequate rating
• All associated power / communication cables
and all other scope as defined in the MR | 1 | Lumpsum | 54,68,500 ₹64,52,830 | 37,21,000 ₹43,90,780 Lowest |
Tender Value
Refer Docs
Closing Date
19 Sept 2024, 3:00 pmClosed
Krishan Pal Singh
Technip India Limited, Technip Tower,A-4,Sector-1 Noida-201301, India
Design, engineering, procurement, fabrication, inspection, testing, factory acceptance Test (FAT), Packing, transportation and supply of the AC UPS to be installed at Numaligarh Refinery Limited (NRL), Assam as per Material Requisition
2024_NRL_816807_1
TP/0200663C/NRL/1671-0001/1127
Open Tender
Electrical Goods/Equipment
Supply
240 days
Refer tender details
Refer Tender details
6 documents required · 6 mandatory
₹0
Exempted
Online
8 Oct 2025
18 Jul 2024
20 Sept 2024
18 Jul 2024
19 Sept 2024
8 Aug 2024
18 Jul 2024 - 25 Jul 2024
29 Jul 2024
2 X 200 kVA, 115V AC, 50 Hz, Single phase Parallel Redundant UPS with bypass for feeding DCS and non DCS loads. The UPS shall consist of – • AC UPS Panel • Fault diagnostic unit (FDU) • Voltage stabilizer in bypass • Battery rack / stand • Double pole flame proof battery isolator switch / breaker • AC distribution board (ACDB) • Cell booster of adequate rating • All associated power / communication cables and all other scope as defined in the MR
Lumpsum Price for Nickel Cadmium (Ni-Cd) Battery - 2 X 100% , scope as per material requisition ( MR)
Lumpsum Price for Mandatory Spares for for BOQ item no 1.0, scope as per material requisition ( MR)
Lumpsum Price for THIRD PARTY INSPECTION CHARGES for BOQ item no 1.0
Site work, detailed scope as per material requisition ( MR)- Lumpsum price for BOQ item no 1.0
Lumpsum Training requirement for two numbers of Owner’s engineer at manufacturing works for three days for the operation and maintenance of AC UPS and Battery. for BOQ item no 1.0
Lumpsum Training charges for two numbers of Owner’s engineer at site for one week for the operation and maintenance AC UPS and battery for BOQ item no 1.0
TRANSPORTATION:for BOQ item no 1.0 For Indegenious Bidders : Inland transportation charges by road of all supplies from Vendor’s works / shop to Project site, Numaligarh Refinery, Golaghat, Asaam/ Rail Transportation up to NMGS/Numaligarh Refinery Project Siding.
Lumpsum Cost for extended warranty for 24 months after commissioning or 36 months after dispatch whichever is earlier for BOQ item no 1.0
2 X 20 kVA, 115V AC, 50 Hz, Single phase Parallel Redundant UPS with bypass for feeding DCS and non DCS loads. The UPS shall consist of – • AC UPS Panel • Fault diagnostic unit (FDU) • Voltage stabilizer in bypass • Battery rack / stand • Double pole flame proof battery isolator switch / breaker • AC distribution board (ACDB) • Cell booster of adequate rating • All associated power / communication cables and all other scope as defined in the MR
Lumpsum Price for Nickel Cadmium (Ni-Cd) Battery - 2 X 100% , scope as per material requisition ( MR)
Lumpsum Price for Mandatory Spares for for BOQ item no 2.0, scope as per material requisition ( MR)
Lumpsum Price for THIRD PARTY INSPECTION CHARGES for for BOQ item no 2.0
Site work , detailed scope as per material requisition ( MR)- Lumpsum price for BOQ item no 2.0 @
Lumpsum Training requirement for two numbers of Owner’s engineer at manufacturing works for three days for the operation and maintenance of AC UPS and Battery. for BOQ item no 2.0
Lumpsum Training charges for two numbers of Owner’s engineer at site for one week for the operation and maintenance AC UPS and battery for BOQ item no 2.0
TRANSPORTATION: forfor BOQ item no 2.0 For Indegenious Bidders : Inland transportation charges by road of all supplies from Vendor’s works / shop to Project site, Numaligarh Refinery, Golaghat, Asaam/ Rail Transportation up to NMGS/Numaligarh Refinery Project Siding.
Lumpsum Cost for extended warranty for 24 months after commissioning or 36 months after dispatch whichever is earlier for BOQ item no 2.0
Unit rate for Supervision Sevices of erection and commissioning / Performance testing as per details mentioned in material requisition for quoted items as per enclosed instructions to vendor Per Diem charges upto 8 hrs on normal working days. ( BIDDERS TO QUOTE UNIT RATE FOR DIEM CHARGES )
Unit rate for Supervision Sevices of erection and commissioning / Performance testing as per details mentioned in material requisition for quoted items as per enclosed instructions to vendor Overtime rate per hour (beyond normal 8 hours on normal working days). ( BIDDERS TO QUOTE OVER TIME RATE PER HOUR )
Unit rate for Supervision Sevices of erection and commissioning / Performance testing as per details mentioned in material requisition for quoted items as per enclosed instructions to vendor Overtime rate per hour for work on weekly off days / holidays (as applicable to Refinery Site). ( BIDDERS TO QUOTE OVER TIME RATE PER HOUR )
Description of Work / Item(s)
2 years Normal operational & maintenance spares (as per vendor recommendation) for , 2 X 200 kVA details as per BOQ-1, item Sr No 1.00 (Spare no. - 1.01 (Mention the spare name and Qty in unpriced schedule)
Spare no. - 1.02 (Mention the spare name and Qty in unpriced schedule)
Spare no. - 1.03
Spare no. - 1.04
Spare no. - 1.05
Spare no. - 1.06
Spare no. - 1.07
Spare no. - 1.08
Spare no. - 1.09
Spare no. - 1.10
Spare no. - 1.11
Spare no. - 1.12
Spare no. - 1.13
Spare no. - 1.14
Spare no. - 1.15
Spare no. - 1.16
Spare no. - 1.17
Spare no. - 1.18
Spare no. - 1.19
Spare no. - 1.20
2 years Normal operational & maintenance spares (as per vendor recommendation) for ,2 X 20 kVA details as per BOQ-1, item Sr No 2.00 (Spare no. - 2.01 (Mention the spare name and Qty in unpriced schedule)
Spare no. - 2.02 (Mention the spare name and Qty in unpriced schedule)
Spare no. - 2.03
Spare no. - 2.04
Spare no. - 2.05
Spare no. - 2.06
Spare no. - 2.07
Spare no. - 2.08
Spare no. - 2.09
Spare no. - 2.10
Spare no. - 2.11
Spare no. - 2.12
Spare no. - 2.13
Spare no. - 2.14
Spare no. - 2.15
Spare no. - 2.16
Spare no. - 2.17
Spare no. - 2.18
Spare no. - 2.19
Spare no. - 2.20
Description of Work / Item(s)
Addition/ Deletion - MCCB 250 A
Addition/ Deletion - MCCB 400 A
Addition/ Deletion - MCCB 800 A
Addition/ Deletion - MCCB 2000 A
Addition/ Deletion - MCCB 2200 A
Addition/ Deletion - MCCB 2500 A
Addition/ Deletion - MCCB 3000 A
Addition/ Deletion - SFU 16A
Addition/ Deletion - SFU 32A
Addition/ Deletion - SFU 63A
Addition/ Deletion - SFU 100A
Addition/ Deletion - SFU 125A
Addition/ Deletion - SFU 250A
Addition/ Deletion - SFU 300A
Addition/ Deletion - Isolation transformer each rating
Addition/ Deletion - Isolation transformer each rating
Addition/ Deletion - Isolation transformer each rating
Addition/ Deletion - Isolation transformer each rating
Hitachi Hirel Power Electronics Pvt Ltd (BID ID -3078182)
Hitachi Hirel Power Electronics Pvt Ltd (BID ID -3078182)
VERTIV ENERGY PRIVATE LIMITED (BID ID -3082589)
Addition/ Deletion - MCCB 250 A
AC UPS 1U64-SS16-UPS-02
2 years Normal operational & maintenance spares (as per vendor recommendation) for , 2 X 200 kVA details as per BOQ-1, item Sr No 1.00 (Spare no. - 1.01 (Mention the spare name and Qty in unpriced schedule)
Addition/ Deletion - MCCB 2000 A
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .