| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.1 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹24.3 L+₹1.2 L (4.98%)Rejected-Finance HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 175047 | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹25.0 L+₹1.9 L (8.11%)Rejected-Finance | L3 | Rejected-Finance L3 Bidder | |
| 4 | L4₹25.1 L+₹2.0 L (8.56%)Rejected-Finance GOVT CONTRACTOR VILLAGE CHERI P O KIAR KOTI TEHSIL DISTT SHIMLA | L4 | Rejected-Finance L4 Bidder | |
| 5 | L5₹25.2 L+₹2.1 L (9.08%)Rejected-Finance VILL BANOUN PO JABRI TEHSIL DISTT SHIMLA HP | L5 | Rejected-Finance L5 Bidder |
Tender Value
₹32.4 L
EMD Value
₹56,100
Closing Date
27 Jan 2022, 6:00 pmClosed
Executive Engineer
Shimla Rural Division HPPWD Dhami
SH- Formation cutting in KM 1/00 to 1/500 and dumping structure in Km 0/800 and 1/340.
2022_PWD_55773_1
PW-SRDD-CB-CTR-2021-22-15294 dated 07-01-2022
Open Tender
Civil Works - Roads
Item Rate
60 days
Dhami
As per tender documents
12 documents required · 12 mandatory
₹1,500
₹56,100
4 Oct 2024
17 Jan 2022
28 Jan 2022
17 Jan 2022
27 Jan 2022
17 Jan 2022
Amount
Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with in all lead and lift as per Technical Specification Clause 1603.1( one six zero three point one) and MORD specification including carriage of all labour equipment and materials to various location of site through all modes of transportations in all lead, lift and all incidental charges. all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erossions, damage to hill side, water pollutions etc., and to protect stability of hill side rock work shall be executed with chiseling, wedging out rock, where blasting is prohibited). All earth work in excavation including rock excavation shall be carried out true to lines, grades, side slopes, width, camber super elevations and levels as shown on the drawing or as directed by the Engineer-in- Charge. Stacking of materials useful for construction at suitable sites and safe disposal of unserviceable cut materials in specified manners, trimming, filling of unevenness blindages and finishing of the road to specified dimensions as directed by the Engineer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other cases, it shall be removed by the suitable diversion, bailing out or de watering as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of execution shall be the sole responsibility of the contractor, which shall have to be duly compensated by him at his own cost of all cases.
Pick Jumper work
Soft rock
Earthwork in excavation for all type of road structures such as retaining wall, breast wall, culvert, drain and parapets etc. in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiesling / wedging out rocks (where blasting is prohibeted). Dimesions and other particulars as per drawing and Technical Specification Clause 305.1(Three hundred Five point One) including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and its disposal including dressing of sides and bottom and backfilling in trenches with excavated suitable material, trimming, filling of unevenness blindages and finishing of the road to specified dimensions. All work of excavation by blasting shall be carried out by taking all necessary precautions against soil erosions, damage to hill side, water pollutions etc., and to protect stability of hill side rock. Stacking of materials useful for construction at suitable sites and safe disposal of unserviceable excavated materials in specified manners to dumping site (to be arranged by the contractor) or as directed by the Engineer-in-Charge. Any loss to the public or private property during the course of execution shall be the sole responsibility of the contractor, which shall have to be duly compensated by him at his own cost of all cases.
Providing and laying of boulder apron laid in wire crates with 4 mm(four milimeter) dia GI wire conforming to IS:280 (two hudred eighty) and IS:4826(four thousand eight hundred twenty six) in 100 mm x 100 mm(one hundred into one hundred milimeter) mesh (woven diagonally) including 10(ten) per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg (twenty five kilogramme) each as per drawing and technical specifications Clause 1301,(one thousand three hundred one) including carriage of all labour equipment and material to various location through all modes of transportation in all leads lifts and all incidental charges.
SATISH KUMAR
Heera Singh Kaundal
Vikram Thakur
NOKH RAM SHARMA
KULDEEP KUMAR VERMA
GOKAL CHAND THAKUR
Saurabh Thakur
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .