| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAccepted-AOC | ₹5.4 Cr | L1 | Accepted-AOC Accept |
| 2 | L2₹5.6 CrRejected-AOC 402 3RD FLOOR DEV PALACE M G ROAD KARUR 639 001 | KARUR | TAMIL NADU | 639001 | ₹5.6 Cr | L2 | Rejected-AOC Reject |
| 3 | L3₹5.6 CrRejected-AOC NO 123 FIRST STREET URC NAGAR SMALL SENGODAMPALAYAM ERODE DISTRICT 638012 | ERODE | TAMIL NADU | 638012 | ₹5.6 Cr | L3 | Rejected-AOC Reject |
| 4 | Rejected-Technical S 2 PERIYAR NAGAR RAJAGOPALAPURAM PUDUKOTTAI 622003 | PUDUKKOTTAI | TAMIL NADU | 622003 | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | Smart Infratech Developers L3 | M/S SAMRI INFRA DEVELOPERS L2 | VARGEESH CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard speci fication and as directed by the departmental officers.- Upto 2.40m Footing Depth. | 1,440 | M3 | 382 ₹5.5 L | 377 ₹5.4 L | 370 ₹5.3 L |
| 2.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.Upto 2.40m Footing Depth. | 84 | M3 | 207 ₹17,388 | 204 ₹17,136 | 200 ₹16,800 |
| 3.00 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 565 | M3 | 395 ₹2.2 L | 390 ₹2.2 L | 380 ₹2.1 L |
| 4.00 | Supplying and filling in foundation, basement, etc with filling stone dust in layers of not more than 15 cm thick etc. complete complying with standard specification and as directed by the departmental officers. | 3 | M3 | 275 ₹825 | 271 ₹813 | 265 ₹795 |
| 5.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick without consolidation etc. complete complying with standard specification and as directed by the departmental officers. | 1.5 | M3 | 1,770 ₹2,655 | 1,751 ₹2,626.50 | 1,700 ₹2,550 |
| 6.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 68 | M3 | 5,550 ₹3.8 L | 5,496 ₹3.7 L | 5,300 ₹3.6 L |
| 7.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by mechanical means | 50 | M3 | 5,550 ₹2.8 L | 5,496 ₹2.7 L | 5,300 ₹2.6 L |
| 8.00Brick work in Cement Mortar 1:5(one cement,five crushed stone sand) using best quality Burnt Clay Brick of size 8-3/4” x 4-1/4” x 2-3/4” with class designation of 7.5 conforming to IS 1077-1992 including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||
| 8.01 | In Foundation & Basement | 152 | M3 | 6,714 ₹10.2 L | 6,655 ₹10.1 L | 6,450 ₹9.8 L |
| 9.00Brick work in Cement Mortar 1:6(one cement,six crushed stone sand) using best quality Burnt Clay Brick of size 8-3/4” x 4-1/4” x 2-3/4” with class designation of 7.5 conforming to IS 1077-1992 including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||
Tender Value
₹5.4 Cr
EMD Value
₹2.8 L
Closing Date
10 Sept 2025, 11:00 amClosed
Superintending Engineer
Office of the Superintending Engineer, PWD., Buildings Construction and Maintenance Circle, Tirunelveli
Construction of 30 bedded inpatient ward in Government Ayurveda Medical College and Hospital at Kottar, Nagercoil in Kanniyakumari District.
2025_PWD_597779_1
15(1) SE/2025-26 dated 19.08.2025
Open Tender
Civil Works - Buildings
240 days
Kottar
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2.8 L
12 Mar 2026
26 Aug 2025
11 Sept 2025
26 Aug 2025
10 Sept 2025
26 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_714455.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid