Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30,890.23Admitted-Finance | -36.00% | ₹30,890.23 | L1 | Admitted-Finance |
| 2 | L2₹32,289.95+₹1,399.72 (4.53%)Admitted-Finance | -33.10% | ₹32,289.95+₹1,399.72 (4.53%) | L2 | Admitted-Finance |
| 3 | L3₹32,449.23+₹1,559 (5.05%)Admitted-Finance | -32.77% | ₹32,449.23+₹1,559 (5.05%) | L3 | Admitted-Finance |
| 4 | L4₹40,051.12+₹9,160.89 (29.7%)Admitted-Finance | -17.02% | ₹40,051.12+₹9,160.89 (29.7%) | L4 | Admitted-Finance |
| 5 | L5₹40,408.29+₹9,518.06 (30.8%)Admitted-Finance | -16.28% | ₹40,408.29+₹9,518.06 (30.8%) | L5 | Admitted-Finance |
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
12 Aug 2026, 4:30 pmClosed
Er. fayaz Ahmed
cutive engineer REW Ramban
as per nit
2026_RDPR_318566_2
e-Nit 31 of REW Ramban(SBM KHARI)
Open Tender
Civil Works
Percentage
KHARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive engineer REW Ramban
₹12,000
18 Sept 2026
3 Aug 2026
13 Aug 2026
3 Aug 2026
12 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | - | cum | 479.3 | - |
| 2 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone (nallah stones) | - | cum | 2,793.8 | - |
| 3 | R.R stone masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 graded stone aggregate 20 mm nominal size upto plinth level and curing complete with cement mortar 1:6 nallah agg. | - | cum | 5,402.9 | - |
| 4 | Providing and laying in position Reinforced cement concrete including curing but excluding shuttering . All work upto plinth level with:1:2:4 (1 cement :2 coarse sand : 4graded stone aggregate 20 mm nominal size) | 1 | cum | 7,104.35 | ₹7,097.25 |
| 5 | steel reinforcement for RCC work includin cuttin bending | - | kg | 123 | - |
| 6 | centrin and suttering of timber planks | 1 | sqm | 718 | ₹717.28 |
| 7 | Providing and fixing PVC rain water pipe incl joint seal ring 10mm gap socket pipe 75mm dia | - | m | 226.15 | - |
| 8 | Carriage of Sand and agg from source to site by mechanical transport or animal transport or by head load | 1 | cum | 956.7 | ₹955.74 |
| 9 | Carriage of Stones from source to site by mechanical transport or animal transport or by head load | - | cum | 698 | - |
| 10 | cib | - | no | 1,000 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
BOQ_1050561.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .