| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-Finance BUILDING NO 8 RAJEBAHADUR MANSION A D MARG FORT MUMBAI | MUMBAI | MUMBAI CITY | MAHARASHTRA | ₹2.2 Cr | L1 | Accepted-Finance Admitted |
| 2 | L2₹2.2 Cr+₹52,331.77 (0.24%)Accepted-Finance | ₹2.2 Cr+₹52,331.77 (0.24%) | L2 | Accepted-Finance Admitted |
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
24 May 2024, 3:00 pmClosed
Executive Engineer
UWD, Admin Building, UoH, Gachibowli, Hyderabad 046
Maintenance of Buildings Restoration and Renovation of Heritage Building Golden Threshold of University of Hyderabad at Abids, Hyderabad
2024_UoH_805351_1
UH/ENGG/UWD/2024-25/07
Open Tender
Civil Works - Others
Item Rate
210 days
University of Hyderabad, Hyderabad
Please refer as per tender document
7 documents required · 7 mandatory
₹0
₹4.2 L
UWD, UE Office, Admin Building, UoH, Hyderabad
25 Jun 2024
29 Apr 2024
27 May 2024
29 Apr 2024
24 May 2024
29 Apr 2024
29 Apr 2024 - 24 May 2024
8 May 2024
Amount
1) The estimated amount is exclusive of GST. 2) The Bidder should quote basic rates exclusive of GST and quote GST percentage separately. GST should be revised from time to time.
Mandtory:- Monsoon sheds need to be provided fo all weather construction activity (especially roof treatment works). No separate item is included in the BoQ. The rates quoted by the vender is deemed to be inclusive of monsoon sheds.
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, up to 25 meter height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 meter center to center, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. Provision for erection External Steel scaffolding using MS - Cup and Lock system pipe and MS working platform at different level as per the site requirement etc., up to a approximate Height of 10 m to execute the conservation works etc., complete as per the directions of Conservation Engineer.
Providing supply and fixing Spalling Safety nets all around the building each net (or section of it) should have a border rope or bedding of the same quality material as the mesh material. The mesh rope or webbing should be anchored securely to the border at each crossing. The minimum size of the border rope should be 3⁄4-inch diameter. As directed by the engineer in charge
Propping with steel to support the leaned structure (roof and wall) using pipes, channels, angles, girders , wooden wages to prevent further leaning / collapse including labour charges and material charges etc complete. As directed by the engineer in charge
Dismantling old plaster in Lime mortar and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. As per directed by engineer in charge.
Dismantling old plaster in Cement mortar and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. As per directed by engineer in charge.
Cleaning of surface, by initially washing the exterior with soap water (water mixed with approved detergent), and then careful removal of upper coating of old whitewash/paint/distemper/plaster etc. by scrubbing with a wire brush followed by a water rinse to wash off loose material from the stone surface, with necessary access scaffolding etc. complete . for finished item of work. As directed by the engineer in charge
Jack Arch Roof works - entire roof area is divided as per percentage of estimated damage for Complete Jack Arch, Complete Terrace Works which is considered as provisional at 20% of Slab Area, and Repair works or roof repair works are considered at 60% of the total slab area. which shall be computed at the time of removal of deteriorated plaster from terrace and ceiling, level of damage shall be and ascertained detailed recording of the same shall be done by engineer in charge and conservation architect, all terrace work items are subject to measurement. As directed by the engineer in charge Providing and laying flat brick/ Terracotta tiles on roofs grouted with lime mortar 1:2(1 lime: 2 fine sand) mixed with by weight of lime, over 12mm layer of lime mortar 1:2 (1 lime: 2 fine sand)
Removing brick tiles from 5 to 6cm thick lime terrace and relaying an average thickness 7.5cm laid to fall with 25mm nominal size brick aggregate and 50% lime mortar 1:2 (1 Lime putty:2 Surkhi) rammed and finished with gur and belgiri treatment complete and covered with brick tiles of class designation 100 to 50 mm thick red sand stone grouted with lime mortar 1:3(1 Lime: 3 Fine sand) with 5% crude oil by weight of lime over 20mm layer of lime mortar 1:3 (1 lime : 3 fine sand).As directed by the engineer in charge.
Providing & fixing on roof Country clay tile of 6 mm nominal thickness and of approved size and as per approved pattern on PROP frame work complete. As directed by the engineer in charge
Construction of Jack arched roof using Rolled steel joists, fired clay bricks with Kafgi mix recommended by by UNESCO.As directed by the engineer in charge
Removing of damaged I sections which are fixed in lime concrete, including machinery charges for breaking, cutting, lifting of I sections, labour charges, careful stacking of the material etc., complete for finished item of work.(40% of the total jack arch ceiling area, however final measurement’s will be given at the time of execution). As directed by the engineer in charge
Provision for Strengthening the 'I' Section Girder existing supports of jack arch which under gone mild corrosion using MS flat of 50mm(W)x10mm thick with full cutter and welded to a required shape and dimension at Flange and web of the "I" section girder with out causing any damages to the other parts of structure and fixing welded wire mesh of 1" aperture of 20 gauge to the exposed surfaces and applying EPI BOND or NITTO BOND (FOSROC CHEMICALS on two sides and bottom) to achieve the bonding between old MS surface, Mesh fixed to existing I sections beams and Lime mortar before applying the lime plaster without Causing any incidental damage to the structural components of the building as per the directions of Engineer In charge and site requirement and the directions of Conservation Engineer.
Installing new ISMB of 100mm, with anticorrosion coating, (Desired length of the ISMB to be ascertained from the deteriorated I beam, which is removed for repair)
Scraping, and removal of old decayed lime to the ceiling and Attending Plastering wherever necessary of plastering 1st coat 18mm thick in LM(1:11/2) prop, and top finishing with Cebara 3mm thick. including cost and conveyance of all material and labour charges, Scaffolding charges etc., complete for minaret works
MADRAS TERRACE Repair/replacement of the wooden structural framework wherever necessary. (70% new rafters considered, 40% old rafters shall be used in repair).As directed by the engineer in charge.
Removal of cement and foreign material flooring from the roof top, including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. As directed by the engineer in charge.
Removal by layers old & decayed lime concrete on roof terrace bit by bit with chisels and special tools to avoid any disturbance/ damage to the adjoining structure & stacking of refused material/ debris (malba) away from site as directed by the Engineer-in-charge within a dist. of 100 m and lift up to 25m through staircase or chain pully block and scaffolding. (Jack arch and madras terrace roof area ).As directed by the engineer in charge
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. As directed by the engineer incharge
Surface grouting on terrace, Cleaning & Washing of Roof and Make it ready for Scientifically treatment to roof Like using karakaya & jaggary water , Surkhi power, and Slaked lime etc, complete. As directed by the engineer in charge
Lime concrete terracing on roofing of thickness 15cm laid to fall with 25 mm nominal size gauge brick ballast and 50% lime mortar 1:2 (1 lime putty : 2 Surkhi) including ramming / beating and finishing with gur and belgiri treatment including rounding of junctions with parapet etc. complete. As directed by the engineer incharge
Providing and laying Terracota tiles on roofs grouted with lime mortar 1:2(1 lime: 2 fine sand) mixed with 5% crude oil by weight of lime, over 12mm layer of lime mortar 1:2 (1 lime: 2 fine sand) .As directed by the engineer in charge
Dismantling roofing tiles, Tar felt, layer of cement and foreign material, including (rates should be inclusive of temporary shed on roof for all weather activity as and when required) Wooden ridges, hips, valleys and gutters etc., and stacking the material within 50 meters lead .As directed by the engineer in charge.
Carefully dismantling brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. As directed by the engineer in charge.
Providing and applying antifungal wash treatment using 3% solution of sodium pentachloro phenate, of reputed brand and manufacturer, at desired locations as per direction of Engineer-in-charge (The rate is inclusive of all materials & labours involved except scaffolding).As directed by the engineer in charge
Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on wooden frame work complete ( wooden frame work to be paid separately)As directed by the engineer in charge
Flush pointing with Lime mortar 1:1:1 (1 lime : 1surkhi : 1 fine sand) for flat tile bricks on top of mud phaska.As directed by the engineer in charge
Wood Joinery works: Removal of decayed timber sections (only) in the Doors, Windows, Ventilators and restoring the same using well-seasoned (preferably recycled) old timber matching the existing wood in quality, and details, wherever required under direction of Engineer in charge.
Door Shutters
Window
French spirit polishing :Two or more coats on new works including a coat of wood filler. As directed by the engineer in charge
Additional protection of P.U. coat (MRF Make) may be applied on the wood polish surfaces for longer life and durability. As directed by the engineer in charge
Renewing glass panes, with wooden fillets wherever necessary wooded beading: Fluted glass panes of nominal thickness 5 mm (weight not less than 10kg/sqm).As directed by the engineer in charge
Cleaning of Enamel/ Modern/Synthetic Paint with help of suitable chemical. As directed by the engineer in charge. As directed by the engineer in charge
Taking out existing wooden door shutter, repair by cutting, painting etc. and refixing of repaired door shutters to existing door frames, including replacement of hinges with screws, etc. as required, all complete as per the direction of the Engineer-in-charge.
Stone Floor - Careful removal of floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles above 25 mm and up to 40 mm.As directed by the engineer in charge
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).As directed by the engineer in charge.
Supplying and filling in plinth with sand / gravel under floors, including watering, ramming, consolidating and dressing complete. As directed by the engineer in charge.
Making plinth protection 50mm thick 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth
Providing and laying 1:4:8 Plain Cement Concrete mortar for bed works under flooring.
Flooring with leather finished / fine Polished Shahabad or similar natural stone slabs of all sizes between 25mm-40mm thickness in cement mortar (1:3:) at walkable passage; Laying of flooring to be done only after surface preparation which includes cleaning of dust/ mud of scrapped floor surface and wetting it before laying the base mortar. Including and conveyance of all material and labour charges overheads and contractors profit complete for finished item of work.
Flooring with available stone slabs of all sizes between 25mm-40mm thickness in cement mortar (1:3:) at walkable passage; Laying of flooring to be done only after surface preparation which includes cleaning of dust/ mud of scrapped floor surface and wetting it before laying the base mortar. Including and conveyance of all material and labour charges overheads and contractors profit complete for finished item of work. (the stone slabs to be supplied by the department)
Applying 50 mm lime plaster in three coats on the scraped surface washed with lime water and kept wet for two days and Applying to attain uniform surface over uneven scraped surface duly filling the weak pockets in masonry walls in the following sequence (applying to ceiling first and then facade surface). 1. Applying 28 mm of lime mortar (1 lime: 2 sand including Ingredients such as Jaggery liquid, Karakkai liquid and jute fiber). In two or three coats on the scraped surface, ensuring uniform thickness. It shall be dashed with mortar and floated roughly with wooden float and kept damp for at least two days. 2. Applying 18 mm of lime plaster (lime in water with ingredients such as Jaggery liquid, Karkkai liquid, Egg shells and brick jelly made ready for application after mixing and keeping for 20 days period) on the wetted surface of the first coat. It shall be brought to true even surface and lightly roughened with a wooden float and allowed to dry after keeping damp for two days. 3. Sprinkled lime water curing shall be started once the plaster has sufficiently hardened and kept wet for at least 10 days. Complete for finished item of work. All lime mortars, Plasters, contain necessary ingredients and additives in the above mix, the cost of ingredients is added separately. The weight for slaked lime is 500Kg/Cum after 10 days of slaking. As per CPWD Rate Analysis (APSD Schedule Item No.226)
Scraping old decayed plastering Making cornice work wherever necessary and attending 50mm thick Ornamental plastering 1st coat 36mm thick in LM (1:2) prop, 2nd coat, 14mm thick in LM (1: 1 1/2) prop and top finishing with Cebara 3mm thick, for clock tower including cost and conveyance of all material and labour charges, Scaffolding charges etc., complete for finished item of work for -10 sqm.
White washing Exterior Surfaces with lime White washing up to 3 coats to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as lift charges etc., complete for finished item of work, but excluding conveyance charges of materials
Lime punning with a mixture of lime putty (screened and pressed through) and marble dust mixed with Gur, Bilgri, Urd and other ingredients followed by grinding to fine consistency for smooth finishing (for attaining buffed finish) of mix 1:2 (1 lime : 2 marble powder).
Abrasive Cleaning - Stone cleaning of dust sediments, oxides, metal salts, micro vegetation with mini sand blaster of working pressure from 0.1 bar tp 7.0 bar mix using abrasive garnet or aluminum oxide with ranging size of 29 to 250 micron(mesh 320 to 60) including all PPE and cleaning the site after the complition etc., complete
Pointing: Providing removing old deteriorated pointing and flush-re-pointing to Existing dressed and coursed stone masonry with Lime-Surkhi 1:1:2 Mortar, after raking joints to depth of 20mm nicely lining, including cost of materials, labour, curing complete as per specifications. (Taking 75% of Qnty same as Peripheral area)
DEVEGETATION Manually removal of vegetation (major trees, climbing plants, creepers) from walls, columns, arches, floor etc in a skilled and careful manner, using appropriate tools and means and without causing any damage to the adjoining parts, including carrying and stacking the dismantled materials including lift/lower up to 11mtrs and lead up to 50 mtrs as directed by the engineer or architect in charge. The exposed surfaces will be coated with a paste made from ammonium sulphonate crystals or with "Tree killer" available in market. In this condition the root system may be left to absorb and die. Large sections of dead wood must not be left within the core. As they decay they will remove support and create voids and weaknesses in the wall. Pull off a well‐established mat of vegetation must be resisted. Tamping, grouting, pointing and resetting of brick / stones especially on wall top, must all be anticipated as remedial work. Preparatory work that includes removal of existing vegetation on the Facade by cutting the branches first and inserting mixture of asafetida and quick lime 3 times through a hole made in the trunk and removing all the roots carefully causing minimum damage to the structure, along with clearing of moss/algae growth with necessary scaffolding etc. and disposal of the debris up to a distance of 500m outside the periphery of the area cleared, complete for finished item of work.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer - in- charge.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chow khats, architrave, holdfasts etc. complete and stacking within 50 meters lead as per direction of Engineer - in- charge.
SUB HEAD-1 Internal Electrical Work
Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required. Group B
Wiring for light/power plug with 2x4 sq. mm FRLS PVC insulated copper conductor single core cable in surface/recessed pvc conduit along with 1 No 4 sq. mm FRLS PVC insulated copper conductor single core cable for loop earthing as required.
Wiring for circuit/ submain wiring along with earth wire with the following sizes of FRLS PVC insulated copper conductor, single core cable in surface/ recessed medium class PVC conduit as required 2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire
4 X 4 sq. mm + 2 X 4 sq. mm earth wire
Supplying and drawing following sizes of FRLS PVC insulated copper conductor, single core cable in the existing surface/ recessed steel/ PVC conduit as required. 3 x 1.5 sq. mm
3x4 sq.mm
4 X 10 sq. mm + 2 X 6 sq. mm earth wire
4 X 16 sq. mm + 2 X 6 sq. mm earth wire
Supplying & fixing two module stepped type electronic fan regulator on the existing modular plate switch box including connections but excluding modular plate etc. as required.
Supplying and fixing suitable size GI box with modular plate and cover in front on surface or in recess, including providing and fixing . 3 pin 5/6 A modular socket outlet and. 5/6 A modular switch, connections etc. as required.
Supplying and fixing suitable size GI box with modular plate and cover in front on surface or in recess, including providing and fixing 6 pin 5/6 & 15/16 amps modular socket outlet and 15/16 amps modular switch, connection etc. as required.
Supplying & fixing suitable size GI box with modular plate and cover in front on surface or in recess including providing and fixing 25 A modular socket outlet and 25 A modular SP MCB, “C” curve including connections, painting etc. as required.
Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required.Telephone socket outlet
Bell push
Supplying and fixing following size/ modules, GI box along with modular base & cover plate for modular switches in recess etc as required. 1 or 2 Module (75mmX75mm)
Supplying and fixing following Modular base & cover plate on existing modular metal boxes etc. as required. 1 or 2 Module
Supplying and drawing following pair 0.5 mm dia FRLS PVC insulated annealed copper conductor, unarmored telephone cable in the existing surface/ recessed steel/ PVC conduit as required. 1 Pair
Supplying and fixing of following sizes of medium class PVC conduit along with accessories in surface/recess including cutting the wall and making good the same in case of recessed conduit as required. 25 mm
Supplying and fixing call bell/ buzzer suitable for single phase, 230 volts, complete as required.
Supplying and fixing of following size DLP PVC trunking with all accessories including end covers, couples, bends, internal/external angle, end caps etc complete as reqd. 100mm X 50mm
Providing and fixing following rating and breaking capacity and pole MCCB in existing cubicle panel board including drilling holes in cubicle panel, making connections, etc. as required. 100 Amp, 30KA, FPMCCB
Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution board, 240 volts, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator) 6 way Double door
Supplying and fixing of following way Horizontal Type three pole & Neutral sheet steel, MCB distribution board415 V on surface/recess, complete with tinned copper bus bar, neutral bus bar, earth bar, interconnections powder painted including earthing etc.as required. (but without MCB / RCCB / isolator) 6 way (4 + 18), Double door
8 way (4 + 24), Double door
Supplying and fixing of following ways surface / recess mounting, vertical type, 415 V, TPN MCB distribution board of sheet steel, dust protected, duly powder painted, inclusive of 200 A, tinned copper bus bar, common neutral link, earth bar, base for mounting MCCBs (but without MCBs and incomer MCCB) as required. (Note : Vertical type MCB TPDB is normally used where 3 phase outlets are required). 4 way (4 + 12), Double door
Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, "C" curve, MCB suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. Single pole
Triple pole and neutral
Supplying and fixing following rating, four pole, (three phase and neutral), 415 volts, residual current circuit breaker (RCCB), having a sensitivity current 30 mA in the existing MCB DB complete with connections, testing and commissioning etc. as required. 63 amps
Supplying and fixing following rating, double pole, (single phase and neutral), 240 volts, residual current circuit breaker (RCCB), having a sensitivity current 30 mA in the existing MCB DB complete with connections, testing and commissioning etc. as required. 25 amps
Supplying and fixing DP sheet steel enclosure on surface/ recess along with 25/32amps 240 volts "C" curve DP MCB complete with connections, testing and commissioning etc. as required.
Earthing & Lightning Conductor
Earthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt as required.
Providing and fixing 25 mm X 5 mm G.I. strip in 40 mm dia G.I. pipe from earth electrode including connection with G.I. nut, bolt, spring, washer excavation and re-filling etc. as required.
Providing and fixing 25 mm X 5 mm G.I. strip on surface or in recess for connections etc. as required.
Providing & fixing 6 SWG dia G.I. Wire on surface or recess for loop earthing as required.
Supply, intallation of Light Fitting, Fans and Fixtures
Supply, Installation, Testing and Commissioning of 36W LED bateen light not less than 100lm/W, 5700K etc., as required.
Supply, Installation, Testing and Commissioning of 20W LED bateen light not less than 100lm/W, 5700K etc., as required.
Supply & fixing of adjustable, heavy duty chrome plated stainless steel wire/rod suspention aarnagement kit for above LED for hanging from ceiling etc., as required
Supply, Installation, Testing and Commissioning of 60 W LED Flood Light not less than 100lm/W, 5700K with IP65/66, inbuilt driver, surge protector etc., as required.
Supply, installation, testing and commissioning of fancy wall bracket fitting with 9W LED bulb suitable for 230V, single phase, 50Hz, AC supply complete with all accessories etc., complete as required.
Supply, Installation, Testing and Commissioning of 1200/1400 mm sweep, BEE 5 star rated, ceiling fan with Brush Less Direct Current (BLDC) Motor, class of insulation: B, 3 nos. blades, 30 to 150 cm long down rod, 2 nos. canopies, shackle kit, safety rope, copper winding, Power Factor not less than 0.9, Service Value (CMM/W) minimum 6.85, Air delivery minimum 215 CMM, 350 RPM (tolerance as per IS : 374-2019), THD less than 10%, remote or electronic regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C (max.), insulation resistance more than 2 mega ohm, suitable for 230 V, 50 Hz, single phase AC Supply, earthing etc. complete as required.
Supply, Installation, Testing and Commissioning of 9/10W LED mirror light not less than 100lm/W, 5700K etc., as required.
Supplying of 300mm heavy duty exhaust fans suitable for 230 Volt, 50 Hz, Single phase, A.C. supply and complete with all standard, hylum sheet accessories required.
Supply, Installation, Testing and Commissioning of 10W LED bollard light not less than 100lm/W etc., including excavation & foundation as required.
Supply, Installation, Testing and Commissioning of 40W LED post top not less than 100lm/W including base plate & GI pipe etc., as required.
Supply, Installation, Testing and Commissioning of 12W LED post top not less than 100lm/W including base plate & GI pipe etc., as required.
Supplying and fixing of SMC looping box size 200mm X 140 mm X 95mm including providing 1nos 6Amps 10 KA, 'C ' SPMCB, 1nos bus strips, brass terminals for cable looping, necessary holes for inserting the cables. including painting, connections, testing and commissioning etc as required.
Supply & laying of following size ISI marked XLPE insulated armoured aluminium conductor cable of 1.1 KV grade confirming to IS 7098 /1988 with upto date amendment as required. 2 x 10 sq.mm
3 x 10 sq.mm
Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc..direct in ground (75 cm below ground level) including excavation and refilling the trench but excluding sand cushioning and protective covering etc., complete as required. 63 mm dia (OD-63 mm & ID-51 mm nominal)
Supply, Installation, Testing and Commissioning of outdoor wall mounted CRCA sheet steel panel board of size 400 x 400 x 250, not less than 2 mm thick, dust and vermin proof, including bus strips, painting along with following switch gears etc. as required.a) Incoming : 40 amps,TP MCB - 1 No. i) Three phase LED type indicating lamps with toggle switches and 6A SPMCBs protection-1 Set b) out going : 32 amps, TP MCB - 1 No. i) 16 amps, DP MCB - 1 No. ii)Street light timer with 1 NO + 1 NC auxiliary contactor - 1 No. iii) On/off indication lamps - 1 set
HORTICULTURE
Trenching in ordinary soil up to a depth of 60 cm including Removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by Filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure).
Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment).
Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete - Screened through sieve of I.S. designation 20 mm
Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete - Screened through sieve of I.S. designation 16 mm - Screened through sieve of I.S. designation 4.75 mm
Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) etc., - Holes 1.2 m dia and 1.2 m deep
Plantation of Trees, Shrubs, and Hedge at site i/c watering etc., - Shrubs Plant
Plantation of Trees, Shrubs, and Hedge at site i/c watering etc., - Hedge Plant /Ground cover
Providing and displaying of Araucaria cookie having ht. 75 cm to 90 cm, straight, well developed, fresh and healthy with lush green leaves from bottom to top in 25 cm size of Earthen pot/Plastic pot & as per direction of the officer-in-charge.
Providing and displaying of Areca Palm having ht. 90 cm to 1.20 m with 4 to 5 suckers, well developed, fresh and healthy with lush green foliage in 25 cm size of Earthen pot/Plastic pot & as per direction of the officer-in-charge.
Providing and displaying of Raphis palm having ht. 75 cm to 90 cm with 12 to 15 equal suckers, well developed, full of fresh & healthy leaves from bottom to top in 25 cm size Earthen pot/Plastic pot & as per direction of the officer-in-charge.
Providing and Displaying Bougainvillea named variety, Sobhra, Thima, Marry palmar, Cherry Blossom etc. well developed with fresh & healthy bushy in full bloom 75 to 90 cm ht. in 40 cm Cement Pot as per direction of the officer-in-charge.
Providing and Displaying Foxtail palm well developed with fresh & healthy foliage of ht. 210 to 240 cm in big 40 cm Cement Pot as per direction of the officer-in-charge.
Providing and stacking of Clerodendrum inerme of ht. 20 cm to 30 cm multi branched in 15 cm size of Earthen Pot/Plastic Pot & as per direction of the officer-in-charge.
Providing and stacking of Plumeria alba of height 165-180 cm. with 3-4 branches and thick stem in big size HDPE bags as per direction of the officer-in-charge.
Providing and stacking of Chandni dwarf of height 15-20 cm., well branched in earthen pots of size 20 cm as per direction of the officer-in-charge.
Providing and stacking of Hamelia patens of height 60-75 cm. with 6-8 branches in poly bags of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Hibiscus rosasinensis of height 60-75 cm. with 5-6 branches in p.bag of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Nerium oleander (kaner) of height 45-60 cm. with 3-4 branches in poly bags of size 20 cm as per direction of the officer-in-charge.
Providing and stacking of Tecoma gaudichaudi of height 60-75 cm. with 5- 6 branches in p.bag of size 25 cm as per direction of the officer-in-charge.
JEERNODHAR CONSERVATORS PVT LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .