| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹39.1 LAccepted-AOC SAI NIWAS KELHORI ROAD CHACHAI DISTT ANUPPUR MP 484220 | CHACHAI | ANUPPUR | MP | 484220 | ₹39.1 L Quoted ₹33.2 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | M/S SHUKLA ASSOCIATION L1 |
|---|---|---|---|---|
| 1.00For 1st year | ||||
| 2.00Associated Compulsory Works of MILLS, FANS & APH | ||||
| 3.00 | Servicing of Roller Journal Assy. Replacement of Grinding Roll, re-alignment of old bearing / repalcement with new bearings for Coal Mill XRP-883 | 4 | Nos. | 17,500 ₹82,600 |
| 4.00 | Replacement of set of grinding rolls and Bull ring segments with realignment of old bearings/replacement of new bearings in Coal Mill XRP 883 | 5 | Set | 51,750 ₹3.1 L |
| 5.00 | Replacement of straight coal pipes. | 5 | RM | 275 ₹1,622.50 |
| 6.00 | Replacement of Airport Ring Assembly with new one | 1 | Job | 18,200 ₹21,476 |
| 7.00 | Repairing of mill body side liner or flue gas duct by providing patching of size 300 x 300mm | 550 | Patch | 400 ₹2.6 L |
| 8.00 | Replacement/ Repairing of lower skirt in Coal Mill XRP-883 | 1 | Set | 1,540 ₹1,817.20 |
| 9.00 | Seal setting of Air Pre Heater | 1 | Nos. | 17,000 ₹20,060 |
| 10.00 | Servicing / Replacement of 5APC Gear Box of APH | 1 | Nos. | 13,200 ₹15,576 |
Tender Value
₹38.3 L
EMD Value
₹76,600
Closing Date
6 Aug 2025, 3:00 pmClosed
CE GEN ATPS
O/o SE PNW ATPS
Biennial work contract for breakdown maintenance of coal mill, fans, APH and ESP of 210 MW ATPS Chachai
2025_MPPGC_427542_1
334/MM
Open Tender
Miscellaneous Works
730 days
ATPS Chachai
As per NIT
7 documents required · 7 mandatory
₹1,000
Yes
₹76,600
Yes
11 Feb 2026
21 Jun 2025
8 Aug 2025
21 Jun 2025
6 Aug 2025
21 Jun 2025
Amount
For 1st year
Associated Compulsory Works of MILLS, FANS & APH
Servicing of Roller Journal Assy. Replacement of Grinding Roll, re-alignment of old bearing / repalcement with new bearings for Coal Mill XRP-883
Replacement of set of grinding rolls and Bull ring segments with realignment of old bearings/replacement of new bearings in Coal Mill XRP 883
Replacement of straight coal pipes.
Replacement of Airport Ring Assembly with new one
Repairing of mill body side liner or flue gas duct by providing patching of size 300 x 300mm
Replacement/ Repairing of lower skirt in Coal Mill XRP-883
Seal setting of Air Pre Heater
Servicing / Replacement of 5APC Gear Box of APH
Checking and servicing of Guide/ Support bearing assembly of APH
Running meter welding in centre section & flue gas duct at APH inlet/ Flue gas duct
Checking of rotor run-out & rotor levelling in APH
Servicing of APH soot blower mechanism of APH
Replacement of ceramic lined venturi vanes
Repair/Replacement of Mill Bottom Linear Assembly/Mill Side Liner Assembly of reject chamber
Repairing of Journal Head
Repairing of Journal Opening Cover
Replacement of Journal Stop Bush with Bolt/Spring Stud Bearing of Journal Compression Spring
Replacement of Journal Head Liner
Inspection & rectification of plain bearing or, bush bearings & bush bearing housings of ESP
Replacement / repairing of rapping hammers of CERM / EERM /GDRM of ESP
Repair / replacement of shaft insulators of ESP
Repair / replacement of support insulators
Repairing & alignment of collecting electrode of ESP
Replacement & alignment of emitting electrodes of ESP
Replacement / repair of vertical shaft of EERM of ESP
Replacement of complete shaft assembly of CERM / EERM /GDRM of ESP
Replacement of oil of CERM / EERM /GDRM gear-box of ESP
Replacement of shock- bar pads of ESP
Replacement of gear wheels of EERM of ESP
Repair of ESP Manhole Door of ESP
Associated optional works of MILLS, FANS & APH ( If required)
Replacement of Planetary Gear Box of Mill with New Gear Box/ Serviced Gear Box
Dismantling & assembly of FD fan comprises inspection/ replacement of bearings of main bearing housing DP test of blade and hydraulic test of runner assembly
Complete alignment of motor to fan/mill/pump alongwith coupling.
Replacement/Repairing of MPO & MDV Assembly
Replacement of CeramicLined Coal pipe Bends
Replaement/Repairing of inner Cone Drum Section
Servicing/replacement of Classifier Assembly
Replacement of ID fan Bearing
Replacement of PA fan Bearing
Replacement of Guide Bearing of APH
Replacement of Support Bearing of APH
For 2nd year
Associated Compulsory Works of MILLS, FANS & APH
Servicing of Roller Journal Assy. Replacement of Grinding Roll, re-alignment of old bearing / repalcement with new bearings for Coal Mill XRP-883
Replacement of set of grinding rolls and Bull ring segments with realignment of old bearings/replacement of new bearings in Coal Mill XRP 883
Replacement of straight coal pipes.
Replacement of Airport Ring Assembly with new one
Repairing of mill body side liner or flue gas duct by providing patching of size 300 x 300mm
Replacement/ Repairing of lower skirt in Coal Mill XRP-883
Seal setting of Air Pre Heater
Servicing / Replacement of 5APC Gear Box of APH
Checking and servicing of Guide/ Support bearing assembly of APH
Running meter welding in centre section & flue gas duct at APH inlet/ Flue gas duct
Checking of rotor run-out & rotor levelling in APH
Servicing of APH soot blower mechanism of APH
Replacement of ceramic lined venturi vanes
Repair/Replacement of Mill Bottom Linear Assembly/Mill Side Liner Assembly of reject chamber
Repairing of Journal Head
Repairing of Journal Opening Cover
Replacement of Journal Stop Bush with Bolt/Spring Stud Bearing of Journal Compression Spring
Replacement of Journal Head Liner
Inspection & rectification of plain bearing or, bush bearings & bush bearing housings of ESP
Replacement / repairing of rapping hammers of CERM / EERM /GDRM of ESP
Repair / replacement of shaft insulators of ESP
Repair / replacement of support insulators
Repairing & alignment of collecting electrode of ESP
Replacement & alignment of emitting electrodes of ESP
Replacement / repair of vertical shaft of EERM of ESP
Replacement of complete shaft assembly of CERM / EERM /GDRM of ESP
Replacement of oil of CERM / EERM /GDRM gear-box of ESP
Replacement of shock- bar pads of ESP
Replacement of gear wheels of EERM of ESP
Repair of ESP Manhole Door of ESP
Associated optional works of MILLS, FANS & APH ( If required)
Replacement of Planetary Gear Box of Mill with New Gear Box/ Serviced Gear Box
Dismantling & assembly of FD fan comprises inspection/ replacement of bearings of main bearing housing DP test of blade and hydraulic test of runner assembly
Complete alignment of motor to fan/mill/pump alongwith coupling.
Replacement/Repairing of MPO & MDV Assembly
Replacement of CeramicLined Coal pipe Bends
Replaement/Repairing of inner Cone Drum Section
Servicing/replacement of Classifier Assembly
Replacement of ID fan Bearing
Replacement of PA fan Bearing
Replacement of Guide Bearing of APH
Replacement of Support Bearing of APH
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid