Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
23 Feb 2024, 6:50 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer
KARAMBAKUDI
Construction of new kalaiyarangam vettai alagar kovil at karu.keelatheru panchayat
2024_RDTN_428476_1
WORK 1 TRICHY MP KARUKELATHERU PANCHAYAT KALAIYARANGAM WORK
Open Tender
Civil Works
Item Rate
180 days
karambakudi
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,000
27 Feb 2024
21 Feb 2024
23 Feb 2024
21 Feb 2024
23 Feb 2024
21 Feb 2024
Amount
Construction of Kalaiyarangam @ Vettai Azhagar kovil near in Karu.Keelatheru Panchayat.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Filling with good river sand including cost and conveyance of sand to worksite including all labour charges for filling etc complete
Refilling the basement with excavated earth other than Sand complying the Standard specification
Cement Concrete in 1 : 4:8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Brick Work in C m 1:5 mix using country brick of size 8 3/4 x 4 1/4 x2 3/4 including cost and conveyance of all materials to site and labour charges and etc,complete
R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Centering Shuttering and Scafollding for Soffits of slab of plan surface including shuttering 3 m high using Ms sheet of size 15X 25X 3 mm laid over w.joint of size 10X6.50 cm Spaced 75mm c/c complying with standard Specification
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification
Ceiling Plastering with CM 1:3, 10mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
Providing Granolithic Pattern Floor finish with plain cement concrete 1:2:4 using 10-12 mm ISS HBG metal and top rubbed smooth etc., complete complying with standard specification as directed. (25mm thick)
White washing two coats with best shell lime including cost and conveyace of all materials to work site and all labour charges etc. complete
Distempering two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Exterior emulsion two coats using best freshly burnt shell lime in all the floors using best quality & approved variety of colouring pigments including cost of lime, colouring pigment, Fevicol type gum, brushes,scaffolding charges etc., complete
Painting two coats over new iron works using ready mixed enamel paint including cost and all charges etc completed.,
Cost and supply of Steel Door of size 0.90x2.10m including cost and all charges etc completed.,
Cost and supply of Steel windows of size 0.90x1.20m including cost and all charges etc completed.,
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
S VENKATESH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .