| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
20 Jan 2022, 6:00 pmClosed
Executive Engineer REW Doda
Office of the Executive Engineer REW Doda
Constt of Entry Gate Link Road Durga Nagar Pyt Khellani Block Khellani Retender
2022_RDPR_157041_1
e-NIT No 45/ Capex of REW Doda 2021-22 DT 14-01-22
Open Tender
Civil Works
Item Rate
30 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Rural Development and Panchayati Raj
₹4,000
22 Jan 2022
14 Jan 2022
21 Jan 2022
14 Jan 2022
20 Jan 2022
14 Jan 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) INCL ALL CARRIAGES
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) INCL ALL CARRIAGES.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. INCL ALL CARRIAGES
Centering and shuttering including strutting, propping etc. and removal of form. ALL COMPLETE
Centering and shuttering including strutting, propping etc. and removal of form. EDGES OF SLAB
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) INCL ALL CARRIAGES.
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level
Providing and fixing machine cut, mirror / egg shell polished , Marble stone work for wall lining (veneer work) including dado, skirting, risers of steps etc., in required design and pattern wherever required, stones of different finished surface texture, on 12 mm (average) thick cement mortar 1:3 (1 cement : 3 coarse sand) laid and jointed with white cement slurry @ 3.3 kg/sqm including pointing with white cement slurry admixed with pigment of matching shade, including rubbing, curing, polishing etc. All complete as per Architectural drawings, and as directed by the Engineer- in-Charge. a. 18 mm thick Italian Marble stone slab, Perlato, Rosso Verona, Fire Red or Dark Emperadore etc. INCL ALL CARRIAGES
15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 4 ( 1 cement : 4 coarse sand) INCL ALL CARRIAGES
Providing and applying Plaster of Paris putty of 2mm thickness over plastered surface to prepare the surface even and smooth complete. INCL ALL CARRIAGES
Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 grams/liter.
Finishing walls with acrylic smooth exterior paint of required shade on New work (Two or more coats applied @ 1.67 liter/10sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm)
CIB (citizen information Board ) size 4'00"x5'00"x0'9" (above plinth level) with tepered top having 20 degree slope in Brick Masonary(1:4) including plaster , paint, lettering and logos as per instruction of Engineer -in-charge including carriage of material. ( complete job)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .