Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.1 LAdmitted-Finance | ₹44.1 L | L1 | Admitted-Finance |
| 2 | L2₹46.6 L+₹2.5 L (5.76%)Admitted-Finance | ₹46.6 L+₹2.5 L (5.76%) | L2 | Admitted-Finance |
| 3 | L3₹47.3 L+₹3.2 L (7.36%)Admitted-Finance | ₹47.3 L+₹3.2 L (7.36%) | L3 | Admitted-Finance |
| 4 | L4₹49.1 L+₹5.0 L (11.3%)Admitted-Finance | ₹49.1 L+₹5.0 L (11.3%) | L4 | Admitted-Finance |
| 5 | L5₹49.6 L+₹5.5 L (12.6%)Admitted-Finance | ₹49.6 L+₹5.5 L (12.6%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AMIT SHARMA L5 | M/S Hajra Infra L1 | M/S JASWINDER SINGH L2 | Ashwani Kumar Angotra L4 | Balbir Singh L3 | NAKUL GUPTA L6 | Ravinder Manhas L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | ||||||||||
| 1.10 | All kinds of soil. | 178.74 | Cum | 190 ₹33,960.6 | 210 ₹37,535.4 | 160 ₹28,598.4 | 120 ₹21,448.8 | 100 ₹17,874 Lowest | 150 ₹26,811 | 120 ₹21,448.8 |
| 2.00Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level. | ||||||||||
| 2.10 | 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20 mm nominal size) | 2.09 | Cum | 5,200 ₹10,868 | 4,000 ₹8,360 Lowest | 4,500 ₹9,405 | 5,000 ₹10,450 | 5,000 ₹10,450 | 5,000 ₹10,450 | 5,500 ₹11,495 |
| 2.20 | 1:3:6 (1 Cement : 3 coarse sand(zone-III) : 6 graded stone aggregate 20 mm nominal size). | 51.14 | Cum | 4,200 ₹2,14,788 | 3,200 ₹1,63,648 Lowest | 4,050 ₹2,07,117 | 3,500 ₹1,78,990 | 3,500 ₹1,78,990 | 3,500 ₹1,78,990 | 4,100 ₹2,09,674 |
| 2.30 | 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) | 12.92 | Cum | 3,100 ₹40,052 | 2,700 ₹34,884 | 2,000 ₹25,840 Lowest | 2,000 ₹25,840 Lowest | 2,000 ₹25,840 Lowest | 3,500 ₹45,220 | 2,800 ₹36,176 |
| 3.00Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- All work upto plinth level. | ||||||||||
| 3.10 | 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) | 12.4 | Cum | 6,000 ₹74,400 | 6,000 ₹74,400 | 6,000 ₹74,400 | 6,500 ₹80,600 | 6,000 ₹74,400 | 4,500 ₹55,800 Lowest | 7,000 ₹86,800 |
| 4.00Centring and shuttering including strutting, propping etc. and removal of form for | ||||||||||
| 4.10 | Foundations, footings, bases of columns etc. for mass concrete. | 40.15 | Sqm | 212 ₹8,511.8 | 150 ₹6,022.5 | 140 ₹5,621 | 100 ₹4,015 Lowest | 100 ₹4,015 Lowest | 200 ₹8,030 | 350 ₹14,052.5 |
Tender Value
₹65 L
EMD Value
₹1.3 L
Closing Date
12 May 2026, 4:00 pmClosed
Estates Officer, SKUAST-Jammu
Estates Division, SKUAST-J, Chatha
Restoration by way of repair renovation to the Central Library, spine and other allied works at Main Campus, Chatha
2026_SKUST_309186_3
AU/Estates/2026-27/04 dated 27-04-2026
Open Tender
Civil Works
Item Rate
120 days
Main Campus, Chatha
Please refer tender documents
4 documents required · 4 mandatory
₹2,000
Assistant Comptroller (Estates), SKUAST-Jammu
₹1.3 L
14 May 2026
1 May 2026
13 May 2026
1 May 2026
12 May 2026
1 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.1 | All kinds of soil. | - | Cum | - | - |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level. | |||||
| 2.1 | 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20 mm nominal size) | 2.09 | Cum | - | - |
| 2.2 | 1:3:6 (1 Cement : 3 coarse sand(zone-III) : 6 graded stone aggregate 20 mm nominal size). | - | Cum | - | - |
| 2.3 | 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) | - | Cum | - | - |
| 3Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- All work upto plinth level. | |||||
| 3.1 | 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 4Centring and shuttering including strutting, propping etc. and removal of form for | |||||
| 4.1 | Foundations, footings, bases of columns etc. for mass concrete. | 40.15 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Scheduleofcredit.pdf
Other Document • 0.01 MB
TermsandConditionsoftheContract.pdf
Tender Documents • 0.22 MB
BOQ_1001072.xls
BOQ • 4.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .