Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance AAGNOO VERINAG | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.4 L
EMD Value
₹20,838
Closing Date
10 Apr 2026, 4:00 pmClosed
Executive Engineer
RnB Division Qazigund
Constrution of ACR at Middle School Bumthan.
2026_PWDJK_306701_1
NIT67//RnB/QZD/25-26/6083-97 Dtd 24-03-2026
Open Tender
Civil Works
Percentage
60 days
Qazigund
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer RnB Div. Qazigund
₹20,838
11 Apr 2026
25 Mar 2026
11 Apr 2026
26 Mar 2026
10 Apr 2026
26 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by mechanical means (Hydraulic excavator)in foundation trenches, including dressing of sides and ramming of bottom and all leads, lifts including getting out excavated soil and disposal of surplus soil as directed complete. (All Kinds of soil) | - | CUM | - | - |
| - | Providing and laying stone soling hand packed for foundation trenches including carriage of same from approved source up to site of work complete | - | CUM | - | - |
| - | Providing and laying in position cement concrete 1:4:8(1 Cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size crushed) excluding the cost of centring and shuttering. All work up to Plinth level, including cost and carriage of all material complete. | - | CUM | - | - |
| - | Providing and laying reinforced cement concrete in walls, (any thickness) including attached including curing but excluding the cost of centring, shutteringand finishing with.1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriage complete. | - | CUM | - | - |
| - | Providing and laying reinforced cement concrete in suspended floors roofs, landings, balcoonies etc (any thickness) including attached plasters including curing but excluding the cost of centring, shutteringand finishing with.1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriage complete. | - | CUM | - | - |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position & binding all complete including cost of cover blocks. TMT bars of grade Fe-500D or more. | - | KGS | - | - |
| - | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:2:4 coarse sand 20mm nominal size crushed stone agg.) | - | CUM | - | - |
| - | Centring and shuttering incld. Strutting, proping etc & removal of form work for mass concrete using steel sheets or kitply complete as directed. | - | - | - | - |
| - | Walls and foundations | - | CUM | - | - |
| - | Lintels | - | SQM | - | - |
stage.html
html • 0.04 MB
finance_995700.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_995700.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .