| 1 | L1₹24.6 LAccepted-AOC | ₹24.6 L | L1 | Accepted-AOC Found lowest one bidder |
| 2 | L2₹25.5 L+₹89,121.26 (3.62%)Rejected-AOC | ₹25.5 L+₹89,121.26 (3.62%) | L2 | Rejected-AOC Quoted high rate as compared to L1 |
| 3 | L3₹26.5 L+₹1.8 L (7.38%)Rejected-AOC R O TEMISGAM | LEH LADAKH | LADAKH | 194101 | ₹26.5 L+₹1.8 L (7.38%) | L3 | Rejected-AOC Quoted high rate as compared to L1 |
| 4 | L4₹27.6 L+₹2.9 L (11.9%)Rejected-AOC | ₹27.6 L+₹2.9 L (11.9%) | L4 | Rejected-AOC Quoted high rate as compared to L1 |
| 5 | L5₹29.7 L+₹5.0 L (20.4%)Rejected-AOC | ₹29.7 L+₹5.0 L (20.4%) | L5 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹26.3 L
EMD Value
₹53,000
Closing Date
23 Sept 2021, 2:00 pmClosed
Executive Engineer
Rural Engineering Wing Leh
Construction of Livestock Development Centre at Tia
2021_RDD_4473_7
NIT 73 UTLeh REW of 2021-22
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
Executive Engineer
₹53,000
Yes
10 Nov 2021
13 Sept 2021
25 Sept 2021
13 Sept 2021
23 Sept 2021
13 Sept 2021
Amount
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil
Providing and Laying Dry stone pitching any thickness at horizantial level. include cost of stone complete job.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) (A) Crushed.
Random Rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1 :6:12 ( 1 Cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement.1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars.
Providing and fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centring, shuttering and complete1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) (A) Crushed
15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 4 ( 1 cement : 4 coarse sand)
6mm cement plaster to ceiling of mix 1 : 3 (1 cement: 3 fine sand)
Centring and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Centring and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and centilevers
Centring and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform.
Centring and shuttering including strutting, propping etc. and removal of form for Under 20cms wide Edges of slabs and breaks in floors and walls.
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Second class kail wood
Providing and fixing glazed shutters for doors, windows-and clerestory windows using 1 Okg/sqm (4mm thick) float Rate for thickness of glass panes including lSI marked M.S. pressed butt· shutters in mm per sqm hinges bright finished of required size with necessary screws.second class Kail wood 30mm per sqm for windows.
Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows including lSI marked M.S. pressed Butt hinges bright finished of required size with necessary screws excluding panelling which will be paid for separately,al! complete as per direction of engineer- in charge Second kail wood for doors
Providing and applying white cement based putty of average thickness 2 mm, of approved brand and manufacture, over the plastered wall surface to prepare the surface even and smooth complete.
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade New work (two or more coats) over and in -eluding priming coat with cement primer
French spirit polishing with Two or more coats on new works including a coat of wood filler
Cement concrete flooring 1:2:4 ( 1 cement: 2 coarse sand . : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m.
Providing and fixing Action Tesa AC4 for flooring including side lipping and thermocol etc complete job.
Carriage of sand and course aggregate by mechanical transport for average lead upto 10 Km.
Carriage of cement and reinforcement steel by mechanical transport for average lead upto 20 Km .
Carriage of stone by mechanical transport for average lead upto 5 Km.
M/S NAWANG CHOSGIAL
M/S SONAM STOBGAIS
M/S RINCHEN TONDUP
M/S TSERING ANGCHOK MAKSPON GOVT CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .