| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAccepted-AOC | ₹3.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.5 Cr+₹10.0 L (2.96%)Rejected-Finance | ₹3.5 Cr+₹10.0 L (2.96%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.5 Cr+₹13.3 L (3.94%)Rejected-Finance | ₹3.5 Cr+₹13.3 L (3.94%) | L3 | Rejected-Finance L3 |
| 4 | L4₹3.8 Cr+₹36.7 L (10.8%)Rejected-Finance | ₹3.8 Cr+₹36.7 L (10.8%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical 01 KHUMRIYAL KUPWARA KHUMRIYAL KUPWARA KUPWARA JAMMU KASHMIR 193223 | KUPWARA | JAMMU AND KASHMIR | 193223 | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹3.8 Cr
EMD Value
₹7.6 L
Closing Date
24 Jan 2020, 4:30 pmClosed
Superintending Engineer PMGSY Circle Srinagar
Bund road Rajbagh Srinagar
Upgradation and Maintenance of road T06 - Panz Mullah Vail Nag Bal, Stage-U, Length 3.10Kms, Carriageway 5.5m, PMGSY-II (2019-20),Package No. JK01-2006
2019_KSRRD_86740_1
JK012006
Open Tender
CIVIL
Item Rate
365 days
Anantnag
Please refer Tender documents.
18 documents required · 18 mandatory
₹10,000
Account Officer PMGSY Kashmir
₹7.6 L
Office of the S E PMGSY Circle Srinagar
5 Apr 2021
28 Dec 2019
25 Jan 2020
28 Dec 2019
24 Jan 2020
28 Dec 2019
1 Jan 2020
Amount
PART A: SITE CLEARANCE
Clearing & grubbing road land including uprooting wild vegetation , grass, bushes ,shrubs, saplings & trees of girth up to 300mm , removal of stumps of such trees cut earlier & disposal of unserviceable materials up to a lead of 1000M including removal & disposal of top organic soil not exceeding 150mm in thickness as per technical specifications clause 201 (in area of non thorny jungle) by Mechanical means.
Uprooting and removal of stumps and roots of trees cut earlier
300 - 600 mm Girth
600-900mm Girth
900-1800mm Girth
PART B: EARTHWORK
Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.(Finished work to be measured)
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.50 m, transporting to site, spreadind, grading to required slope and compacting to meet the requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Soecifications Clause 301.5
Construction of unlined surface drain of average cross sectional area 0.4 sqm in soil to specified lines, grades,levels and dimensions Excavated material to be used in embankment with a lift upto 3m and lead of 50m (average lead 25 m) .as per technical specificaions clause 307. Mechanical means.
PART C: CROSS DRAINAGE WORKS
SECTION 1: PIPE CULVERT
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matte and disposal upto a lead of 50mr, dressing of sides and bottom and backfilling with approved material complete job .(Finished work to be measured)
Laying Type B (First Class) Bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Plain Cement Concrete PCC M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 802,803,1202 & 1203 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade including cost and carriage of material from source to the work site with all leads and lifts including loading, unloading, haulages, octori, complete job .(Finished work to be measured)
P/L cushion/Backfilling in foundation trenches as per drawing and T.S.Clause 1108 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job . (Finished work to be measured)
SECTION 2: i). 1 X 2.00M Span Slab Culvert (01 No.) ii). 1 X 8.00M Span Slab Culvert (02 N0s.)
Dismantalling of R.C.C work (slab)
Dismantalling of stone masonary in cement sand mortar(abuts)
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matte and disposal upto a lead of 50mr, dressing of sides and bottom and backfilling with approved material complete job .(Finished work to be measured)
Plain Cement Concrete PCC M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 802,803,1202 & 1203 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. PCC Grade M-15 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Plain/reinforced concrete in substructure complete as per drawings and technical specifications Clause 802, 804,805,806,807, 1202 & 1204. RCC Grade M-20 including cost and carriage of material from source to the work site with all leads and lifts including loading, unloading, haulages, octori, complete job .(Finished work to be measured)
Providing and laying reinforced cement concrete in superstructure as per drawings and technical specification clause 800, 1205.4 and 1205.5. R.C.C Grade M-25 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Supplying , fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawing and technical specification clauses 1002, 1005 and 1202
Supplying , fitting and placing TMT bar reinforcement (Fe 415) in superstructure complete as per drawing and technical specification clauses 1002, 1010 and 1202
Providing fitting and fixing in position pipe railing consisting of IS Rolled steel joist posts designation IS MB 100 (100x75) at 2.5m interval and three rows of 50mm dia steel pipes (light) including fixing in position on bridge deck complete as per drawing and technical specifications clause 1208.2.
Providing weep holes in plain/reinforced cement concrete abutment, wing wall & return wall with 100mm dia PVC pipe extending through the full width of the structures with slope of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204. 3.7 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Backfilling behind abutment,wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Behind abuts/wing walls including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Diversion of nallah & dewatering of trenches for 2m span culvert
Diversion of nallah & dewatering of trenches for 8m span culvert
SECTION 3: PIPE BED DIVERSION
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (500 mm dia.)
Backfilling behind abutment,wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Behind abuts/wing walls including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
PART D: PROTECTION WORKS
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matte and disposal upto a lead of 50mr, dressing of sides and bottom and backfilling with approved material complete job .(Finished work to be measured)
Plain Cement Concrete PCC M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 802,803,1202 & 1203 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. PCC Grade M-15 including cost and carriage of material from source to the work site with all leads and lifts including loading, unloading, haulages, octori, complete job .(Finished work to be measured)
Providing plums in the PCC work including cost and carriage of material from source to the work site with all leads and lifts including loading, unloading, haulages, octori, complete job .(Finished work to be measured)
Providing weep holes in plain/reinforced cement concrete abutment, wing wall & return wall with 100mm dia PVC pipe extending through the full width of the structures with slope of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204. 3.7 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (Granular material) including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
PART D: SIDE DRAIN
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 305.1 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Laying Type B (First Class) Bedding bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Plain Cement Concrete PCC M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 802,803,1202 & 1203 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade including cost and carriage of material from source to the work site with all leads and lifts including loading, unloading, haulages, octori, complete job .(Finished work to be measured)
Providing concrete for plain/reinforced concrete in Substructure complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 RCC M-20 Grade including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Supplying , fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawing and technical specification clauses 1002, 1010 and 1202 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
PART E: PAVEMENT
Excavation for roadway in soil with hydrualic excavator of 0.90 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with the requirements of lines, grades and x-sections and transporting to the embankment location with a lift upto 1.50m and lead upto 1000mts as per T.S.Clause 302.3
Scarifying existing bituminous surface to a depth of 150mm and disposal of scarified material with a lift upto 3m and lead upto 1000m as per T.S. clause 301.4. @ 20% of surface area
Providing ,laying ,spreading and compacting local material in block or large discreet particles such as kankar, laterite, dhandla etc. as per Table 400.13 to Water Bound Macadam specifications including spreading in uniform thickness, handpacking, rolling with 3-wheel 80-100kN static road roller in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of laid material,watering & compacting to the required density as per clause 405.3 and T.S.Clause 408.
Providing ,laying ,spreading and compacting graded stone aggregate to Wet Mix Macadam specification as per techinical specification Clause 406.Including premixing the material with water at OMC in Mechanical Mix plant , cost and carriage of all materials from approved plant to site with all leads and lifts and octori etc Laying in uniform layers with paver in sub-base/ base course on well prepaired surface and compacting with vibratory Roller to achieve the desired Density.
Prime Coat: Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (Low Porosity) including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Bituminous Macadam: Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.
Tack Coat: Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surfaces cleaned with Hydraulic broom as per Technical Specification Clause 503 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
20mm thick OGPC: Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.(By Mechanical Means) Bitumen S-90
Seal Coat: Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 (By Manual Means) including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Hard Shoulder:Construction of hard shoulders using WBM material as per Technical Specifications Clause 405.3 & 408 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job . (Finished work to be measured)
PART F: ROAD FURNITURE
Providing and fixing retro-refllectorised cautionary , mandatory and informatory sign as per IRC :67 made of encapsulated lense type reflective sheeting wide clause 1701, 2.3 fixed over aluminum sheeting 1.5mm thick supported on a mild steel angle iron post 75 x75 x6mm steel tube firmly fixed to the ground by properly designed foundation with M-15 grade cement concrete 450 x450 x 600mm , 600mm below round level as per drawing and technical clause 801 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Reinforced cement concrete M15 grade boundary pillar/local stone of standard design as per IRC:25 fixing in position including finishing and lettering , painting , concreting, ercting,loading, unloading, haulage etc. as per drawings and technical specifications cluase 1704 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Providing & fixing PMGSY Information sign board with logo as per drawings & technical specifications as per drawing clause 1701 and annexure 1700.1 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
a). Ordinary Kilometer Stone (Precast)
b). 200 m Stones (Precast)
Construction of job piller/bench mark as per Fig. 1600.1( d) as per drawing and Technical Specification Clause 1602.4 including cost and carriage of material from source to the work site with all leads and lifts including loading,unloading,haulages,octori, complete job .(Finished work to be measured)
Maintenance Cost of 1st year
Maintenance Cost of 2nd year
Maintenance Cost of 3rd year
Maintenance Cost of 4th year
Maintenance Cost of 5th year
The Contractor has to quote the rates for Construction part without GST and GST @12% shall be added at the time of Allotment.
M/S ASHAQ HUSSAIN CO
tawseef builders
M/S N S ROAD CONSTRUCTION CO
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .