Tender Value
₹2.3 Cr
EMD Value
₹3.4 L
Closing Date
15 Apr 2026, 10:00 pmClosed
Hubli Electricity Supply Company Limited
Construction of 10 nos of 11kV link lines from various sub stations for a distance of 53.79 Rkm in Savadatti subdivision of Bailhongal Division on Total Turnkey Basis.
276728
HESCOM/2025-26/EL/WORK_INDENT1083
Open
Electrical
HESCOM Superintending Engineer (PMC)Corporate Office Hubli
19 documents required · 19 mandatory
The bidder should have carried out works involving LT /HT lines /above class lines (new line or re-conductoring) for a route length of not less than 43.03 RKms (80% of the quantity proposed in the bid) during any one of the in the last Five Financial Years. (i.e.,2019-20, 2020-21,2021-22,2022-23 and 2023-24) on Total Turnkey/Partial Turnkey Basis/ Labour contract basis /self-execution basis in any State/ Central Govt. Distribution Companies / PSUs. Such works shall be in successful operation for a period of at least 1(One) year as on date of submission of bid. As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV
The bidder should have Satisfactorily completed (at least 90% of the contract value), as prime a contractor, at least one contract involving the Construction of Electrical Distribution system (experience in only LT lines will not be considered) of value not less than Rs. 113.65 LAKHS (50% of the amount put to Tender) in any State/Central Govt./ Distribution Companies/PSUs in the last Five Financial Years(i.e.,2019-20, 2020-21,2021-22,2022-23 and 2023-24). As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV. Note- Updated to the FY in which the tenders are invited. The value of the completed works shall be given a weight of 10% per year to bring them to the price level of the FY in which the tenders are invited.
The Bidder should have achieved in at least Two financial year, a minimum financial turnover of not less than Two Times the amount put to tender in the last five financial years (i.e., 2020-21 2021-22, 2022-23, 2023-24 and 2024-25). The bidder shall upload the downloaded Form GSTR-9/9C, 3CA/3CB & 3CD from the portal along with Copies of Annual turnover certificate and audited balance sheet of profit and loss account duly mentioning the UDIN No duly certified by Chartered Accountant as applicable. Documents without UDIN No, GSTR-9/9C, 3CA/3CB & 3CD downloaded from portal are liable for rejection. Note. Updated to the FY in which the tenders are invited. Financial turnover of previous years shall be given a weight of 10% (say) per year to bring them to the price level of the FY in which the tenders are invited
Liquid assets (Cash at Bank plus Term deposit in any Nationalized/Scheduled Commercial Bank) on or after the date of notification of tender plus Availability of credit facility in any Nationalized/ Scheduled Commercial Bank shall not be less than 30% of the amount put to tender Equivalent of estimated cash flow for 3 months/year in peak execution period) which shall be which shall be supported by certificate issued by any Nationalized /Scheduled Commercial Bank. The said Original scanned Credit Facility Certificate should possess the name of the Firm and tender Indent number and the credit facility to be issued in the name of Superintending Engineer (Ele), Project Monitoring Cell, Corporate Office, HESCOM, Navanagar, Hubli. The credit facility certificate should be in the Format Annexed to this bid. (ANNEXURE-V). The conditional credit certificates are liable for rejection.
The bidder shall be a sole proprietorship firm or a partnership firm or a company incorporated under companies Act 1956/2013. Copy of the Certificate of Incorporation in case of Registered Company/ Partnership deed in case of Partnership Firm/GST or PAN registration in case proprietor ship firm is to be uploaded.
The bidder should possess valid Class-I / Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids. (Note: Firm name in the license as well as all the statutory documents should be same otherwise bid is liable for rejection). Scanned original copy of the Class-1 / Super grade Electrical Contractors License issued by Electrical Inspectorate, Government of Karnataka is to be uploaded by the bidder.
The bidder should upload original scanned copy of ESI issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of EPF Reg. No issued by the respective competent authorities of the concerned department
The bidder should upload original scanned copy of Pan No issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of GST No. issued by the respective competent authorities of the concerned department.
The bidder should possess valid original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka. The bidder should upload original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka
The bidder should not have been Black-Listed by ESCOMs/ KPTCL/ any other Government Distribution/ Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-I).
The bidder should not have been defaulted & Terminated due to non-performance in execution of works against the order placed by ESCOMs/KPTCL/any other Government Distribution/Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-II)
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years with /KPTCL/ESCOMS. A history of awards involving litigations against the bidder or any part may result in rejection of bid. Self-declaration for the same shall be uploaded (Annexure-III)
Tender Capacity: The bidder should upload available tender capacity calculated in the prescribed format through e-procurement portal within due date of submission of bids. The available tender capacity shall be more than the total tender value.
Pre Survey: The bidder at his own responsibility must visit and examine the site of works and its surroundings and obtain all information that may be necessary for participating in the tender. The cost of the visiting/survey of the proposed works shall be at the bidders own expenses. The site inspection survey certificate of the proposed works issued by the concerned Executive Engineer-Ele. O&M Division, HESCOM should be obtained by the bidder and shall be uploaded.
The bidder from Nations sharing Border with India should upload the certificate issued by GOI. OR Self-declaration for not from Nations sharing Border with India. Registration certificate issued by the competent authority shall be uploaded. OR If not Self-declaration in the prescribed format as per Annexure-VII shall be uploaded.
₹5,000
₹3.4 L
16 Mar 2026
16 Mar 2026
16 Apr 2026
20 Mar 2026
23 Mar 2026
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Construction of 10 nos of 11kV link lines from various sub stations for a distance of 53.79 Rkms in Savadatti subdivision of Bailhongal Division on Total turn key basis.
SUB DIVISION : Savadatti
NAME OF THE STATION 33/11 KV Chulaki 110/11 KV Savadatti 110/11 KV Aratagal 33/11KV Murgod
NAME OF THE EXISTING FEEDER F03-Shirasangi IP F05-Yadahalli NJY F09-JAKABAL IP F08-ARATAGAL IP F-10 Chachadi NJY F-7 Markumbi NJY F-3 Chachadi IP F-10 Chachadi NJY F-5 Inchal IP F-6 Murkumbi IP
Sl. No Particulars Unit TOTAL
4 PSC Pole - 8 Mtr Long, 200 Kg WL for stud Nos. 10 6 10 6 2 12 12 2 4 10 74.00
5 2 Pin cross For PSCC Pole 200 KG WL Nos. 10 12 20 12 4 24 24 4 8 20 138.00
6 H.T X arms with HTST supports bolts & nuts etc (RCC) Set 10 12 0 0 0 20 40 0 0 10 92.00
7 H.T X arms with HTST supports bolts & nuts etc (PSCC) Set 101 38 133 133 8 132 280 12 14 123 974.00
8 LT 4 Pin cross arm for RCC Set 5 0 0 5 0 0 0 0 0 0 10.00
9 LT 4 Pin cross arm for PSC Set 0 3 5 0 0 0 0 0 0 0 8.00
10 Double pole structure complete including 5KG ,8SWG Wire for structure Grounding for 9Mtr RCC POLES Sets 5 3 7 7 0 8 8 0 0 4 42.00
11 9.5 M RCC poles DP Structure Set 1 1 1 1 1 1 6.00
12 11kv, 5KN polymeric Pin insulator No 324 150 399 399 21 381 321 30 33 384 2442.00
13 11kV 45 KN polymeric insulator No 72 36 84 84 12 120 174 12 174 126 894.00
14 Spiral earth electrode No 119 50 133 133 8 152 141 10 13 133 892.00
15 Guy set complete with No 15 Strain Insulator and Concreting Materails Set 10 12 42 42 3 62 80 3 6 45 305.00
16 Concreting of Guy sets with Boulders, Mud sand No's 10 12 42 42 3 62 80 3 6 45 305.00
18 PG Clamps for Rabbit No's 0 0 30 30 0 0 0 0 0 0 60.00
19 EG Stirrups with GI Wire lacing Set of 2Nos 0 48 0 0 7 127 107 10 7 123 429.00
20 Guarding Material (Rs. 91/Mtr) including 4 pin cross arm Span 3 4 0 0 0 5 5 0 0 2 19.00
21 GOS 200A single break Nos 4 2 1 2 0 2 5 0 1 2 19.00
22 H - Frame Set for 11kV, 200Amps Single Break 005 Mounting - Nos 4 2 1 2 0 2 5 0 1 2 19.00
23 T-Riser for 9 mtr PSC pole to avoide crossing No 6 6 2 2 2 10 15 2 5 5 55.00
24 1.1 KV Pin insulators with GI pins No 20 8 20 20 0 0 0 0 0 0 68.00
25 Lattice Type Tower No 0 2 0 0 0 1 0 0 0 2 5.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
ZONE : HUBBALLI
CIRCLE : BALAGAVI
DIVISION : BAILHONGAL
SUB DIVISION : BAILAHONGAL, KITTUR, SAVADATTI
LINK LINE ABSTRACT
SUB DIVISION : Bailhongal
NAME OF THE STATION 110/11 KV Tigadi
NAME OF THE EXISTING FEEDER F03-Navalagatti
ESTIMATE COST in Rs. 2458353 2458353 Material Cost Labour Cost
Sl. No Particulars Unit TOTAL Rate Amount Rate Amount
HT Line (RKM) 3.25 3.3
3 9.5 Mtr. PSCC Pole 300kG WL No 0 0 7509 0 2282 0
4 11 Mtr. PSCC Pole 365kG WL No 0 0 7913 0 2583 0
5 PSC Pole - 8 Mtr Long, 115 Kg WL for stud-Hard Rock Nos. 45 45 3699 166455 3276 147420
6 PSC Pole - 8 Mtr Long, 115 Kg WL for stud 0 0 3699 0 1425 0
7 2 Pin cross For PSCC Pole 200 KG WL Nos. 90 90 263 23670 160 14400
8 2 Pin cross For PSCC Pole 140 KG WL Nos. 0 0 254 0 160 0
9 H.T X arms with HTST supports bolts & nuts etc (RCC) Set 20 20 646 12920 272 5440
10 H.T X arms with HTST supports bolts & nuts etc (PSCC) Set 65 65 643 41795 272 17680
11 LT 4 Pin cross arm for RCC Set 0 0 423 0 160 0
12 LT 4 Pin cross arm for PSC Set 0 0 420 0 160 0
13 LT 4 Pin cross arm for PSC -for Gaurding Set 0 0 420 0 0 0
14 LT 4 Pin cross arm For PSCC Pole 140 KG WL Set 0 0 411 0 160 0
15 Double pole structure complete including 5KG ,8SWG Wire for structure Grounding for 9Mtr RCC POLES Sets 5 5 20928 104640 5392 26960
16 11kv, 5KN polymeric Pin insulator No 225 225 205 46125 0 0
17 11kV 45 KN polymeric insulator No 80 80 186 14880 0 0
18 Spiral earth electrode No 75 75 239 17925 93 6975
19 Guy set complete with No 15 Strain Insulator and Concreting Materails Set 25 25 1170 29250 593 14825
20 Concreting of Guy sets with Boulders, Mud sand No's 25 25 0 0 250 6250 58537 10.96 641565.52 641682.59 47805.28
23 EG Stirrups with GI Wire lacing Set of 2Nos 75 75 276 20700 160 12000
24 Guarding Material Span 0 0 3720 0 1034 0 4610 4650 150
25 Guarding Material (Rs. 93/Mtr) Span 0 0 4650 0 1804 0
26 GOS 200A single break Nos 3 3 9450 28350 1104 3312
27 H - Frame Set for 11kV, 200Amps Single Break 005 Mounting - Nos 3 3 4332 12996 323 969
28 R & R off Rabbit ACSR Conductor 1.5% Sag Kms. 0 0 0 0 8285.9 0
29 T-Riser for 9 mtr PSC pole to avoide crossing No 4 4 1929 7716 816 3264 490
30 Base concreting 1:2:4, 500x650x150 mm each 33 33 0 0 312 10296
31 Pole concreting with CC 1:2:4 (with coping 650x500x1700 mm) Including material each 33 33 0 0 3434 113322
32 Coping 1:2:4 (as per actual) each 33 33 0 0 312 10296
33 1.1 KV Pin insulators with GI pins No 0 0 66 0 0 0
34 Tree Trimming Kms. 0 0 0 0 2901 0
35 Lattice Type Tower No 0 0 148830 0 5723 0
Abstract of Proposed Link Line of Haveri Division
Sl No Sub Division Proposed Nos RKm Estimate Cost (In Lakh) Remarks
Revised Abstract of Proposed Link Line of Haveri Division
Sl No Sub Division Proposed Nos RKm Estimate Cost (In Lakh) Remarks
BENEFIT TO RATIO AND PAY BACK PERIOD CALUCLATION
Techno - Economical Feasibality Study Using PERSENT WORTH CALUCLATION by DCF Method
Sl No Particular Formula ALL
1 Interest Charges A 10%
2 O&M Charges B 1.10%
3 Project Life C 25Years
4 Annuity Charges D 9.07
5 Capital Investment in Rs E #REF! 4039382 2249756
6 Energy Rate Per KWH at 11kv BUS F 8.3
7 Annual O&M Expenses in Rs G=E*B #REF!
8 Present Worth of Annual Expenses During the Life of Assests in Rs H=G*D #REF! 14762.63179
9 Present Worth of Cash Outflow in Rs I=H+E #REF!
10 Annual Reduction of Energy Losses in KWH J #REF! 139827.76
11 Annual Benifit due to Reduction of Energy Losses in Rs K=J*F #REF!
12 Prasent Worth of cash in flow HVDS in Rs (Total Benefit in Reduction of Annual EnergyLosses During Life period of Assets) L=K*D #REF! 53247
13 Benefit to Investment ratio M=L/I #REF!
14 Payback Period in Years N=I/K #REF!
Annual energy loss Before Bifurcation 2015379
Annual energy loss After Bifurcation 1267952
Annual Reduction of Energy Losses in KWH 747427
11 KV Link line works to be taken up
Sl.No Circle Division Sub Division Existing Station Existing feeder Existing Details Residual Details Proposed Station Type of Station New /Augmentation/Additional /Upgradation/Existing Probable date of commissioning for new /additional/augmentation sub station Name of the proposed feeder Proposed Connected load Proposed Length of line in R Kms Total Length in KM Proposel+Residuel Estimate cost in lakhs Estimate cost Existing Proposed Residual Energy Savings (in MU) %VR CB Ratio Breaker availability Yes/No Priority Cost per Km
Peak load in Amps Connected load Length of the line in Km %VR Connected load Length of the line %VR
1 Haveri Haveri Hanagal 33/11 kv MUSS Kalakeri F6 KANNESHWAR 195 2128 10.29 6.31 1127 6.85 1.61 4.7 33/11 kv MUSS Kalakeri Existing Siddeshwar 2882 7.3 9.21 32.3 3229083.0 0.9 0.4 0.1 0.42 0.22 2.17 4.77 Breaker available 5 4.40 4.769155825
2 Haveri Haveri Hanagal 33/11 kv MUSS Sheshagiri F11 HIREKAUNSHI 188 3126 12 6.64 1983 8.1 3.02 3.62 33/11 kv MUSS Sheshagiri Existing Lokparmeshwari 1983 12 15.24 40.7 4065741.0 0.8 0.12 3.85 2.07 Required 6 3.39 2.06604405
3 Haveri Haveri Hanagal 33/11 kv MUSS Sheshagiri F3 KONANAKOPPA 190 1916 10.29 5.56 1127 6.85 1.76 3.8 33/11 kv MUSS Laxmipur Existing Shiragod 1916 12 10.29 43.4 4340513.0 1.7 1.5 0.0 0.16 0.15 2.17 2.42 Required 7 3.62 2.419068898
4 Haveri Haveri Hanagal 110/33/11 kv MUSS Tilavalli F8 KAREKYATANAHALLI 190 2028 7.75 2.52 1127 6.85 1.76 0.76 110/33/11 kv MUSS Tilavalli Existing Varada 1667 6 9.2 26.2 2623060.0 0.9 0.3 0.2 0.38 0.15 9.22 4.00 Required 8 4.37 4.002958377
5 Haveri Haveri Haveri 33/11kV Hosaritti F10-Melamuri 200 4847 10.23 24.07 1703 6.85 5.22 18.85 33/11kV Hosaritti Existing Melamuri-1 2904 7.5 14.35 39.1 3914041.0 1.11 0.50 0.09 0.52 0.25 5.38 4.47 Available 1 5.22 4.471082444
6 Haveri Haveri Haveri 33/11kV Gandhipur F5-Agasanamatti IP 200 3723 13.15 29.27 1980 8.5 11.14 18.13 33/11kV Gandhipur Existing Agasanamatti-1 1743 8 16.5 41.0 4101631.0 1.35 0.12 0.72 0.51 0.25 4.58 4.27 Available @ 33KV Gandhipur 2 5.13 4.26659541
7 Haveri Haveri Haveri 110/33/11kV Haveri F7-Kurubagonda 225 5638 20.05 46.19 3019 15.64 21.57 24.62 110/33/11kV Haveri Existing Kurubagonda-1 2444 7 22.64 35.9 3589552.0 3.70 0.50 0.93 2.27 0.20 14.37 3.90 Required 3 5.13 3.90020816
8 Haveri Haveri Haveri 33/11kV Kerimattihalli F12-Kallapur 170 4272 17.54 38.99 1877 11.49 12.05 26.94 33/11kV Kerimattihalli Existing Kallapur-1 2395 9.5 20.99 49.4 4938199.0 2.70 0.91 0.37 1.42 0.32 21.92 4.54 Required 4 5.20 4.536066692
9 Haveri Haveri Haveri 33/11kV Gandhipur F2-Kallihal 200 3669 14.65 30.76 1816 8.4 9.96 20.8 33/11kV Gandhipur Existing Kallihal-1 1853 9.5 13.2 49.4 4938199.0 1.42 0.59 0.25 0.58 0.31 9.96 4.39 Required 5 5.20 4.394314607
10 Haveri Haveri Haveri 110/11kV Basavanakatti F7-Kanavalli IP 200 4607 10.8 23.85 1703 6.85 5.49 18.36 110/11kV Basavanakatti Existing Kanavalli-1 2904 8 14.85 41.0 4101631.0 1.90 1.10 0.18 0.62 0.26 23.39 4.44 Available @110KV Basavankatti 6 5.13 4.437259227
11 Haveri Haveri Haveri 33/11kV Kerimattihalli F1-Veerapur NJY 160 4900 17.65 28.68 2530 9.4 9.82 18.86 33/11kV Kerimattihalli(110KV HVR) Existing Veerapur NJY-2 2370 6 15.4 30.8 3077477.0 0.55 0.08 0.17 0.31 0.20 9.04 4.55 Breaker available 7 5.13 4.549181034
12 Haveri Haveri Haveri 110/33/11kV Guttal F6-Kurugunda 200 8097 12.2 29.72 5537 9.35 16.08 13.64 110/11kV Basavanakatti Existing Kurugunda-1 2735 9 18.35 46.1 4613709.0 0.97 0.05 0.39 0.53 0.30 4.36 4.55 Available @110KV Basavankatti 8 5.13 4.551652477
13 Haveri Haveri Haveri 33/11kV Hosaritti F2-Bommanakatti IP 208 4407 11.85 18.15 1565 3.7 2.28 15.87 110/11kV Basavanakatti Existing Bommanakatti-1 2842 9.5 13.2 49.4 4938199.0 1.89 0.77 0.41 0.71 0.35 21.64 4.96 Not required (Y Operation) 9 5.20 4.961322944
14 Haveri Haveri Haveri 33/11kV Gandhipur F3-Karadigudda IP 160 2905 18.55 31.2 1163 8.05 5.27 25.93 33/11kV Gandhipur Existing Anandavana (Karadigudda-1) 1742 9.5 18.05 49.4 4938199.0 1.07 0.38 0.21 0.48 0.31 18.68 4.39 Required 11 5.20 4.394314607
15 Haveri Haveri Haveri 33/11kV Kerimattihalli F5-Kerimattihalli IP 160 3968 11.3 20.24 1640 6 4.5 15.74 33/11kV Kerimattihalli Existing Kerimattihalli-1 2364 9.5 16 49.4 4938199.0 0.90 0.28 0.13 0.49 0.31 14.34 4.39 Required 13 5.20 4.394314607
17 Haveri Haveri Savanur 110/33/11KV Savanur F-4 Ichangi EIP 212 7436 21.4 36.92 3819 12.65 12.06 33/11KV Hattimattur Existing F-4 Ichangi EIP 3617 6.5 33.25 33.6 3361906.0 0.1 0.0 0.0 0.0 0.23 21.47 4.79 Not required (Y Operation) 6 5.17 4.788950078
18 Haveri Haveri Shiggaon 110/11kV Shiggaon F6-Mallur IP 180 3422 15.2 15 1040 5.7 9.5 110/11kV Shiggaon Existing F6-Mallur IP -1 2971 7.1 12.8 31.9 3193088.0 0.42 0.08 0.08 0.3 0.21 7.4 4.60 Not required (Y Operation) 1 4.50 4.603693979
19 Haveri Haveri Shiggaon 110/11kV Shiggaon F2-Dundashi IP 195 4062 17.9 30.22 1579 13.2 12.81 110/11kV Adavisomapur Existing Dundashi -1 2168 10.05 23.2 49.8 4978064.0 0.5 0.1 0.1 0.3 0.11 15.93 1.55 New breaker available at 110 KV Dundashi 2 4.95 1.54678606
20 Haveri Haveri Shiggaon 33/11kV Bommanahalli F9-Shadagaravalli 150 2869 15.9 15.1 1402 11.5 4.6 33/11kV Bommanahalli Existing F9-Shadagaravalli -1 1429 6.6 18.1 34.9 3488154.0 0.28 0.03 0.06 0.19 0.19 6.4 3.83 Not required (Y Operation) 4 5.29 3.832972971
21 Haveri Haveri Shiggaon 33/11kV Bankapur F8-Chandapur 184 2403 12.6 9.3 1151 9.7 3.1 33/11kV Bankapur Existing F8-Chandapur -1 1415 7 16.7 31.1 3113043.0 0.5 0.1 0.2 0.21 0.21 6.5 4.72 Required at 33 KV Bankapur 6 4.45 4.722067765
22 Haveri Haveri Shiggaon 110/11kV Shiggaon F12-Madli 210 4099 24.25 39.2 1492 17.05 8.7 110/11kV Adavisomapur Existing Madli IP-1 1930 6.8 23.85 33.4 3341175.0 0.4 0.1 0.1 0.19 0.23 15.79 4.82 Not required (Y Operation) Interlink 7 4.91 4.818664093
23 Haveri Haveri Shiggaon 33/11kV Shiggaon F3-Jekinkatti 210 3604 31.9 43.5 2163 24 14.2 33/11kV Shiggaon Existing F3-Jekinkatti -1 1654 7.2 31.2 37.6 3760517.0 1.5 0.8 0.2 0.44 0.26 9.6 4.84 Not required (Y Operation) 8 5.22 4.839760065
24 Haveri Haveri Shiggaon 33/11kV Shiggaon F4-Kurushapur 196 2891 22.7 20.5 752 8.8 1.2 33/11kV Shiggaon Existing F4-Kurushapur -1 1914 7.1 15.9 37.2 3719491.0 1.4 0.0 0.5 0.9 0.24 11.3 4.52 Required at 33 KV Shiggaon 9 5.24 4.51674705
25 Haveri Haveri Shiggaon 33/11kV Hulugur F5-Belavalakoppa 160 2129 24.7 23.27 1854 21.85 11.48 110/11kV Ramanakoppa Existing Belavalakoppa-1 1854 8.3 30.15 40.7 4069661.0 0.6 0.1 0.1 0.3 0.28 11.48 4.82 New breaker available at 110 KV Ramanakoppa 10 4.90 4.816125962
26 Haveri Haveri Shiggaon 33/11kV Bankapur F3-Kundur 120 2580 13 11.3 1366 11.6 4.3 33/11kV Bankapur Existing F3-Kundur -1 1214 6.2 17.8 32.4 3238044.0 0.6 0.1 0.1 0.4 0.21 3.8 4.54 Not required (Y Operation) 11 5.22 4.539777718
27 Haveri Haveri Shiggaon 33/11kV Bankapur F6-Hunagund 194 3220 13.1 14.6 1643 11.1 5 33/11kV Bankapur Existing F6-Hunagund -1 1552 6.9 18 36.3 3626910.0 0.6 0.1 0.1 0.5 0.23 6.9 4.44 Idle Avaiable at 33 KV Bankapur 12 5.26 4.439040395
28 Haveri Haveri Shiggaon 33/11kV Bankapur F5-Kalyan IP 130 4133 17.2 20.8 1503 6.5 2.2 33/11kV Bankapur Existing F5-Kalyan IP -1 1259 6.5 13 34.4 3441584.0 0.8 0.2 0.2 0.5 0.23 5.1 4.68 Not required (Y Operation) 13 5.29 4.678078466
Total 226.1 1105.9 110586967 6.56 4.15 Not required (Y Operation) 13 4.89
11 KV Link line works to be taken up
Sl.No Circle Division Sub Division Existing Station Existing feeder Existing Details Residual Details Proposed Station Type of Station New /Augmentation/Additional /Upgradation/Existing Probable date of commissioning for new /additional/augmentation sub station Name of the proposed feeder Proposed Connected load Proposed Length of line in R Kms Total Length in KM Proposel+Residuel Estimate cost in lakhs Estimate cost in lakhs Existing Proposed Residual Energy Savings (in MU) %VR CB Ratio Breaker availability Yes/No Priority Cost per Km
Peak load in Amps Connected load Length of the line in Km %VR Connected load Length of the line %VR
2 Haveri Haveri Haveri 33/11kV Kerimattihalli F3-Sangur IP 160 2582 7.8 13.63 902 4.4 2.96 10.67 33/11kV Kerimattihalli Existing Sangur-1 1680 4 8.4 20.5 2053315.0 0.58 0.25 0.05 0.28 0.13 9.8 4.43 Not required (Y Operation) 14 5.13 4.431857752
3 Haveri Haveri Haveri 33/11kV Kerimattihalli F7-Gourapur IP 170 1865 14.95 30.11 1052 11.5 12.46 17.65 33/11kV Kerimattihalli Existing Gourapur-1 813 4 15.5 20.5 2053315.0 1.11 0.11 0.29 0.71 0.13 5.32 4.43 Not required (Y Operation) 15 5.13 4.431857752
4 Haveri Haveri Haveri 33/11kV Kerimattihalli F8-Herur IP 160 2056 8.7 15.77 413 3.45 1.5 14.27 33/11kV Kerimattihalli Existing Herur-1 1643 4 7.45 20.5 2053315.0 0.89 0.27 0.14 0.48 0.14 8.61 4.77 Required 17 5.13 4.772769887
5 Haveri Haveri Savanur 110/33/11KV Savanur F-6 Maruthipura EIP 210 5748 17.02 27.51 2142 9.32 6.81 110/33/11KV Savanur Existing Maruthipura-1 3606 4.57 26.34 24.9 2486043.0 1.7 0.2 0.7 0.80 0.16 17.4 4.51 Not required (Y Operation) 3 5.44 4.505229284
6 Haveri Haveri Savanur 110/33/11KV Savanur F-15 Kalalkonda NJY 64 2944 26.35 8.46 1892 26.35 6.58 110/33/11KV Savanur Existing Kalalkonda-1 1015 2.533 36.95 17.98 1706372.00 0.24 0.02 0.12 0.10 0.10 2.04 3.89 AB cable by overhead due to ab cable fault 4 7.10 3.893214683
7 Haveri Haveri Savanur 110/33/11KV Savanur F-3 Plantation EIP 200 3556 11.1 9.66 1917 7.6 4.54 110/33/11KV Savanur Existing Plantation-1 1641 3.55 14.25 21.2 2124378.0 0.3 0.1 0.1 0.1 0.13 4.99 4.28 Not required (Y Operation) 5 5.98 4.284369115
8 Haveri Haveri Savanur 110/33/11KV Savanur F-7 Kurubarmallur EIP 210 5131 12.55 20.6 1351 3.6 18.03 110/33/11KV Savanur Existing Kurubarmallur-1 3780 4.57 14.05 22.6 2257098.0 0.1 0.0 0.1 -0.0 0.15 11.3 4.65 Not required (Y Operation) 8 4.94 4.652193177
9 Haveri Haveri Shiggaon 33/11kV Hulugur F3-Basavanal IP 150 2946 11.4 9.2 1904 11.8 7.35 33/11kV Hulugur Existing F4-Kengapur IP 2408 4.5 16.3 17.2 1722800.0 0.3 0.0 0.2 0.2 0.11 8.34 4.47 Not required (Y Operation) Interlink 5 3.83 4.469468307
10 Haveri Haveri Shiggaon 110/11kV Shiggaon F11-Bannur 195 2160 16.65 20.07 1828 15.2 8.15 110/11kV Shiggaon Existing F-11 Bannur -1 1679 3.1 18.3 16.2 1619858.0 0.4 0.1 0.1 0.2 0.11 10.31 4.75 Required 14 5.23 4.753503085
GRAND TOTAL 39.3 #REF! #REF! 20454299
2 Haveri Haveri Hanagal 33/11 kv MUSS Hanagal F3 KAMANAHALLI 200 3126 12 6.64 1143 12 3.85 33/11 kv MUSS Hanagal Existing Chikkeri Hosalli 1143 4 12 24.0 0.13 3.85 3.80 Not required (Y Operation) 5.99 3.798963843
3 Haveri Haveri Hanagal 33/11 kv MUSS Bommanahalli F-7YALIWALA 198 1706 7.35 3.44 904 5.75 1.3 33/11 kv MUSS Bommanahalli Existing Yaliwal 1706 6 0.3 34.1 0.17 2.17 3.49 Not required (Y Operation) 5.68 3.490306188
4 Haveri Haveri Hanagal 33/11 kv MUSS Laxmiur F9 SAVIKERI 198 3858 21.45 15.07 1203 6.05 1.48 33/11 kv MUSS Laxmiur Existing Balihalli 1678 6.09 12.65 36.9 0.36 3.85 6.84 Not required (Y Operation) 6.05 6.83762168
5 Haveri Haveri Hanagal 33/11 kv MUSS Bommanahalli F-5NITAGINKOPPA 180 1690 12.75 6.9 751 12.75 6.9 33/11 kv MUSS Bommanahalli Existing Yllur Plat 1690 5.08 12.75 26.5 0.17 2.17 4.49 Not required (Y Operation) 5.22 4.491618602
6 Haveri Haveri Hanagal 33/11 kv MUSS Bommanahalli F4 BADAMAGATTI 195 1731 7.08 2.1 1077 8.95 3.52 33/11 kv MUSS Bommanahalli Existing Nellikoppa 1731 2 7.08 11.7 0.12 2.17 7.19 Not required (Y Operation) 5.84 7.191220547
5 Haveri Haveri Shiggaon 33/11kV Shiggaon F7-Motalli NJY 65 1616 37.76 9.58 1015 27.93 3.5 110/11kV Shiggaon Existing Motalli NJY-1 576 9.3 37.23 47.1 0.16 1.5 2.38 Canceled 5.06 2.37911494
6 Haveri Haveri Shiggaon 33/11kV Shiggaon F2-K.S.R.P 75 5068 19.58 10.5 3880 16.23 6.95 110/11kV Shiggaon Existing F10-Shiggaon 7500 0.243 16.473 12.4 0.09 5.5 5.09 Canceled 50.94 5.089272299
16 Haveri Haveri Haveri 110/33/11kV Guttal F1-Hounsi 200 3606 10.55 25.64 1978 6.05 10.49 110/33/11kV Guttal Existing Hounsi-1 1628 9.5 15.55 59.3 0.23 4.81 2.71 Required 6.24 2.71406789
7 Haveri Haveri Haveri 33/11kV Kerimattihalli F8-Herur IP 160 2056 8.7 15.77 413 3.45 1.5 33/11kV Kerimattihalli Existing Herur-1 1643 4 7.45 20.5 0.29 6.28 9.92 Required 5.13 9.920543122
11 Haveri Haveri Hanagal 110/33/11 kv MUSS Tilavalli F2 JALI 200 1891 10.19 5.35 1064 9.98 3.33 110/33/11 kv MUSS Tilavalli Existing Yattinhalli 1891 7 10.19 40.8 0.13 6.87 2.23 Required 5.83 2.229976223
12 Haveri Haveri Hanagal 110/33/11 kv MUSS Tilavalli F4 KALAGUDDI 195 1940 7.75 2.47 1127 6.85 1.76 110/33/11 kv MUSS Tilavalli Existing Hallibail 1940 8.33 7.75 48.0 0.17 6.87 2.48 Required 5.76 2.478974546
13 Haveri Haveri Hanagal 33/11 kv MUSS Belagalapeth F6 MASANAKATTI 200 2782 12.86 10.19 1754 10.3 5.13 33/11 kv MUSS Belagalapeth Existing Ramapur 2782 8 2.35 35.6 0.37 2.17 7.27 Required 4.45 7.267908871
14 Haveri Haveri Hanagal 33/11 kv MUSS Belagalapeth F4 KADASHETTIHALLI 200 3195 11.87 8.68 2418 8.72 5.34 33/11 kv MUSS Belagalapeth Existing Savasagi 3195 12 11.87 56.9 0.25 2.17 3.08 Not required (Y Operation) 4.74 3.076157215
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
ZONE : HUBBALLI
CIRCLE : HAVERI
DIVISION : HAVERI
SUB DIVISION : HAVERI, HANGAL, SHIGGAON, SAVANUR
LINK LINE ABSTRACT
SUB DIVISION : HAVERI
NAME OF THE STATION 110/33/11kV Haveri 200
NAME OF THE EXISTING FEEDER Kurubagonda
ESTIMATE COST in Rs. 3589552 3589552 Material Cost Labour Cost
Sl. No Particulars Unit Kurubagond -1 TOTAL Rate Amount Rate Amount
HT Line (RKM) 0.39408867 0.39
2 9 Mtr. PSCC Pole 200kG WL No 0 0 4199 0 1742 0
11 Mtr. PSCC Pole 365kG WL 0 0 7913 0 2583 0
3 RCC Pole - 8 Mtr Long, 115 Kg WL Nos. 0 0 5129 0 1425 0
3 PSC Pole - 8 Mtr Long, 115 Kg WL Nos. 0 0 3699 0 1425 0
3 RCC Pole - 8 Mtr Long, 115 Kg WL for stud Nos. 4 4 5129 20516 1425 5700
3 PSC Pole - 8 Mtr Long, 115 Kg WL for stud Nos. 0 0 3699 0 1425 0
4 2 Pin cross for Stud Nos. 8 8 266 2128 160 1280
Special 3Pin cross for Stud 0 0 1151 0 160 0
5 H.T X arms with HTST supports bolts & nuts etc (RCC) Set 4 4 646 2584 272 1088
6 H.T X arms with HTST supports bolts & nuts etc (PSCC) Set 0 0 643 0 272 0
6 LT 4 Pin cross arm for RCC Set 0 0 423 0 160 0
6 LT 4 Pin cross arm for PSC Set 0 0 420 0 160 0
7 Double pole structure complete including 5KG ,8SWG Wire for structure Grounding for 9Mtr RCC POLES Sets 2 2 20928 41856 5392 10784
8 11kv, 5KN polymeric Pin insulator No 18 18 205 3690 0 0
9 11kV 45 KN polymeric insulator No 6 6 186 1116 0 0
10 Spiral earth electrode No 2 2 239 478 93 186
11 Guy set complete with No 15 Strain Insulator and Concreting Materails Set 4 4 1170 4680 593 2372
12 Concreting of Guy sets with Boulders, Mud sand No's 4 4 0 0 250 1000
13 Rabbit ACSR Conductor 1.5% Sag Kms. 1.2 1.2 58537 70244.4 4361 5233.2
14 PG Clamps for Rabbit No's 0 0 102 0 0 0
15 EG Stirrups with GI Wire lacing Set of 2Nos 0 0 276 0 160 0
16 Caution / Danger Board No 0 0 150 0 80 0
17 Anti Climbing Divice Kg 0 0 89 0 42 0
18 Guarding Material Span 0 0 4140 0 1194 0
Guarding between HT Road crossing(Including 4 pin "X" Span 0 0 4900 0 762 0
Croos Arm With clamps & bolts,Nuts por Gurding Set 0 0 420 0 160 0
20 GOS 200A single break Nos 2 2 9450 18900 1104 2208
21 H - Frame Set for 11kV, 200Amps Single Break 005 Mounting - Nos 2 2 4332 8664 323 646
22 Complete erection of M-Type Towers 2 2 394980 789960 22798 45596
13 R & R off Rabbit ACSR Conductor 1.5% Sag Kms. 0 0 0 0 4361 0
Sub-Total (I) 978968.4 79577.2
RCC / PSC 9 Mtr Pole No #REF! 1742 #REF!
RCC / PSC 8 Mtr Pole No #REF! 1742 #REF!
Horizantal Cross arms Set #REF! 272 #REF!
Weasel Condcutor Kms. #REF! 3180 #REF!
Sub-Total (I) 0 #REF!
GRAND Total 978968.4 #REF!
Energy Savings 24.170316
ESTIMATE COST 315413
CB Ration 1.427110381
Sl No Particular Formula Kurubagond -1
1 Interest Charges A 10%
2 O&M Charges B 1.10%
3 Project Life C 25Years
4 Annuity Charges D 9.07
5 Capital Investment in Rs E 315,413
6 Energy Rate Per KWH at 11kv BUS F 8.3
7 Annual O&M Expenses in Rs G=E*B 3470
8 Present Worth of Annual Expenses During the Life of Assests in Rs H=G*D 31469
9 Present Worth of Cash Outflow in Rs I=H+E 346882
10 Annual Reduction of Energy Losses in KWH J 9821
11 Annual Benifit due to Reduction of Energy Losses in Rs K=J*F 81514
12 Prasent Worth of cash in flow HVDS in Rs (Total Benefit in Reduction of Annual EnergyLosses During Life period of Assets) L=K*D 739335
13 Benefit to Investment ratio M=L/I 2.13
14 Payback Period in Years N=I/K 4.26
Construction of 39 nos of 11kV link lines from various S/s For a distance of 209.7 Km in Hangal and Savanur sub div of Haveri Division on total turn key and lumpsum basis.
Sl. No. Particulars Savanur Hangal Material Erection Total
Grand Total (Material cost+ Labour Cost) #REF! #REF! #REF!
1 Material cost #REF! #REF! #REF! #REF!
2 Labour charges #REF! #REF! #REF! #REF!
3 GST @ 18% on labour charges #REF! #REF!
4 Contribution towards Employee Provident Fund & ESI Charges on Total labour charges at 16.25% #REF! #REF!
5 Transportation cost from stores to site @ 2% on material cost #REF! #REF!
6 Watch and ward cost @ 1% on material cost #REF! #REF!
7 Insurance cost against theft & accident @ 1% on material cost #REF! #REF!
8 Performance guarantee and loss of interest on margin money fo BG @ 2.5% of the value of BG #REF! #REF! #REF!
9 Total Cost (1 to 9) #REF! #REF! #REF!
Tender Component #REF! #REF!
Construction of 39 nos of 11kV link lines from various S/s For a distance of 209.7 Km in Hangal and Savanur sub div of Haveri Division on total turn key and lumpsum basis.
Sl. No. Particulars Haveri Shiggaon Basavanakatte Adavisomapur Total
Grand Total (Material cost+ Labour Cost)
1 Material cost 0 0 0 0 0
2 Labour charges 0 0 0 0 0
3 GST @ 18% on labour charges #REF!
4 Contribution towards Employee Provident Fund & ESI Charges on Total labour charges at 16.25% #REF!
5 Transportation cost from stores to site @ 2% on material cost #REF!
6 Watch and ward cost @ 1% on material cost #REF!
7 Insurance cost against theft & accident @ 1% on material cost #REF!
8 Performance guarantee and loss of interest on margin money fo BG @ 2.5% of the value of BG #REF!
9 Total Cost (1 to 9) #REF!
Tender Component
Sl. No. Particulars Total
1 Material cost (Exclusive of GST) 978968
2 Labour charges (Exclusive of GST) 79577
3 BASIC RATE 1058546
4 Area Specific Loading on Basic Rates (Sl No. 3) wherever applicable 0
5 Applicable GST on Sl No. 3 & 4 190538
6 Cost of Estimate (Sum of Sl No. 3 to 5) (Amount Put To Tender) 1249084
7 Statutory Charges as per actuals (Inspectorate Charges, Civic Body Charges, Compensation Etc.,) 3000
8 Total Cost of Estimate (Sum of Sl No. 6 & 7) 1252083.8
Tender Capacity Format
Details of work Executed during last 05 years ( To asses the value of A)
Sl No Year Work Executed Other related Electrical Works if any Cost of executed work in Rs Lakhs
HT line in Rkms LT line in Rkms DTC in Nos
Details of existing commitments and on-going works to be completed during next 13 months ( To asses the value of B) Attached in the next sheet
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "13 months" Rs in Lakhs Completion period as per award Completion period remaining
Tender Capacity Formula= A*N*1.5-B =A*1*1.5-B
Where 'N'= 13 months of completion period for above subject work
Seal and signature of the Bidder
A= Maximum value of Distribution network work executed in any one year during the last 5 years i.e 2020-21,2021-22,2022-23, 2023-24 & 2024-25 ( UP dated to __________________ price level) taking into account the completed as well as works in progress
N= Number of years/months prescribed for completion of the works for which Tenders are invited
B= Value,at________price level, of existing commitments and on-going works to be completed during the 'N'
Note: 1) The available tender capacity shall be more than the total tender value 2) Documentary Proof in support of value ‘A’, the Total value of works executed and payments received annually in the last 5 years shall be uploaded in the form of certificates issued by Chartered Accountant. In case if the same is not uploaded, then the maximum value of annual payments received towards the works executed which is indicated in the audited balance sheet in any one year during the last five years will be considered.
Tender Capacity Format
Details of existing commitments and on-going works to be completed during next " 13 months ( To asses the value of B)
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "13 months" Rs in Lakhs Completion period as per award Completion period remaining
Where 'N'= 13 months of completion period for above subject work
Note: The statement showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed shall be countersigned by the Employer in charge, not below the rank of Executive Engineer or equivalent.( Note: L-1 in any of the recently called tender amount is also be considered as value of B along with the above)
Seal and signature of the Executive Engineer(Ele)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
11 Bailhongal - Savadatti Indent 1083 BOQ.xlsx
Others - BOQ • 1.05 MB
2_section-i IFB INDENT 1083.doc
Others - IFB • 1.54 MB
10 FD417EXP-12-2024-Dtd-09-08-2024.pdf
Others - FD Circular • 0.12 MB
4_section-iii_GCC INDENT 1083.doc
Others - GCC • 0.13 MB
8 tender capacity.xlsx
Others - Tender capacity • 0.02 MB
13 KPTCL Cicrcular insurance surety bond.pdf
Others - Circular • 1.59 MB
4_section-iii_GCC INDENT 1083.doc
Others - GCC • 0.13 MB
12 Stamp Duty Circular 02 03 2024.pdf
Others - Stamp Duty • 0.09 MB
9 Advisory NOte.pdf
Others - Advisory Note • 0.67 MB
6_section-v_SCC KW4INDENT 1083.doc
Others - SCC • 0.09 MB
3_section-ii_ITB INDENT 1083.doc
Others - ITB • 0.11 MB
7 Annexures.doc
Others - Annexure • 0.16 MB
1 NIT 1083.docx
Others - NIT • 0.11 MB
5_section-iv_ECC INDENT 1083.doc
Others - ECC • 0.09 MB
Download all tender documents and submit your bid