Loading…
Loading…
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
21 Sept 2026, 6:00 pm6d left
Executive Engineer, REW Jammu
Office of the Executive Engineer, REW Jammu
CONSTRUCTION OF PROTECTION WALL AND PLATEFORM OF TALAB (CHAPAD) NEAR TEMPLE AT GULABA CHAPAD PANCHAYAT DORI BLOCK KHARAH BALLI UNDER THE SCHEME CD AND PANCHAYAT FOR THE YEAR 2026-27
2026_RDPR_323643_3
e-NIT No. 549 REWJ of 2026-27 dated 07-09-2026
Open Tender
Civil Works
Percentage
30 days
Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹4,000
7 Sept 2026
7 Sept 2026
22 Sept 2026
7 Sept 2026
21 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:ALL KINDS OF SOIL | 10.5 | CUM | 479.3 | ₹5,032.65 |
| 2 | P/L CEMENT CONCRETE OF 1 5 10 MIX EXCL THE COST OF CENTERING AND SHUTTERING ALL COMPLETE WITH 40MM NOMINAL AGGREGATES | 0.88 | CUM | 4,826.5 | ₹4,247.32 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 MIX with 20mm nominal aggregates all complete. | 24.26 | CUM | 5,733.6 | ₹1,39,097.14 |
| 4 | SUPPLY AND FILLIG OF STONES | 10.4 | CUM | 900 | ₹9,360 |
| 5 | CENTERING AND SHUTTERING INL PROPPING , REMOVAL OF FORMWORK. | 47 | SQM | 286.35 | ₹13,458.45 |
| 6 | Excavating, supplying and filling of local earth including royality in AKOS | 32.03 | CUM | 276.6 | ₹8,859.5 |
| 7 | SAND FOR 10 KM | 11.81 | CUM | 279.04 | ₹3,295.46 |
| 8 | AGG FOR 25 KM | 23.62 | CUM | 465.14 | ₹10,986.61 |
| 9 | STONES FOR 10 KM | 10.4 | CUM | 328.31 | ₹3,414.42 |
| 10 | ADD COST OF SIGN BOARD INCL WRITING, PAINTING COMPLETE JOB | 1 | JOB | 3,000 | ₹3,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1090078.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .