Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAdmitted-Finance | ₹11.3 L | L1 | Admitted-Finance |
| 2 | L2₹11.5 LAdmitted-Finance A 25 NEW COLONY KALAGARH DISTRICT PAURI GARHWAL PIN 246142 UTTARAKHAND | PAURI GARHWAL | UTTARAKHAND | 246142 | ₹11.5 L | L2 | Admitted-Finance |
| 3 | L3₹11.6 LAdmitted-Finance | ₹11.6 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | pawan kumar L2 | S R CONTRACTOR AND TRAADERS L3 | M/S W M ENGINEERING WORKS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Repairing and Strengthening of End Box by cutting damaged End box Plate and Replacing it with new M. S. Sheet properly welding it with gate including all material, labour and required T&P at Gate No 11 of Lahchura Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. . | 1 | Job | 1,49,350 ₹1.5 L | 1,52,380 ₹1.5 L | 1,47,847 ₹1.5 L |
| 2.00 | Installing new Main Roller Assembly with new Bearing including cost of all material, labour and T&P required for proper completion of work at Gate No 11 of Lahchura Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. | 4 | Job | 2,50,254 ₹10.0 L | 2,52,754 ₹10.1 L | 2,46,254 ₹9.9 L |
Tender Value
Refer Docs
EMD Value
₹24,300
Closing Date
12 May 2026, 10:00 amClosed
Executive Engineer
Office of Executive Engineer, Barrage Mechanical Maintenance Division, Kanpur Irrigation Department U.P., 67-A, Cantt, Kanpur-208004
Installing new Main Roller Assembly with new Bearing and Strengthening of End Box of Lahchura Dam
2026_UPIDM_1142874_1
11/EE/BMMDK/2026-27 (LOT-2)
Open Tender
Miscellaneous Works
90 days
Lahchura Dam, Mahoba
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹24,300
17 May 2026
28 Apr 2026
12 May 2026
28 Apr 2026
12 May 2026
28 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairing and Strengthening of End Box by cutting damaged End box Plate and Replacing it with new M. S. Sheet properly welding it with gate including all material, labour and required T&P at Gate No 11 of Lahchura Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. . | 1 | Job | - | - |
| 2 | Installing new Main Roller Assembly with new Bearing including cost of all material, labour and T&P required for proper completion of work at Gate No 11 of Lahchura Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. | 4 | Job | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
TD11Lot-2.pdf
Tender Documents • 0.93 MB
BOQ_2134487.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid