Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC 12 6 1 PANCHRATNA INDUSTRIAL ESTATE B H RAMOL VATVA EXPRESS OVER BRIDGE VATVA AHMEDABAD GUJARAT 382445 | AHMADABAD | GUJARAT | 382445 | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.2 L+₹2,478 (0.48%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Uploaded document not matching with Bidder Name |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
8 Sept 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Managing Director, PPCL
PPCL, T.R.Pattinam ,Karaikal 609 606
Works of Corroded Pipelines Replacement in PPCL Power Plant Area
2023_PPCL_13402_1
Z-047 Corroded Pipelines Replacement in Plant Area
Open Tender
Miscellaneous Works
Item Rate
7 days
PPCL, T.R.Pattinam, Karaikal 609 606
As per NIT PART III
4 documents required · 4 mandatory
₹0
₹10,000
Yes
18 Dec 2023
4 Aug 2023
11 Sept 2023
4 Aug 2023
8 Sept 2023
4 Aug 2023
Amount
Area of Work and Work Description
DM Water Storage tank Cooling water makeup 4 inch corroded pipe line from water treatment plant to Cooling tower sump about 20 meter long along with one no of 4 ” elbow at height of 3 meter floor level pipe rack near DM storage tank to be replaced.
Steam-Turbine Generator area stair case Cooling water to sample cooler 4 inch pipe line from Ejector floor to STG stair case approach about 12 meter long along with three numbers of 4 ” elbow at a height of 4 meter floor level pipe rack in front of STG ejector in/out side of wall to be replaced.
Steam-Turbine Generator area Lubrication oil cooler Cooling water line 6 inch inlet pipe line to LUB oil cooler near Ejector about 4 meter long with 1 number of 4 ” elbow and one 4 inch Tee at a height of 2 meter floor level to be replaced.
Steam-Turbine Generator Air-cooler Cooling water line 4 inch inlet pipe line to Generator cooler control room side about 2 meter long with 1 number of 4 ” elbow at a height of 2 meter floor level to be replaced.
Gas Turbine Erection of New water filter system GT lub oil cooler with modification of pipe line ( Both inlet and outlet pipe line), valves, bellows, flanges, etc as per instruction of Engineer In-charge and as per the layout of drawing enclosed.
Gas Turbine Generator cooler Generator cooler from wall entry point to Generator – complete set of inlet and outlet pipe line 6 inch with bends, bellows and fittings to be replaced by new and also to be rerouted as per instruction of engineer in-charge. Refer drawing -3.
Steam turbine oil system AOP and EOP discharge pipe line NRV (3 inch and 4 inch) providing by modification of discharge line by providing fabricated distance pieces with flanges suitable for existing system.
Gas Booster Compressor (GBC) GBC1,3,4 cooling water inlet line 4 inch pipe line each 6 meters with elbow and fittings as per the existing system to be replaced as per instruction of Engineer in-charge.
Gas Booster Compressor (GBC) GBC 2,3,5 cooling water outlet line 4 inch pipe each 6 meters with elbow and fittings as per the existing system to be replaced as per instruction of Engineer in-charge.
Gas Booster Compressor (GBC) GBC 1,2 and 3 Gas discharge pipe line rerouting in order to remove inter cooler tube bundle without disturbing the intercooler shell as per instruction of Engineer in -charge. Refer GA drawing no-2. Needs IBR welder with NDT testing (Radiography test)
Instrument Air Compressor (IAC) Cooling water inlet 3 inch pipe line of 24 meter with 2 elbows to be replaced near raw water pump house pipe rack.
Cooling Water Pump House (CWPH) Cooling water pump discharge header line 3 inch inter connection line about 6 meter with elbow 2 nos and tee one no. to be replaced.
Auxiliary Cooling Water Pump House (ACWPH) Auxiliary Cooling water pump-1 suction rubber bellow to be provided with flanges as per the instruction of engineer in –charge and pump suction and discharge line 1 meter length to be replaced.
Cooling Water Pump Number-1 (CWP-1) Discharge Swing check valve fixed in CWP system to be removed by cutting and welding. New valve to be installed by cutting and welding.
CIMECH ENGINEERS AND CONTRACTORS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .