Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | -0.02% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.1 L+₹9,713.53 (3.27%)Admitted-Finance | +3.25% | ₹3.1 L+₹9,713.53 (3.27%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 L+₹17,436.82 (5.87%)Admitted-Finance 3 1 120 ANANDA PALIT ROAD ADJACENT AREA IN WARD NO 55 | KOLKATA | WEST BENGAL | 700001 | +5.85% | ₹3.1 L+₹17,436.82 (5.87%) | L3 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
5 Aug 2026, 12:00 pmClosed
EXECUTIVE ENGINEER (ROADS)
CHAPLIN BHAVAN, 2ND FLOOR, 5/1 CHOWRINGHEE PLACE, KOLKATA-700013
REPAIRING OF ROAD SURFACE BY LAYING CONCRETE BLOCK AT DIFFERENT SPOTS OF B B GANGULY STREET, BENTINCK STREET AND SURROUNDINGS IN WARD 46, BR-VI.
2026_KMC_1033210_1
KMC/ROADS/2026-2027/60
Open Tender
CIVIL WORKS
Percentage
120 days
KOLKATA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
20 Aug 2026
25 Jul 2026
7 Aug 2026
25 Jul 2026
5 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed.
(a) By manual means :
(iii) Above 100 mm thick. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 18.02 Page No.331) | - | SQM | 45.2 | - |
| 2 | Taking out stone slab of kerb & channel of road side drain and stacking as directed.
b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | - | MTR | 8.17 | - |
| 3 | Earthwork in cutting to form road section in correct profile including removal of spoil not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works | - | M3 | 89.9 | - |
| 4 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
(b) Where staging is not required. ( Ref :PWD (Rds & Brdgs)-2018, Page No. 332, It. No. 18.05) | - | SQM | 214 | - |
| 5 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety ( Ref :PWD (Bldg.)-2017, page-24 (item -4(a), consumption chart pg-B-60, sl-1 and Annexture-II , Format-A, 3rd Corrigenda & addenda p-10 dtd-04.06.2018, PWD(R&B) 2018, Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, ) | - | M3 | 5,732.59 | - |
| 6 | Wet Mix Macadam Base Course Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting. guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(Rate as per PWD(WB) schedule of rates 2018(Roads & Bridge Work) , page-249(item-4.12) & 212(table3.3-1) and 4th Addenda & Corrigenda) | - | M3 | 2,421.44 | - |
| 7 | Supplying and Laying in the specified pattern of Interlocking Concrete Block Pavements (ICBP) with concrete blocks (with concrete grade as specified as per Table 1 of IS 15658 : 2006) manufactured in steel mould clamped to a vibrating table by hydraulic pressure (as per cl. no. 6.30 of IRC: SP: 63 (2018), from BIS licensee manufacturer, with spacer nib (Small protruding profiles on the vertical face of a paver block used as a device for keeping minimum joint gap in between the paving blocks, as per Cl. No 3.26 of IS: 15658)and of specified size and shape with aspect ratio (The ratio of length to thickness of a paver block, as per CLNo.3.3 of IS: 15658) as per Table of IS :15658 with flexural strength/breaking load as per Annexure G of IS: 15658, on the prepared base course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a cushion of compacted bedding sand of 25-35 mm thick (grading of the bedding sand as per clause 6.5.1 of IRC SP 63) and filling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will be as per clause 6.5.2 of IRC SP 63) and completing the edges with cut blocks us per Cl. No. 8.7 of IRC SP-63(2018) with proper confinement of bedding and joint filling sand, compaction levelling and filling up of the edge gap. 100 mm thick. a) Grey (12th Corrigenda & addenda dated14.10.2020) | - | SQM | 1,433 | - |
| 70 | Sub Total | - | - | - | - |
| 71 | GST 18% | - | Nos. | 60,000 | - |
| 72 | CESS 1% | - | Nos. | 5,600 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
form1.pdf
Tender Documents • 8.85 MB
BOQ_2537472.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .