Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹7.0 L+₹41,459 (6.25%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹8.3 L
EMD Value
₹82,920
Closing Date
9 Oct 2026, 3:00 pmClosed
CE
KMC
Imp. Of Nali and C.C. Sarvice lane from Babu purwa Labour colony in Block No 194/2 to 198/6 and Block No 200in ward 100 Zone 03
2026_NNKAN_1191801_1
225/AA-3/26-27
Open Tender
Civil Works
Fixed-rate
45 days
zone 3
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹82,920
17 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Surface excavation not exceeding 30 cm in depth but ceeding etc all comp | 60.75 | cum | 170 | ₹10,327.5 |
| 2 | R.C.C. Work providing and laying in position cement concrete of specified grade excluding etc all comp | 8.1 | cum | 4,380 | ₹35,478 |
| 3 | Class-150 brick Work in 1:4 cement & coarse sand mortar in foundation and plinth including etc all comp | 23.7 | cum | 6,600 | ₹1,56,420 |
| 4 | 12 mm cement plaster 1:3 ( 1 ceement:3 coarse sand) finished with a floating coat of neat cement etc all comp | 165 | sqm | 257 | ₹42,405 |
| 5 | R.C.C. work Construction of granular sub base GSB Construction of granular su base GSB by Providing close graded material etc all comp | 27.5 | cum | 3,676 | ₹1,01,090 |
| 6 | R.C.C. work providing and laying in position Ready Mixed concrete manufactured etc all comp | 33 | cum | 8,538.54 | ₹2,81,771.82 |
| 7 | R.C.C. Work with cement approved coarse sand and 20 mm approved stone raft etc all comp | 4.61 | cum | 8,600 | ₹39,628.8 |
| 8 | M.S or iron in plain Work such as hevey size as fabrication of M.S or iron in plain Work such etc all comp | 3.62 | Qtl | 7,200 | ₹26,064 |
| 9 | Supply and fixing of Sign board With pedatal including all labour Work Supply and fixing of Sign board With etc all comp | 1 | Nos | 3,840 | ₹3,840 |
| 10 | disposal of earth up to 3 km loading and unloading etc all comp | 48.6 | cum | 116.96 | ₹5,684.26 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.74 MB
BOQ_2248726.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .