Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | L1 | Accepted-AOC Found lowest one bidder | |
| 2 | L2₹5.6 L+₹9,837 (1.80%)Rejected-AOC HOUSING COLONY | L2 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹6 L
Closing Date
23 Nov 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
REW Leh
Construction of motorable culvert at Martselang and Halabagh
2022_RDD_8445_5
NIT 56 - UTL REWL OF 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Payable To Executive Engineer
Exempted
21 Feb 2023
16 Nov 2022
25 Nov 2022
16 Nov 2022
23 Nov 2022
16 Nov 2022
Amount
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil
Providing and laying dry stone pitching (any thickness) including cost of stone on horizontal level.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) (A) Crushed
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size.
Centring and shuttermg including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Pos ts and Struts
Centring and shuttermg including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform.
Centring and shuttermg including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls. Under 20cms wide
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars.
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil:
Carraige of earth from 1 km to site by Mechanical transport
Carraige of Cement and steel from an average 45 Km by Mechanical transport
Carriage of sand and aggregate from an average lead up to 25 Km by Mechanical Transport
M/S TSEWANG YANGJOR GOVT CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .